Planning application

ABBEY FARM HOUSE, LAVENDON GRANGE, LAVENDON, OLNEY, MK46 4HL

Granted Milton Keynes PLN/2026/0126 Listed building consent (alterations or extension)

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Listed building consent for single storey front extension and first floor roof extension to form covered first floor balcony, extension and conversion of existing single storey open-sided barn to form new habitable space

As published by the council, reference PLN/2026/0126

Application record

Reference
PLN/2026/0126
Type
Listed building consent (alterations or extension)
Status
Decision Made
Decision
Approved with Conditions
Received
21 Jan 2026
Validated
27 Jan 2026
Decided
24 Mar 2026
Ward
Olney
Parish
Lavendon
Decision by
Delegated Decision
Postcode
MK46 4HL

Timeline

Dates from the published record

  1. 21 Jan 2026

    Received by Milton Keynes

  2. 27 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 24 Mar 2026

    Decision issued: Approved with Conditions

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

  • ABBEY FARM HOUSE, LAVENDON GRANGE, LAVENDON, OLNEY, MK46 4HL

    PLN/2026/0849 Submitted 24 Apr 2026 0m away

    Proposed alterations to main house to form new balcony and extended roof, extension and conversion of existing single storey open-sided barn to form new recreational facilities

    Refused Householder Extension 18 docs
    Small domestic
  • ABBEY FARM HOUSE, LAVENDON GRANGE, LAVENDON, OLNEY, MK46 4HL

    PLN/2026/0119 Submitted 21 Jan 2026 0m away

    Single storey front extension and first floor roof extension to form covered first floor balcony, extension and conversion of existing single storey open-sided barn to form new habitable space

    Refused Householder Extension 18 docs
    Small domestic
  • ABBEY FARM HOUSE, LAVENDON GRANGE, LAVENDON, OLNEY, MK46 4HL

    PLN/2026/1691 Submitted 11 Aug 2026 0m away

    92% historically approved · decision due ~7 Oct

    Proposed alterations to main house to form new balcony and extended roof, extension and conversion of existing single storey open-sided barn to form new recreational facilities

    Awaiting decision Householder Extension 23 docs
    Small domestic
  • Abbey Farm House Lavendon Grange Lavendon Olney MK46 4HL

    22/02925/LBC Submitted 23 Nov 2022 77m away

    Listed Building Consent for the proposed changes to the pile approved under 22/01687/LBC

    Granted Heritage and listed buildings 11 docs
  • West Wing Lavendon Grange Lavendon Grange Lavendon Olney MK46 4HL

    19/02470/LBC Submitted 26 Sep 2019 162m away

    The application is for a single existing partition wall to be removed between the Breakfast room and the Dining room. These rooms are within an extension that was added in 1999.

    Granted Heritage and listed buildings Extension 13 docs
  • West Wing Lavendon Grange Lavendon Grange Lavendon Olney MK46 4HL

    19/02469/FUL Submitted 26 Sep 2019 162m away

    The application is for a single existing partition wall to be removed between the Breakfast room and the Dining room. These rooms are within an extension that was added in 1999.

    Granted Full applications Extension 11 docs

In Milton Keynes

  • PLN/2026/1373 Granted

    19 HIGH STREET, EMBERTON, OLNEY, MK46 5JB

    Listed building consent for the proposed widening of the existing opening between the Kitchen and Informal Dining spaces, including the partial demolition of an existing wall and bulkhead

    30 Jun 2026 Heritage and listed buildings
  • PLN/2026/0467 Granted

    HOWE PARK HOUSE, 32 HENGISTBURY LANE, TATTENHOE, MILTON KEYNES, MK4 3AB

    Listed Building Consent for the proposed erection of garden fencing (Retrospective)

    9 Mar 2026 Heritage and listed buildings
  • PLN/2026/1179 Decided

    442 SIMPSON, SIMPSON, MILTON KEYNES, MK6 3AD

    Listed building consent for the proposed removal of rotten close boarded fence and gate to right hand side of property and replace with pre treated close boarded fence

    3 Jun 2026 Heritage and listed buildings
  • PLN/2026/1368 Granted

    BLETCHLEY PARK, SHERWOOD DRIVE, BLETCHLEY, MILTON KEYNES, MK3 6EB

    Listed building consent for installation of ASHP and associated equipment across two locations (The Mansion/Hut 4 and Block E) and the removal of the existing oil boilers and oil storage tanks

    19 Jun 2026 Heritage and listed buildings
  • PLN/2026/1701 Awaiting decision

    STONEBRIDGE HOUSE FARM, NEWPORT ROAD, NEW BRADWELL, MILTON KEYNES, MK13 0DY

    Listed building consent for remedial and repair work consisting of the construction of an additional brick pier, and the repair of two separate stepped diagonal cracks within the coursed rubble stone wall of the main house

    12 Aug 2026 Heritage and listed buildings