Skip to content
PlanIndex Get alerts
Menu

Planning application

2 BROOK END, NORTH CRAWLEY, NEWPORT PAGNELL, MK16 9HH

Granted Milton Keynes PLN/2025/2449 Prior approval: Upwards home extension

Works: Extension Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Prior Approval of upward extension to provide additional storeys to dwellinghouse, with an overall maximum height of 8.69 metres

As published by the council, reference PLN/2025/2449

Application record

Reference
PLN/2025/2449
Type
Prior approval: Upwards home extension
Status
Decision Made
Decision
Approved
Received
14 Nov 2025
Validated
14 Nov 2025
Decided
8 Jan 2026
Ward
Olney
Parish
North Crawley
Decision by
Delegated Decision
Postcode
MK16 9HH

Site history

Applications at this address on the Milton Keynes register

This site has had 4 applications since 2024: 2 approved, 1 refused.

  • PLN/2026/0839 Awaiting decision

    2 BROOK END, NORTH CRAWLEY, NEWPORT PAGNELL, MK16 9HH

    Demolition of an existing single storey rear extension and detached outbuilding and the erection of a porch, two-storey side, single storey rear and first floor extensions with roof lights.

    Submitted 23 Apr 2026 Householder
  • PLN/2025/2445 Granted

    2 BROOK END, NORTH CRAWLEY, NEWPORT PAGNELL, MK16 9HH

    Certificate of lawfulness for proposed site extensions, front porch, replacement garage, and ground works associated with proposed in-ground swimming pool

    Decided 18 Dec 2025 Lawful development
  • 24/01644/CLUE Refused

    2 Brook End, North Crawley, Newport Pagnell, MK16 9HH

    Certificate of Lawfulness for confirmation of existing use of land as domestic curtilage land for a dwellinghouse (use Class C3) for a period in excess of ten years

    Decided 13 Dec 2024 Lawful development

Timeline

Dates from the published record

  1. 14 Nov 2025

    Received by Milton Keynes

  2. 8 Jan 2026

    Decision issued: Approved

  3. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Milton Keynes granted permission on 8 January 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 2 BROOK END, NORTH CRAWLEY, NEWPORT PAGNELL, MK16 9HH

    PLN/2025/2445 Submitted 14 Nov 2025 0m away

    Certificate of lawfulness for proposed site extensions, front porch, replacement garage, and ground works associated with proposed in-ground swimming pool

    Granted Lawful development Extension 12 docs
    Small domestic
  • 2 BROOK END, NORTH CRAWLEY, NEWPORT PAGNELL, MK16 9HH

    PLN/2026/0839 Submitted 23 Apr 2026 0m away

    92% historically approved · decision due ~7 Jul

    Demolition of an existing single storey rear extension and detached outbuilding and the erection of a porch, two-storey side, single storey rear and first floor extensions with roof lights.

    Awaiting decision Householder Extension Loft or dormer +1 14 docs
    Small domestic
  • Goodmans Field Brook End North Crawley

    20/01042/FUL Submitted 30 Apr 2020 98m away

    Erection of a 5.4 x 3.6 m barn with a canopy for the storage of fleece and for the preparation of fleece

    Granted Full applications 14 docs
  • Land Adj To 10 Brook End North Crawley Milton Keynes

    19/02813/FUL Submitted 25 Oct 2019 113m away

    Erection of four dwelling houses and change of use to residential

    Withdrawn Full applications 23 docs
    Several homes
  • 2 Brook End, North Crawley, Newport Pagnell, MK16 9HH

    24/01644/CLUE Submitted 29 Jul 2024 221m away

    Certificate of Lawfulness for confirmation of existing use of land as domestic curtilage land for a dwellinghouse (use Class C3) for a period in excess of ten years

    Refused Lawful development 7 docs
    Domestic
  • Rectory Farm Brook End North Crawley Newport Pagnell MK16 9HH

    19/02360/FUL Submitted 16 Sep 2019 467m away

    To re-condition and convert a disused agricultural barn for the use of a children's day nursery.

    Granted Full applications 15 docs

In Milton Keynes

  • PLN/2026/1315 Granted

    BLETCHLEY LEISURE CENTRE, PRINCES WAY, BLETCHLEY, MILTON KEYNES, MK2 2HQ

    Prior notification for the installation of 254 roof-mounted photovoltaic (PV) solar panels (154.9kWp total installed capacity) on the north and south-facing pitched roof slopes of the existing leisure centre building, including associated mounting equipment, cabling, electrical infrastructure, and all ancillary works

    19 Jun 2026 Prior approval
  • PLN/2026/1215 Granted

    AFL Telecommunications Uk Ltd, Davy Avenue , Knowlhill , Milton Keynes, MK5 8ND

    Prior notification for the installation of a 336.3kWp solar PV system with 708 panels split on two roofs. Will be on a pitched standing seam mounting roof system.

    8 Jun 2026 Prior approval
  • PLN/2026/1740 Awaiting decision

    Nimbus House, Maidstone Road, Kingston, Milton Keynes, MK10 0BD

    Prior Approval for the proposed installation of a Solar Photovoltaic (PV) system mounted on the existing metal trapezoidal sheet roof of the building

    18 Aug 2026 Prior approval
  • PLN/2026/1430 Refused

    66 BRADWELL ROAD, LOUGHTON, MILTON KEYNES, MK5 8AL

    Prior Approval of single storey rear extension, with eaves of 2.5 metres and maximum height of 2.5 metres, and extending 6.0 metres from the original rear wall of the dwellinghouse

    6 Jul 2026 Prior approval
  • PLN/2026/1314 Granted

    WOUGHTON CENTRE, RAINBOW DRIVE, LEADENHALL, MILTON KEYNES, MK6 5EJ

    Prior notification for the proposed installation of a 97.6kWp roof-mounted solar photovoltaic (PV) array on the south-facing roof of the Leisure Centre, together with associated battery energy storage equipment (102kW capacity), inverters, mounting systems, control equipment, cable routes, and ancillary works including external plant installation, temporary construction compound, access arrangements, and associated infrastructure

    19 Jun 2026 Prior approval