Skip to content
PlanIndex Get alerts
Menu

Planning application

Mk East Development, London Road, Newport Pagnell

Granted Milton Keynes 24/01869/DISCON Approval of details reserved by a condition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Approval of details required by condition 40 (Arboricultural Method Statement) of permission ref. 21/00999/OUTEIS

As published by the council, reference 24/01869/DISCON

Application record

Reference
24/01869/DISCON
Type
Approval of details reserved by a condition
Status
Decision Made
Decision
Approved
Received
23 Aug 2024
Validated
23 Aug 2024
Decided
23 Dec 2024
Ward
Olney (Historic 2026)
Parish
Moulsoe
Decision by
Delegated Decision

Site history

Applications at this address on the Milton Keynes register

This site has had 13 applications since 2022: 8 approved, 0 refused.

  • PLN/2025/2429 Granted

    Mk East Development, London Road, Newport Pagnell

    Approval of details required by condition 11 (Self-Build Housing) of permission ref. 21/00999/OUTEIS

    Decided 18 Dec 2025 Conditions
  • PLN/2025/2384 Granted

    Mk East Development, London Road, Newport Pagnell

    Approval of details required by condition 6 (Detailed Design Code) of permission ref. 21/00999/OUTEIS (part-discharge)

    Decided 15 Jan 2026 Conditions
  • PLN/2025/2157 Granted

    MK East Development, London Road, Newport Pagnell

    Approval of reserved matters for the access, appearance, landscaping, layout, and scale pursuant to outline planning permission ref. PLN/2024/2745 for the erection of a foul pumping station 1 and associated works. EIA development

    Decided 22 Jan 2026 Reserved matters
  • PLN/2025/1768 Granted

    Mk East Development, London Road, Newport Pagnell

    Approval of details required by conditions 5 (Crossing details) & 10 (Lighting assessment) of permission ref. 23/02774/REM

    Decided 15 Oct 2025 Conditions
  • 24/02019/DISCON Granted

    Mk East Development, London Road, Newport Pagnell

    Approval of details required by condition 3 (access works) of permission ref. 24/01502/REM

    Decided 22 Nov 2024 Conditions
  • 24/01563/DISCON Granted

    Mk East Development, London Road, Newport Pagnell

    Approval of details required by conditions 22 (Highways infrastructure) and 59 (Surface water drainage scheme) of permission ref. 21/00999/OUTEIS

    Decided 20 Nov 2024 Conditions
  • 24/01467/DISCON Granted

    Mk East Development, London Road, Newport Pagnell

    Approval of details required by conditions 50 (landscaping scheme in relation to highways infrastructure) and 55 (Landscape Management and Maintenance Plan (LMMP) for the highway infrastructure corridors) of permission ref. 21/00999/OUTEIS

    Decided 13 Dec 2024 Conditions
  • 23/00516/DISCON Decided

    Mk East Development London Road Newport Pagnell

    Approval of details required by condition 5 (Site Wide Design Code) of permission ref. 21/00999/OUTEIS

    Decided 13 Jul 2023 Conditions
  • 23/00199/DISCON Decided

    Mk East Development London Road Newport Pagnell

    Approval of details required by condition 22 (highways infrastructure) of permission ref. 21/00999/OUTEIS

    Decided 15 Jun 2023 Conditions
  • 23/00220/DISCON Decided

    Mk East Development London Road Newport Pagnell

    Approval of details required by conditions 29 (Reuse of soils and extracted material) and 40 (Arboricultural Method Statement) of permission ref. 21/00999/OUTEIS

    Decided 23 Mar 2023 Conditions

Timeline

Dates from the published record

  1. 23 Aug 2024

    Received by Milton Keynes

  2. 23 Dec 2024

    Decision issued: Approved

  3. 4 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Milton Keynes granted permission on 23 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Mk East Development London Road Newport Pagnell

    22/02608/DISCON Submitted 17 Oct 2022 0m away

    Approval of details required by condition 59 (Surface water drainage scheme) of permission ref. 21/00999/OUTEIS

    Decided Conditions 196 docs
  • Mk East Development London Road Newport Pagnell

    22/02385/DISCON Submitted 21 Sep 2022 0m away

    Approval of details required by condition 9 (Site-Wide Phasing Plan) of permission ref. 21/00999/OUTEIS.

    Decided Conditions 14 docs
  • Mk East Development London Road Newport Pagnell

    23/00199/DISCON Submitted 27 Jan 2023 0m away

    Approval of details required by condition 22 (highways infrastructure) of permission ref. 21/00999/OUTEIS

    Decided Conditions 505 docs
  • Mk East Development London Road Newport Pagnell

    23/00220/DISCON Submitted 27 Jan 2023 0m away

    Approval of details required by conditions 29 (Reuse of soils and extracted material) and 40 (Arboricultural Method Statement) of permission ref. 21/00999/OUTEIS

    Decided Conditions 10 docs
  • Mk East Development, London Road, Newport Pagnell

    24/01467/DISCON Submitted 3 Jul 2024 0m away

    Approval of details required by conditions 50 (landscaping scheme in relation to highways infrastructure) and 55 (Landscape Management and Maintenance Plan (LMMP) for the highway infrastructure corridors) of permission ref. 21/00999/OUTEIS

    Granted Conditions 111 docs
  • Mk East Development, London Road, Newport Pagnell

    24/01563/DISCON Submitted 15 Jul 2024 0m away

    Approval of details required by conditions 22 (Highways infrastructure) and 59 (Surface water drainage scheme) of permission ref. 21/00999/OUTEIS

    Granted Conditions 868 docs

In Milton Keynes

  • PLN/2026/1410 Granted

    Land North of Woburn Sands Garden Centre, Newport Road, Wavendon, Milton Keynes MK17 8UF

    Part approval of details required by condition 4 (replacement trees) of permission ref. PLN/2025/2687

    30 Jun 2026 Conditions
  • PLN/2026/1403 Granted

    1 Brick Close, Kiln Farm, Milton Keynes, MK11 3EJ

    Approval of details required by condition BNG1 (Biodiversity Net Gain) of permission ref. PLN/2025/2648

    3 Jul 2026 Conditions
  • PLN/2026/1418 Granted

    BANK HOUSE, 171 MIDSUMMER BOULEVARD, CENTRAL MILTON KEYNES, MILTON KEYNES, MK9 1EB

    Approval of details required by condition 7 (Surface Water Drainage Scheme) of permission ref. PLN/2025/0969

    3 Jul 2026 Conditions
  • PLN/2026/1408 Granted

    MICHAELS AKYRE, STERLING CLOSE, PENNYLAND, MILTON KEYNES, MK15 8AN

    Approval of details required by condition 10 (Hard and Soft Landscaping) and condition 12 (Biodiversity Enhancement Scheme (BES) and Management Plan) of permission ref. 22/01422/FULM

    3 Jul 2026 Conditions
  • PLN/2026/1318 Granted

    37 CHURCH ROAD, BOW BRICKHILL, MILTON KEYNES, MK17 9LH

    Approval of details required by condition 3 (materials) of permission ref. PLN/2026/0719

    22 Jun 2026 Conditions