Planning application

Land At Woodlands Business Park, Breckland, Linford Wood, Milton Keynes

Granted Milton Keynes 23/02449/FUL Full planning permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of two employment units for Class E(g)(iii), B2 and B8 with associated access, car parking, landscaping and drainage

As published by the council, reference 23/02449/FUL

Application record

Reference
23/02449/FUL
Type
Full planning permission
Status
Decision Made
Decision
Approved with Conditions
Received
1 Nov 2023
Validated
10 Nov 2023
Decided
17 Dec 2024
Ward
Stantonbury (Historic 2026)
Parish
Stantonbury
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 1 Nov 2023

    Received by Milton Keynes

  2. 10 Nov 2023

    Validated

    Checked as complete and ready for consideration.

  3. 17 Dec 2024

    Decision issued: Approved with Conditions

  4. 25 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

205 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Plot C Breckland Linford Wood Milton Keynes

    22/02935/FUL Submitted 25 Nov 2022 31m away

    Development of a single building for B8 storage and distribution uses with ancillary offices, provision of car parking, cycle storage, service yard, fencing and associated landscape planting and earthworks.

    Withdrawn Full applications 111 docs
  • Land At The Corner of Monks Way Breckland Linford Wood Milton Keynes

    20/01143/NMA Submitted 1 May 2020 111m away

    Non material amendment to application 19/02295/FUL for the inclusion of staff door to McDonald's north east elevation, inclusion of McDonald's corral, minor relocation of McDonald's accessible parking spaces, re-configuration of the patio, inclusion of playframe, customer order display and goal post specifications

    Granted Amendments 10 docs
  • Land At The Corner of Monks Way Breckland Linford Wood Milton Keynes

    20/00716/ADV Submitted 16 Mar 2020 120m away

    Advertisement consent for the installation of an internally illuminated totem sign

    Granted Advertising 6 docs
  • Land At The Corner of Monks Way Breckland Linford Wood Milton Keynes

    20/01256/DISCON Submitted 1 Jun 2020 127m away

    Details submitted pursuant to discharge Conditions 3 (Delivery Partner), 4 (Finished Floor Levels) , 5 (Biodiversity Enhancement), 6 (CEMP), 7 (Estate Roads), 8 (Drainage), 9 (Protected Species) 14 (Landscaping) attached to planning application 19/02295/FUL

    Split decision Conditions 22 docs
  • Land At The Corner of Monks Way Breckland Linford Wood Milton Keynes

    19/02295/FUL Submitted 10 Sep 2019 127m away

    Redevelopment of existing car park to provide a coffee shop with drive through facility (Costa Coffee) and a restaurant/takeaway with drive through facility (McDonalds), together with 73 car parking spaces and landscaping.

    Granted Full applications 55 docs
  • Land At The Corner of Monks Way Breckland Linford Wood Milton Keynes

    20/00610/ADV Submitted 5 Mar 2020 127m away

    Advertisement consent for installation of 7 internally illuminated fascia signs and 1 digital reconnect screen

    Granted Advertising 11 docs

In Milton Keynes

  • PLN/2025/2661 Refused

    117 QUEENSWAY, BLETCHLEY, MILTON KEYNES, MK2 2DH

    Change of use to include Sui Generis laundromat, installation of laundry equipment and external alterations

    15 Dec 2025 Full applications
  • PLN/2026/1401 Granted

    BRITISH TELECOM, SILVER STREET, NEWPORT PAGNELL, MK16 0EJ

    Installation of ventilation louvres within existing ground floor windows to the north elevation

    2 Jul 2026 Full applications
  • PLN/2026/1150 Withdrawn

    Calverton Cottage, Calverton, Milton Keynes, MK19 6ED

    New building with hardstanding in adjacent field to include two stables, workshop and tractor storage including new gated ramped pathway, new hardstanding for vehicles with access, proposed landscaping/biodiversity enhancements, increase in land levels, alterations to the gate and walls of the existing vehicle access

    1 Jun 2026 Full applications
  • PLN/2026/0575 Refused

    George House, Crosslands, Stantonbury, Milton Keynes, MK14 6DB

    Use of land to extend existing site for temporary housing of homeless persons including replacement office building (Use Class E(g)(i)) and erection of ancillary shed

    17 Mar 2026 Full applications
  • PLN/2026/0959 Granted

    11-16 Juniper Gardens, Walnut Tree, Milton Keynes MK7 7LZ

    Replacement windows to all elevations and floors

    11 May 2026 Full applications