Planning application
Proposed Telecommunications Mast Childs Way V8 To Overgate Milton Keynes
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Prior approval for 15m high slim-line monopole, supporting 6 no. antennas, 3 no. equipment cabinets and ancillary development.
As published by the council, reference 23/00705/PRIOR
Application record
- Reference
- 23/00705/PRIOR
- Type
- Prior Notification/Approval
- Status
- Decision Made
- Decision
- Approved
- Received
- 22 Mar 2023
- Validated
- 22 Mar 2023
- Decided
- 6 Jun 2023
- Ward
- Campbell Park & Old Woughton (Historic 2026)
- Parish
- Campbell Park
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
22 Mar 2023
Received by Milton Keynes
-
6 Jun 2023
Decision issued: Approved
-
1 Sep 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
PLN/2025/2062 Refused
Childs Way, V8 To Overgate, Springfield, Milton Keynes
Non-material amendment seeking to alter the siting of the equipment and vehicle restraint system (relating to permission ref. 23/00705/PRIOR for Prior approval for 15m high slim-line monopole, supporting 6 no. antennas, 3 no. equipment cabinets and ancillary development)
Documents
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Milton Keynes granted permission on 6 June 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Other prior approval applications
In Milton Keynes
-
PLN/2026/1315 Granted
BLETCHLEY LEISURE CENTRE, PRINCES WAY, BLETCHLEY, MILTON KEYNES, MK2 2HQ
Prior notification for the installation of 254 roof-mounted photovoltaic (PV) solar panels (154.9kWp total installed capacity) on the north and south-facing pitched roof slopes of the existing leisure centre building, including associated mounting equipment, cabling, electrical infrastructure, and all ancillary works
-
PLN/2026/1215 Granted
AFL Telecommunications Uk Ltd, Davy Avenue , Knowlhill , Milton Keynes, MK5 8ND
Prior notification for the installation of a 336.3kWp solar PV system with 708 panels split on two roofs. Will be on a pitched standing seam mounting roof system.
-
PLN/2026/1740 Awaiting decision
Nimbus House, Maidstone Road, Kingston, Milton Keynes, MK10 0BD
Prior Approval for the proposed installation of a Solar Photovoltaic (PV) system mounted on the existing metal trapezoidal sheet roof of the building
-
PLN/2026/1430 Refused
66 BRADWELL ROAD, LOUGHTON, MILTON KEYNES, MK5 8AL
Prior Approval of single storey rear extension, with eaves of 2.5 metres and maximum height of 2.5 metres, and extending 6.0 metres from the original rear wall of the dwellinghouse
-
PLN/2026/1314 Granted
WOUGHTON CENTRE, RAINBOW DRIVE, LEADENHALL, MILTON KEYNES, MK6 5EJ
Prior notification for the proposed installation of a 97.6kWp roof-mounted solar photovoltaic (PV) array on the south-facing roof of the Leisure Centre, together with associated battery energy storage equipment (102kW capacity), inverters, mounting systems, control equipment, cable routes, and ancillary works including external plant installation, temporary construction compound, access arrangements, and associated infrastructure