Planning application
Land At Saxon Court, Avebury Boulevard, Central Milton Keynes, Milton Keynes, MK9 3HS
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Non-material amendment seeking the relocation of the cycle parking to the front of the Shed to improve the appearance of the streetscene, changes to Saxon Court building; movement of long stay cycle storage to the internal ground floor, relocation of toilet and shower facilities, relocation of the ground floor plantroom, landings added to Courtyard walkways and stairs on levels 1- 5, extended/ revised layout of Level 6 roof top plant, alterations to ground level signage, sawtooth roof access ladder added to west side and sawtooth roof PVs adjusted; and changes to The Village; relocation of podium western external stair encased in perforated metal panels, lowering height of level 2 glass screen and inclusion of wind mitigation canopies and vertical bars, removal of ground level canopies on the northern side, revised signage, podium Level 1 amenity space amended to an internal area with double doors and balustrade, podium fa�ade rhythms revised to all elevations, roof extended over Sky Garden external stairs, ground level podium internal layout revised with residential entrance to the northern side and consolidated cycle store, level 2 corner apartment living spaces squared, roof top pergola raised by 1.525m, roof plant relocated within the building and PVs added to the roof, blue roof relocated from Level 33 to podium roof and building raised by 450mm to increase internal height of ground level and level 1 (relating to permission ref. 21/02246/FULEIS for Erection of two blocks (Block A up to 34-storeys, and Block B up to 3-storeys) to the rear of Saxon Court and the refurbishment and upward extension (up to 3-storeys) to Saxon Court, to provide up to 288 residential units (built to rent and discount market rent), office employment, co-working & flexible workshop space, restaurant, caf�, retail and leisure space (all Use Class E), community space (Use Class F2), central public open space and associated infrastructure including hard and soft landscaping)
As published by the council, reference 23/00368/NMA
Application record
- Reference
- 23/00368/NMA
- Type
- Non Material Amendments
- Status
- Decision Made
- Decision
- Application permitted
- Received
- 13 Feb 2023
- Validated
- 13 Feb 2023
- Decided
- 28 Apr 2023
- Ward
- Central Milton Keynes (Historic 2026)
- Parish
- Central Milton Keynes
- Decision by
- Delegated Decision
- Postcode
- MK9 3HS
Timeline
Dates from the published record
-
13 Feb 2023
Received by Milton Keynes
-
28 Apr 2023
Decision issued: Application permitted
-
1 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Cambridge
637 applications on PlanIndex · across 82 councils · 89% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
32 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About amendments applications
How this application type works
An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.
Nearby applications
Within 500 metres
-
Land At Saxon Court, 502 Avebury Boulevard, Central Milton Keynes, Milton Keynes, MK9 3HS
Approval of details required by conditions 11 (Hard and Soft Landscaping) and 12 (Street Furniture) of permission ref. 21/02246/FULEIS
Decided Conditions 17 docs -
Land At Saxon Court, 502 Avebury Boulevard, Central Milton Keynes, Milton Keynes, MK9 3HS
Approval of details required by conditions 3 (Construction Environmental Management Plan), 4 (Finished Floor Levels), 5 (Phasing Plan), 6 (Arboricultural Method Statement),8 (Cycle Scheme), 13 (Surface Water Drainage Scheme), 24 (Ground Conditions), 26 (Lifetime Homes and Guidance), 30 (Sustainable Drainage Strategy), 33 (Porte Cochere Details) and 34 (Saxon Court Features) of permission ref. 21/02246/FULEIS
Decided Conditions 54 docs -
574 Avebury Boulevard Central Milton Keynes Milton Keynes MK9 3DB
Conversion of garage to living accommodation
Granted Full applications 6 docs -
Next Home & Beauty Unit / Former Debenhams (Basement Level) 38 Midsummer Place Central Milton Keynes Milton Keynes MK9 3GA
Change of use of basement from retail (Use Class E) to a bowling alley and leisure/recreation use with associated bar and dining facilities.
Granted Full applications 15 docs -
599 Avebury Boulevard Central Milton Keynes Milton Keynes MK9 3HR
Temporary change of use of ground floor to D1
Granted Full applications 9 docs -
Westminster House, 500 Avebury Boulevard, Central Milton Keynes, Milton Keynes, MK9 2LA
The conversion and upward extension (three storeys) to 500 Avebury Boulevard to provide a total of 237 (Build to Rent) residential units (C3), including material alterations to the existing building to facilitate residential conversion and all associated infrastructure including hard and soft landscaping.
Granted Full applications Extension 111 docs
Other amendments applications
In Milton Keynes
-
PLN/2026/1280 Granted
4 FAR LAWRENCE, MOULSOE, MILTON KEYNES, MK16 0FF
Variation of condition 2 (approved plans) seeking to increase the depth of the proposed double storey rear extension and amend fenestrations (relating to permission ref. PLN/2026/0382 - Erection of rear dormer and a double storey rear extension and alterations to existing windows/doors)
-
PLN/2026/1807 Awaiting decision
Local Centre, Tattenhoe Park, Milton Keynes, Milton Keynes, MK6 1LY
Non-material amendment seeking the refinement of landscaping around the approved substation and minor revisions to the EV charging area layout (relating to permission ref. PLN/2024/2733 for the approval of reserved matters (access, layout, scale, appearance and landscaping) pursuant to outline permission ref. 17/00918/OUT for the erection of 4 units for a local centre. EIA development
-
PLN/2026/1545 Withdrawn
63 MOORES HILL, YARDLEY ROAD, OLNEY, MK46 5DY
Variation of condition 2 (approved plans) seeking changes to the approved porch and kitchen/utility space (relating to permission ref. PLN/2026/0722 for the proposed erection of single and two storey side extension, single storey rear extension and front porch)
-
PLN/2026/1793 Awaiting decision
33 PASTERN PLACE, DOWNS BARN, MILTON KEYNES, MK14 7RB
Non-material amendment seeking to alter approved doors and windows (relating to permission ref. 23/01292/HOU for Replace existing conservatory with single storey rear extension with roof lights and side and rear canopy, log burner flue and single storey front infill extension forming link to the existing garage. New windows and door to ground floor side elevation)
-
PLN/2026/1604 Refused
23 FOLLY LANE, NORTH CRAWLEY, NEWPORT PAGNELL, MK16 9LN
Non-material amendment seeking to amend the approved double garage doors with two glazed panels and a reduced porch (relating to permission ref. PLN/2025/2287 for the extension to existing double garage with a new roof configuration to the front elevation)