Skip to content
PlanIndex Get alerts
Menu

Planning application

Dansteed Way Brickhill Street H4 To H5 Milton Keynes

Granted Milton Keynes 22/03110/PRIOR Prior Notification/Approval

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Prior approval for the proposed installation of a 20m high slim-line monopole, supporting 6 no. antennas, 1 no. wraparound equipment cabinet at the base of the monopole, 2 no. equipment cabinets, 1 no. electric meter cabinet and ancillary development thereto including 1 no. GPS module

As published by the council, reference 22/03110/PRIOR

Application record

Reference
22/03110/PRIOR
Type
Prior Notification/Approval
Status
Decision Made
Decision
Approved
Received
16 Dec 2022
Validated
16 Dec 2022
Decided
8 Feb 2023
Ward
Broughton (Historic 2026)
Parish
Campbell Park
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 16 Dec 2022

    Received by Milton Keynes

  2. 8 Feb 2023

    Decision issued: Approved

  3. 1 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a telecoms contractor registered in Leeds

324 applications on PlanIndex · across 97 councils · 84% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Milton Keynes granted permission on 8 February 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Milton Keynes

  • PLN/2026/1315 Granted

    BLETCHLEY LEISURE CENTRE, PRINCES WAY, BLETCHLEY, MILTON KEYNES, MK2 2HQ

    Prior notification for the installation of 254 roof-mounted photovoltaic (PV) solar panels (154.9kWp total installed capacity) on the north and south-facing pitched roof slopes of the existing leisure centre building, including associated mounting equipment, cabling, electrical infrastructure, and all ancillary works

    19 Jun 2026 Prior approval
  • PLN/2026/1215 Granted

    AFL Telecommunications Uk Ltd, Davy Avenue , Knowlhill , Milton Keynes, MK5 8ND

    Prior notification for the installation of a 336.3kWp solar PV system with 708 panels split on two roofs. Will be on a pitched standing seam mounting roof system.

    8 Jun 2026 Prior approval
  • PLN/2026/1740 Awaiting decision

    Nimbus House, Maidstone Road, Kingston, Milton Keynes, MK10 0BD

    Prior Approval for the proposed installation of a Solar Photovoltaic (PV) system mounted on the existing metal trapezoidal sheet roof of the building

    18 Aug 2026 Prior approval
  • PLN/2026/1430 Refused

    66 BRADWELL ROAD, LOUGHTON, MILTON KEYNES, MK5 8AL

    Prior Approval of single storey rear extension, with eaves of 2.5 metres and maximum height of 2.5 metres, and extending 6.0 metres from the original rear wall of the dwellinghouse

    6 Jul 2026 Prior approval
  • PLN/2026/1314 Granted

    WOUGHTON CENTRE, RAINBOW DRIVE, LEADENHALL, MILTON KEYNES, MK6 5EJ

    Prior notification for the proposed installation of a 97.6kWp roof-mounted solar photovoltaic (PV) array on the south-facing roof of the Leisure Centre, together with associated battery energy storage equipment (102kW capacity), inverters, mounting systems, control equipment, cable routes, and ancillary works including external plant installation, temporary construction compound, access arrangements, and associated infrastructure

    19 Jun 2026 Prior approval