Skip to content
PlanIndex Get alerts
Menu

Planning application

7 Butterton Gardens Broughton Milton Keynes MK10 7BU

Granted Milton Keynes 22/00710/FUL Full planning permission

Works: Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed rear dormer window with anthracite grey Hardie plank cladding

As published by the council, reference 22/00710/FUL

Application record

Reference
22/00710/FUL
Type
Full planning permission
Status
Decision Made
Decision
Application permitted
Received
22 Mar 2022
Validated
25 Mar 2022
Decided
30 May 2022
Ward
Broughton (Historic 2026)
Parish
Broughton and Milton Keynes (Historic 2026)
Decision by
Delegated Decision
Postcode
MK10 7BU

Timeline

Dates from the published record

  1. 22 Mar 2022

    Received by Milton Keynes

  2. 25 Mar 2022

    Validated

    Checked as complete and ready for consideration.

  3. 30 May 2022

    Decision issued: Application permitted

  4. 1 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 7 Blythebridge Broughton Milton Keynes MK10 7AY

    20/01191/PNHSE Submitted 19 May 2020 115m away

    Prior notification of single storey rear extension, 6m length, with orangery-style rooflight

    Decided Prior approval Extension Loft or dormer 7 docs
    Small domestic
  • 125 Warwick Avenue Broughton Milton Keynes MK10 7BY

    23/00567/HOU Submitted 9 Mar 2023 129m away

    The erection of a single storey side extension with roof light. Front porch extension. Two storey rear extension with hipped roof over. New roof lights to front and rear of main roof and associated fenestration alterations (revised proposal following the refusal of application ref. 22/02549/HOU)

    Granted Householder Extension Loft or dormer +2 7 docs
    Small domestic
  • 15 Harmans Cross Broughton Milton Keynes MK10 7BN

    19/02747/FUL Submitted 21 Oct 2019 141m away

    Proposed single storey rear extension and garden wall

    Granted Full applications Extension 11 docs
    Small domestic
  • 164 Dalegarth Way Broughton Milton Keynes MK10 7BR

    20/00766/CLUP Submitted 23 Mar 2020 147m away

    Certificate of lawfulness for the proposed loft conversion with front and rear rooflights.

    Granted Lawful development Loft or dormer 4 docs
  • 17 Harmans Cross Broughton Milton Keynes MK10 7BN

    20/00842/CLUP Submitted 2 Apr 2020 151m away

    Certificate of lawfulness for the proposed loft conversion with dormer extension to side roofslope and rooflights to two side roofslopes

    Granted Lawful development Extension Loft or dormer 6 docs
  • 2 BROMLEY GROVE, BROUGHTON, MILTON KEYNES, MK10 7EY

    PLN/2025/2527 Submitted 26 Nov 2025 175m away

    Certificate of lawfulness for the proposed loft conversion with rear dormer & front rooflights

    Granted Lawful development Loft or dormer 4 docs

In Milton Keynes

  • PLN/2025/2661 Refused

    117 QUEENSWAY, BLETCHLEY, MILTON KEYNES, MK2 2DH

    Change of use to include Sui Generis laundromat, installation of laundry equipment and external alterations

    15 Dec 2025 Full applications
  • PLN/2026/1401 Granted

    BRITISH TELECOM, SILVER STREET, NEWPORT PAGNELL, MK16 0EJ

    Installation of ventilation louvres within existing ground floor windows to the north elevation

    2 Jul 2026 Full applications
  • PLN/2026/1150 Withdrawn

    Calverton Cottage, Calverton, Milton Keynes, MK19 6ED

    New building with hardstanding in adjacent field to include two stables, workshop and tractor storage including new gated ramped pathway, new hardstanding for vehicles with access, proposed landscaping/biodiversity enhancements, increase in land levels, alterations to the gate and walls of the existing vehicle access

    1 Jun 2026 Full applications
  • PLN/2026/0575 Refused

    George House, Crosslands, Stantonbury, Milton Keynes, MK14 6DB

    Use of land to extend existing site for temporary housing of homeless persons including replacement office building (Use Class E(g)(i)) and erection of ancillary shed

    17 Mar 2026 Full applications
  • PLN/2026/0959 Granted

    11-16 Juniper Gardens, Walnut Tree, Milton Keynes MK7 7LZ

    Replacement windows to all elevations and floors

    11 May 2026 Full applications