Planning application
Snakes Meadow Newport Pagnell Road Astwood
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Full application for the installation, operation and subsequent decommissioning of a renewable energy scheme comprising ground mounted photovoltaic solar arrays, associated infrastructure, security fencing and measures and access improvements including landscaping and biodiversity measures and permissive footpath.
As published by the council, reference 21/02760/FUL
Application record
- Reference
- 21/02760/FUL
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- Application permitted
- Received
- 8 Sep 2021
- Validated
- 8 Sep 2021
- Decided
- 15 May 2024
- Ward
- Olney (Historic 2026)
- Parish
- Astwood & Hardmead
- Decision by
- Delegated Decision
Site history
Applications at this address on the Milton Keynes register
This site has had 6 applications since 2021: 4 approved, 0 refused.
-
PLN/2026/1804 Awaiting decision
Snakes Meadow, Newport Pagnell Road, Astwood
Approval of details required by condition 6 (Landscape mitigation scheme), condition 7 (Landscape Management and Maintenance Plan), condition 10 (Proposed building details), condition 11 (Landscape and Ecological Management Plan (LEMP)), and condition 12 (Construction and Ecological Management Plan (CEMP)) of permission ref. 21/02760/FUL
-
PLN/2026/0706 Split decision
Snakes Meadow, Newport Pagnell Road, Astwood
Approval of details required by condition 9 [Partial] (Written Scheme of Investigation) and condition 10 (Proposed building details) of permission ref. 21/02760/FUL
-
PLN/2026/0565 Granted
Snakes Meadow, Newport Pagnell Road, Astwood
Non-material amendment seeking amendments to the proposed landscaping (relating to permission ref. 21/02760/FUL for Full application for the installation, operation and subsequent decommissioning of a renewable energy scheme comprising ground mounted photovoltaic solar arrays, associated infrastructure, security fencing and measures and access improvements including landscaping and biodiversity measures and permissive footpath)
-
PLN/2026/0360 Granted
Snakes Meadow, Newport Pagnell Road, Astwood
Approval of details required by condition 4 (Construction Traffic Management Plan (CTMP)) of permission ref. 21/02760/FUL
-
PLN/2026/0171 Granted
Snakes Meadow, Newport Pagnell Road, Astwood
Non-material amendment seeking adjustments to the fencing layout and revisions to the access track layout (relating to permission ref. 21/02760/FUL for the installation, operation and subsequent decommissioning of a renewable energy scheme comprising ground mounted photovoltaic solar arrays, associated infrastructure, security fencing and measures and access improvements including landscaping and biodiversity measures and permissive footpath.)
Timeline
Dates from the published record
-
8 Sep 2021
Received by Milton Keynes
-
15 May 2024
Decision issued: Application permitted
-
1 Sep 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
6 later applications on the register refer to this one:
-
PLN/2026/1804 Awaiting decision
Snakes Meadow, Newport Pagnell Road, Astwood
Approval of details required by condition 6 (Landscape mitigation scheme), condition 7 (Landscape Management and Maintenance Plan), condition 10 (Proposed building details), condition 11 (Landscape and Ecological Management Plan (LEMP)), and condition 12 (Construction and Ecological Management Plan (CEMP)) of permission ref. 21/02760/FUL
-
PLN/2026/0706 Split decision
Snakes Meadow, Newport Pagnell Road, Astwood
Approval of details required by condition 9 [Partial] (Written Scheme of Investigation) and condition 10 (Proposed building details) of permission ref. 21/02760/FUL
-
PLN/2026/0565 Granted
Snakes Meadow, Newport Pagnell Road, Astwood
Non-material amendment seeking amendments to the proposed landscaping (relating to permission ref. 21/02760/FUL for Full application for the installation, operation and subsequent decommissioning of a renewable energy scheme comprising ground mounted photovoltaic solar arrays, associated infrastructure, security fencing and measures and access improvements including landscaping and biodiversity measures and permissive footpath)
-
PLN/2026/0566 Split decision
Snakes Meadow, West End, MK43 8SX
Approval of details required by conditions 5 (Overland Flow Scheme), 6 (Landscape Mitigation Scheme), 7 (Landscape Management & Maintenance Plan), 8 (Arboricultural Method Statement), 11 (Landscape and Ecological Management Plan), 12 (Construction and Ecological Management Plan) and 13 (Non-Licensed Method Statement for Great Crested Newts) of permission ref. 21/02760/FUL
-
PLN/2026/0360 Granted
Snakes Meadow, Newport Pagnell Road, Astwood
Approval of details required by condition 4 (Construction Traffic Management Plan (CTMP)) of permission ref. 21/02760/FUL
-
PLN/2026/0171 Granted
Snakes Meadow, Newport Pagnell Road, Astwood
Non-material amendment seeking adjustments to the fencing layout and revisions to the access track layout (relating to permission ref. 21/02760/FUL for the installation, operation and subsequent decommissioning of a renewable energy scheme comprising ground mounted photovoltaic solar arrays, associated infrastructure, security fencing and measures and access improvements including landscaping and biodiversity measures and permissive footpath.)
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in Cirencester
567 applications on PlanIndex · across 135 councils · 91% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
93 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Milton Keynes granted permission on 15 May 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Milton Keynes
-
PLN/2025/2661 Refused
117 QUEENSWAY, BLETCHLEY, MILTON KEYNES, MK2 2DH
Change of use to include Sui Generis laundromat, installation of laundry equipment and external alterations
-
PLN/2026/1401 Granted
BRITISH TELECOM, SILVER STREET, NEWPORT PAGNELL, MK16 0EJ
Installation of ventilation louvres within existing ground floor windows to the north elevation
-
PLN/2026/1150 Withdrawn
Calverton Cottage, Calverton, Milton Keynes, MK19 6ED
New building with hardstanding in adjacent field to include two stables, workshop and tractor storage including new gated ramped pathway, new hardstanding for vehicles with access, proposed landscaping/biodiversity enhancements, increase in land levels, alterations to the gate and walls of the existing vehicle access
-
PLN/2026/0575 Refused
George House, Crosslands, Stantonbury, Milton Keynes, MK14 6DB
Use of land to extend existing site for temporary housing of homeless persons including replacement office building (Use Class E(g)(i)) and erection of ancillary shed
-
PLN/2026/0959 Granted
11-16 Juniper Gardens, Walnut Tree, Milton Keynes MK7 7LZ
Replacement windows to all elevations and floors