Planning application
16 Esk Way Bletchley Milton Keynes MK3 7PW
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Removal of existing timber built porch and partial removal of brick boundary wall, to create a new single storey brick and block built porch with side return extension. Materials to match existing.
As published by the council, reference 20/01787/FUL
Application record
- Reference
- 20/01787/FUL
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- Application permitted
- Received
- 24 Jul 2020
- Validated
- 24 Jul 2020
- Decided
- 17 Sep 2020
- Ward
- Bletchley West (Historic 2026)
- Parish
- West Bletchley
- Decision by
- Delegated Decision
- Postcode
- MK3 7PW
Timeline
Dates from the published record
-
24 Jul 2020
Received by Milton Keynes
-
17 Sep 2020
Decision issued: Application permitted
-
1 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
11 Severn Way Bletchley Milton Keynes MK3 7PZ
The erection of a single storey rear extension
Granted Householder Extension 5 docsSmall domestic -
162 Severn Way Bletchley Milton Keynes MK3 7QB
Erection of a detached garage and a dropped kerb to create driveway
Granted Householder 13 docsSmall domestic -
162 Severn Way, Bletchley, Milton Keynes, MK3 7QB
Certificate of lawfulness for the proposed use of the property as supported accommodation for up to four young people placed under Section 20 of the Children Act 1989, without the provision of personal care, continues to fall within Use Class C3 and does not constitute a material change of use
Refused Lawful development 4 docs -
34 Tyne Square Bletchley Milton Keynes MK3 7QA
Proposed two storey side and rear extension
Granted Full applications Extension 8 docs -
6 Wye Close Bletchley Milton Keynes MK3 7PJ
Loft conversion (with dormer).
Granted Full applications Loft or dormer 6 docs -
4 Pulborough Close Bletchley Milton Keynes MK3 7TU
The erection of a two storey front extension
Refused Householder Extension 7 docsDomestic
Other full applications applications
In Milton Keynes
-
PLN/2025/2661 Refused
117 QUEENSWAY, BLETCHLEY, MILTON KEYNES, MK2 2DH
Change of use to include Sui Generis laundromat, installation of laundry equipment and external alterations
-
PLN/2026/1401 Granted
BRITISH TELECOM, SILVER STREET, NEWPORT PAGNELL, MK16 0EJ
Installation of ventilation louvres within existing ground floor windows to the north elevation
-
PLN/2026/1150 Withdrawn
Calverton Cottage, Calverton, Milton Keynes, MK19 6ED
New building with hardstanding in adjacent field to include two stables, workshop and tractor storage including new gated ramped pathway, new hardstanding for vehicles with access, proposed landscaping/biodiversity enhancements, increase in land levels, alterations to the gate and walls of the existing vehicle access
-
PLN/2026/0575 Refused
George House, Crosslands, Stantonbury, Milton Keynes, MK14 6DB
Use of land to extend existing site for temporary housing of homeless persons including replacement office building (Use Class E(g)(i)) and erection of ancillary shed
-
PLN/2026/0959 Granted
11-16 Juniper Gardens, Walnut Tree, Milton Keynes MK7 7LZ
Replacement windows to all elevations and floors