Skip to content
PlanIndex Get alerts
Menu

Planning application

18 - 20 Burners Lane Kiln Farm Milton Keynes MK11 3HB

Granted Milton Keynes 20/01414/FUL Full planning permission

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Additional internal extension

As published by the council, reference 20/01414/FUL

Application record

Reference
20/01414/FUL
Type
Full planning permission
Status
Decision Made
Decision
Application permitted
Received
16 Jun 2020
Validated
16 Jun 2020
Decided
11 Aug 2020
Ward
Bradwell (Historic 2026)
Parish
Bradwell Abbey (Historic)
Decision by
Delegated Decision
Postcode
MK11 3HB

Timeline

Dates from the published record

  1. 16 Jun 2020

    Received by Milton Keynes

  2. 11 Aug 2020

    Decision issued: Application permitted

  3. 1 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • KILN FARM, BRUNLEYS ROAD, WOLVERTON, MILTON KEYNES, MK11 3EP

    PLN/2024/2653 Submitted 2 Dec 2024 164m away

    28 day notification for the proposed installation of 3No. antennas, 6No. RRU's and 3No. BOBs at high level, proposed 1No. cabinet and 3No. BOBs at ground level with ancillary development thereto

    Decided Telecoms 2 docs
  • BRUNLEYS, KILN FARM, MILTON KEYNES, MK11 3EP

    PLN/2026/0075 Submitted 12 Jan 2026 164m away

    28 day notice of intention to remove 3 existing and install 6 new antennas, install 6 Remote Radio Units (RRUs), 4 dishes and 3 cabinets within the existing compound together with all ancillary development thereto

    Decided Telecoms 3 docs
  • Telecommunication Mast D F Crash Repairs Ltd Brunleys Kiln Farm Milton Keynes

    20/01055/NOTTEL Submitted 28 Apr 2020 185m away

    Notification of proposed removal of 6no existing antennae and replace with 12no new antennae with all ancillary equipment, to upgrade existing cabin internally.

    Decided Telecoms 2 docs
  • 1 Burners Lane Kiln Farm Milton Keynes MK11 3HW

    20/00652/DISCON Submitted 10 Mar 2020 186m away

    Details submitted pursuant to discharge condition 12 (Cladding Details) attached to planning application 18/01804/FUL

    Decided Conditions 8 docs
  • Unit K1 K2 K3 Pitfield Kiln Farm Milton Keynes MK11 3LW

    20/01803/FUL Submitted 27 Jul 2020 238m away

    Refurbishment of industrial units, including amendments to elevations, yard extension (Unit K1), reconfiguration of car parking and new pedestrian footpaths (resubmission of 19/02671/FUL)

    Refused Full applications Extension 35 docs
  • 41 Potters Lane Kiln Farm Milton Keynes MK11 3HQ

    20/01441/FUL Submitted 18 Jun 2020 258m away

    Change of use from industrial unit (B2/B8 use) to a cheerleading and gymnastics academy (D2 use)

    Granted Full applications 13 docs

In Milton Keynes

  • PLN/2025/2661 Refused

    117 QUEENSWAY, BLETCHLEY, MILTON KEYNES, MK2 2DH

    Change of use to include Sui Generis laundromat, installation of laundry equipment and external alterations

    15 Dec 2025 Full applications
  • PLN/2026/1401 Granted

    BRITISH TELECOM, SILVER STREET, NEWPORT PAGNELL, MK16 0EJ

    Installation of ventilation louvres within existing ground floor windows to the north elevation

    2 Jul 2026 Full applications
  • PLN/2026/1150 Withdrawn

    Calverton Cottage, Calverton, Milton Keynes, MK19 6ED

    New building with hardstanding in adjacent field to include two stables, workshop and tractor storage including new gated ramped pathway, new hardstanding for vehicles with access, proposed landscaping/biodiversity enhancements, increase in land levels, alterations to the gate and walls of the existing vehicle access

    1 Jun 2026 Full applications
  • PLN/2026/0575 Refused

    George House, Crosslands, Stantonbury, Milton Keynes, MK14 6DB

    Use of land to extend existing site for temporary housing of homeless persons including replacement office building (Use Class E(g)(i)) and erection of ancillary shed

    17 Mar 2026 Full applications
  • PLN/2026/0959 Granted

    11-16 Juniper Gardens, Walnut Tree, Milton Keynes MK7 7LZ

    Replacement windows to all elevations and floors

    11 May 2026 Full applications