Planning application
2 Taunton Deane Emerson Valley Milton Keynes MK4 2BL
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
proposed single storey side extension forming a additional bedroom and en-suite shower room and the removal of 1.8 m high masonry garden wall adjoining front elevation in front of proposed extension.
As published by the council, reference 20/01180/FUL
Application record
- Reference
- 20/01180/FUL
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- Application permitted
- Received
- 18 May 2020
- Validated
- 18 May 2020
- Decided
- 10 Jul 2020
- Ward
- Bletchley West (Historic 2026)
- Parish
- Shenley Brook End
- Decision by
- Delegated Decision
- Postcode
- MK4 2BL
Timeline
Dates from the published record
-
18 May 2020
Received by Milton Keynes
-
10 Jul 2020
Decision issued: Application permitted
-
1 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
1 CULMSTOCK CLOSE, EMERSON VALLEY, MILTON KEYNES, MK4 2BH
The replacement of existing boundary treatment (hedge) with timber fencing
Refused Householder 6 docsDomestic -
1 CULMSTOCK CLOSE, EMERSON VALLEY, MILTON KEYNES, MK4 2BH
Certificate of Lawfulness for proposed removal of existing boundary treatment (hedge) and replacement with timber fencing
Refused Lawful development 6 docs -
68-69 Quantock Crescent, Emerson Valley, Milton Keynes, MK4 2AQ
Change of use from hostel (Sui Generis) to a children's home (Use Class C2) for up to 3 children (Regulation 3 application under the Town and Country Planning General Regulations 1992)
Granted Full applications 10 docs -
29 Quantock Crescent Emerson Valley Milton Keynes MK4 2AG
Part single, part two storey front and side extensions
Granted Full applications Extension 5 docs -
8 Forches Close Emerson Valley Milton Keynes MK4 2BE
1st floor side extension over single storey element of dwelling.
Granted Full applications Extension 7 docsSmall domestic -
Land off White Horse Drive, Emerson Valley, Milton Keynes, MK4 2AS
Construction of x10 affordable dwellings with associated access, parking, landscaping and other works
Withdrawn Full applications 34 docs
Other full applications applications
In Milton Keynes
-
PLN/2025/2661 Refused
117 QUEENSWAY, BLETCHLEY, MILTON KEYNES, MK2 2DH
Change of use to include Sui Generis laundromat, installation of laundry equipment and external alterations
-
PLN/2026/1401 Granted
BRITISH TELECOM, SILVER STREET, NEWPORT PAGNELL, MK16 0EJ
Installation of ventilation louvres within existing ground floor windows to the north elevation
-
PLN/2026/1150 Withdrawn
Calverton Cottage, Calverton, Milton Keynes, MK19 6ED
New building with hardstanding in adjacent field to include two stables, workshop and tractor storage including new gated ramped pathway, new hardstanding for vehicles with access, proposed landscaping/biodiversity enhancements, increase in land levels, alterations to the gate and walls of the existing vehicle access
-
PLN/2026/0575 Refused
George House, Crosslands, Stantonbury, Milton Keynes, MK14 6DB
Use of land to extend existing site for temporary housing of homeless persons including replacement office building (Use Class E(g)(i)) and erection of ancillary shed
-
PLN/2026/0959 Granted
11-16 Juniper Gardens, Walnut Tree, Milton Keynes MK7 7LZ
Replacement windows to all elevations and floors