Planning application
Unisys Logistics Centre, Tongwell Street H5 To H6, Milton Keynes, MK15 0YA
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of existing building and the erection of approximately 24,000 sqm (GIA) of B1c and/ or B8 uses with ancillary B1 offices, associated access, landscaping and parking (resubmission of 19/02406/FUL)
As published by the council, reference 20/01134/FUL
Application record
- Reference
- 20/01134/FUL
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- Application permitted
- Received
- 11 May 2020
- Validated
- 11 May 2020
- Decided
- 30 Oct 2020
- Ward
- Broughton (Historic 2026)
- Parish
- Broughton and Milton Keynes (Historic 2026)
- Decision by
- Committee
- Postcode
- MK15 0YA
Timeline
Dates from the published record
-
11 May 2020
Received by Milton Keynes
-
30 Oct 2020
Decision issued: Application permitted
-
1 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
646 applications on PlanIndex · across 83 councils · 95% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
72 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Willen House, Emerald Gate, Fox Milne, Tongwell Street H5 To H6, Milton Keynes, MK15 0YS
Demolition of existing building and the erection of approximately 24,000 sqm of B1c and/or B8 uses with associated access, landscaping and parking.
Refused Full applications Demolition 108 docs -
Unisys Logistics Centre Tongwell Street H5 To H6 Milton Keynes MK15 0YA
Variation of condition 1 (Approved drawings/details), condition 2 (external materials) and the wording of condition 20 (requirement for addition car parking under use class E(g)(iii) (light industrial)) of planning permission 22/00689/FULMMA for changes to Unit 2 including addition of CCTV and height restriction barrier, reduction of car parking spaces including removal of decked car park, alteration to canopy for loading bays, additional pedestrian doors and access, consequential amendments to materials, lighting, landscaping, relocation of apiary and removal of gatehouses for both Units 1 and 2
Granted Amendments 54 docs -
EXPRESS BY HOLIDAY INN, MILTON KEYNES, MK15 0YA
Prior approval for the installation of 324 roof-mounted solar PV panels to a total system size of 146 kWp
Granted Prior approval 9 docs
Other full applications applications
In Milton Keynes
-
PLN/2025/2661 Refused
117 QUEENSWAY, BLETCHLEY, MILTON KEYNES, MK2 2DH
Change of use to include Sui Generis laundromat, installation of laundry equipment and external alterations
-
PLN/2026/1401 Granted
BRITISH TELECOM, SILVER STREET, NEWPORT PAGNELL, MK16 0EJ
Installation of ventilation louvres within existing ground floor windows to the north elevation
-
PLN/2026/1150 Withdrawn
Calverton Cottage, Calverton, Milton Keynes, MK19 6ED
New building with hardstanding in adjacent field to include two stables, workshop and tractor storage including new gated ramped pathway, new hardstanding for vehicles with access, proposed landscaping/biodiversity enhancements, increase in land levels, alterations to the gate and walls of the existing vehicle access
-
PLN/2026/0575 Refused
George House, Crosslands, Stantonbury, Milton Keynes, MK14 6DB
Use of land to extend existing site for temporary housing of homeless persons including replacement office building (Use Class E(g)(i)) and erection of ancillary shed
-
PLN/2026/0959 Granted
11-16 Juniper Gardens, Walnut Tree, Milton Keynes MK7 7LZ
Replacement windows to all elevations and floors