Planning application
Telecommunications Site East of Loughton Roundabout Portway V4 To A5 Milton Keynes
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Prior notification for the siting of a telecommunications pole (20 metres), equipment cabinet, meter cabinet and associated ancillary development
As published by the council, reference 20/00137/PANOTH
Application record
- Reference
- 20/00137/PANOTH
- Type
- Prior Notifications: Other
- Status
- Decision Made
- Decision
- Approved
- Received
- 21 Jan 2020
- Validated
- 22 Jan 2020
- Decided
- 17 Mar 2020
- Ward
- Loughton & Shenley (Historic 2026)
- Parish
- Loughton
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
21 Jan 2020
Received by Milton Keynes
-
22 Jan 2020
Validated
Checked as complete and ready for consideration.
-
17 Mar 2020
Decision issued: Approved
-
2 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
Fire Station Haddon Great Holm Milton Keynes MK8 9HP
Outline planning application for the development of 18 homes and associated infrastructure
Withdrawn Outline 33 docs -
Fire Station Haddon Great Holm Milton Keynes MK8 9HP
Demolition of existing buildings and structures and erection of a care home (within use Class C2) with parking, access, landscaping and other associated works
Granted Full applications Demolition 129 docs -
Fire Station Haddon Great Holm Milton Keynes MK8 9HP
Approval of details required by conditions 5 (LEMP) of permission ref. 22/00813/FUL
Decided Conditions 7 docs -
Fire Station Haddon Great Holm Milton Keynes MK8 9HP
Approval of details required by condition 16 (Documentary record of existing buildings and structures) of permission ref. 22/00813/FUL
Decided Conditions 11 docs -
Fire Station Haddon Great Holm Milton Keynes MK8 9HP
Approval of details required by condition 6 (Surface Water Drainage Scheme) and condition 13 (Drainage Scheme Management and Maintenance) of permission ref. 22/00813/FUL
Decided Conditions 23 docs -
Fire Station Haddon Great Holm Milton Keynes MK8 9HP
Approval of details required by condition 4 (CEMP) of permission ref. 22/00813/FUL
Decided Conditions 6 docs
Other prior approval applications
In Milton Keynes
-
PLN/2026/1315 Granted
BLETCHLEY LEISURE CENTRE, PRINCES WAY, BLETCHLEY, MILTON KEYNES, MK2 2HQ
Prior notification for the installation of 254 roof-mounted photovoltaic (PV) solar panels (154.9kWp total installed capacity) on the north and south-facing pitched roof slopes of the existing leisure centre building, including associated mounting equipment, cabling, electrical infrastructure, and all ancillary works
-
PLN/2026/1215 Granted
AFL Telecommunications Uk Ltd, Davy Avenue , Knowlhill , Milton Keynes, MK5 8ND
Prior notification for the installation of a 336.3kWp solar PV system with 708 panels split on two roofs. Will be on a pitched standing seam mounting roof system.
-
PLN/2026/1740 Awaiting decision
Nimbus House, Maidstone Road, Kingston, Milton Keynes, MK10 0BD
Prior Approval for the proposed installation of a Solar Photovoltaic (PV) system mounted on the existing metal trapezoidal sheet roof of the building
-
PLN/2026/1430 Refused
66 BRADWELL ROAD, LOUGHTON, MILTON KEYNES, MK5 8AL
Prior Approval of single storey rear extension, with eaves of 2.5 metres and maximum height of 2.5 metres, and extending 6.0 metres from the original rear wall of the dwellinghouse
-
PLN/2026/1314 Granted
WOUGHTON CENTRE, RAINBOW DRIVE, LEADENHALL, MILTON KEYNES, MK6 5EJ
Prior notification for the proposed installation of a 97.6kWp roof-mounted solar photovoltaic (PV) array on the south-facing roof of the Leisure Centre, together with associated battery energy storage equipment (102kW capacity), inverters, mounting systems, control equipment, cable routes, and ancillary works including external plant installation, temporary construction compound, access arrangements, and associated infrastructure