Skip to content
PlanIndex Get alerts
Menu

Planning application

14 Winstanley Lane Shenley Lodge Milton Keynes MK5 7BT

Granted Milton Keynes 19/02834/FUL Full planning permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Front infill extension and single storey rear extension to replace conservatory

As published by the council, reference 19/02834/FUL

Application record

Reference
19/02834/FUL
Type
Full planning permission
Status
Decision Made
Decision
Application permitted
Received
25 Oct 2019
Validated
25 Oct 2019
Decided
9 Dec 2019
Ward
Shenley Brook End (Historic 2026)
Parish
Shenley Brook End
Decision by
Delegated Decision
Postcode
MK5 7BT

Timeline

Dates from the published record

  1. 25 Oct 2019

    Received by Milton Keynes

  2. 9 Dec 2019

    Decision issued: Application permitted

  3. 4 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 7 Hollister Chase Shenley Lodge Milton Keynes MK5 7DH

    20/00733/FUL Submitted 17 Mar 2020 181m away

    Loft conversion with rooflights to front and rear roofslopes and enclosing existing front porch

    Granted Full applications Extension Loft or dormer 10 docs
    Small domestic
  • 2 CHALWELL RIDGE, SHENLEY BROOK END, MILTON KEYNES, MK5 7HN

    PLN/2026/0903 Submitted 1 May 2026 191m away

    Erection of front porch, single storey side and front extension including changed ridge height and pitch of roof of existing side extension, and rear conservatory

    Withdrawn Householder Extension Roofing 5 docs
    Small domestic
  • 31 MOREBATH GROVE, FURZTON, MILTON KEYNES, MK4 1JW

    PLN/2026/0477 Submitted 9 Mar 2026 229m away

    Proposed repositioning of the existing closed boarded fencing to align with the site boundary (Retrospective)

    Refused Householder 8 docs
    Domestic
  • 4 Upton Grove Shenley Lodge Milton Keynes MK5 7BY

    19/03159/FUL Submitted 27 Nov 2019 260m away

    Single Storey Side Extension & First Floor Balcony.

    Granted Full applications Extension 18 docs
    Small domestic
  • 4 Upton Grove Shenley Lodge Milton Keynes MK5 7BY

    20/01151/DISCON Submitted 13 May 2020 261m away

    Details submitted pursuant to discharge condition 4 (boundary treatments) attached to planning application 19/03159/FUL

    Decided Conditions 5 docs
  • 20 Bilbrook Lane Furzton Milton Keynes MK4 1LW

    22/02171/HOU Submitted 26 Aug 2022 265m away

    Erection of single storey side extension and retrospective approval of garage conversion to interior storage space.

    Refused Householder Extension 8 docs
    Small domestic

In Milton Keynes

  • PLN/2025/2661 Refused

    117 QUEENSWAY, BLETCHLEY, MILTON KEYNES, MK2 2DH

    Change of use to include Sui Generis laundromat, installation of laundry equipment and external alterations

    15 Dec 2025 Full applications
  • PLN/2026/1401 Granted

    BRITISH TELECOM, SILVER STREET, NEWPORT PAGNELL, MK16 0EJ

    Installation of ventilation louvres within existing ground floor windows to the north elevation

    2 Jul 2026 Full applications
  • PLN/2026/1150 Withdrawn

    Calverton Cottage, Calverton, Milton Keynes, MK19 6ED

    New building with hardstanding in adjacent field to include two stables, workshop and tractor storage including new gated ramped pathway, new hardstanding for vehicles with access, proposed landscaping/biodiversity enhancements, increase in land levels, alterations to the gate and walls of the existing vehicle access

    1 Jun 2026 Full applications
  • PLN/2026/0575 Refused

    George House, Crosslands, Stantonbury, Milton Keynes, MK14 6DB

    Use of land to extend existing site for temporary housing of homeless persons including replacement office building (Use Class E(g)(i)) and erection of ancillary shed

    17 Mar 2026 Full applications
  • PLN/2026/0959 Granted

    11-16 Juniper Gardens, Walnut Tree, Milton Keynes MK7 7LZ

    Replacement windows to all elevations and floors

    11 May 2026 Full applications