Planning application
Lupprians Computer Express Ltd Dawson Road Bletchley Milton Keynes MK1 1QY
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Certificate of lawfulness for proposed erecting of a canopy which is fixed with an adhesive to an already existing warehouse building for a limited time (12-30 months)
As published by the council, reference 19/02816/CLUP
Application record
- Reference
- 19/02816/CLUP
- Type
- Lawful development certificate (proposed)
- Status
- Decision Made
- Decision
- Approved
- Received
- 25 Oct 2019
- Validated
- 28 Oct 2019
- Decided
- 20 Dec 2019
- Ward
- Bletchley East (Historic 2026)
- Parish
- Bletchley and Fenny Stratford
- Decision by
- Delegated Decision
- Postcode
- MK1 1QY
Timeline
Dates from the published record
-
25 Oct 2019
Received by Milton Keynes
-
28 Oct 2019
Validated
Checked as complete and ready for consideration.
-
20 Dec 2019
Decision issued: Approved
-
4 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About lawful development applications
How this application type works
A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.
Nearby applications
Within 500 metres
-
Castle House, Dawson Road, Bletchley, Milton Keynes, MK1 1QY
79% historically approved · decision due ~26 Jun
Extension to carpark to increase parking provision from 77 to 92 spaces, including 5 EV charging bays, 2 accessible spaces and a store for 10 bicycles together with landscaping and associated drainage works. Retention of existing boundary fencing posts and proposed replacement boundary fencing, including associated planting/ecological enhancements
Awaiting decision Full applications Extension 26 docs -
Castle House, Dawson Road, Bletchley, Milton Keynes, MK1 1QY
Retention of existing posts to side (east) boundary and the proposed erection of boundary fencing comprising green welded mesh panels
Refused Full applications 9 docs -
MCDONALDS, STADIUM WAY EAST, DENBIGH NORTH, MILTON KEYNES, MK1 1ET
Certificate of lawfulness for the proposed installation of four electrical upstands and associated feeder pillar for recharging vehicles
Granted Lawful development 10 docs -
H M C Brauer Ltd Dawson Road Bletchley Milton Keynes MK1 1JP
Removal and replacement of the existing 18 metre high tower with an upgraded 25 metre high tower, the relocation of 1No. existing 0.3 metre diameter dish and installation of 3No. 0.6 metre diameter dishes, 8No. equipment cabinets and ancillary development
Granted Full applications 13 docs -
Telecommunications Mast HMC Brauer Dawson Road Bletchley MK1 1JP
Formal advance 28 days notice in accordance with Regulation 5 of the Electronic Communications Code (Conditions and Restrictions) Regulations 2003 of intention to install 3 No. antennas and 1 No. GPS module and 1No. Huawei APM5930 cabinet measuring 600 x 480 x 1000mm and ancillary development under permitted development rights
Decided Telecoms 2 docs -
Telecommunications Site Outside Mcdonalds Stadium Way East Denbigh North Milton Keynes
Erection of one 5G communication mast 15.4m in height with associated cabinets
Granted Full applications 11 docs
Other lawful development applications
In Milton Keynes
-
PLN/2026/1586 Withdrawn
4 BROMHAM MILL, GIFFARD PARK, MILTON KEYNES, MK14 5QP
Certificate of lawfulness for the proposed garage conversion and side extension
-
PLN/2026/1370 Refused
15 CASTLE ROSE, WOUGHTON PARK, MILTON KEYNES, MK6 3BQ
Certificate of lawfulness for the proposed construction of a low brick wall with railings (1.5 m overall), brick piers, sliding gate set 5 m from road, and pedestrian gate within domestic curtilage
-
PLN/2026/1393 Refused
2 GREATCHESTERS, BANCROFT, MILTON KEYNES, MK13 0PA
Certificate of lawfulness for the proposed demolition of existing conservatory, erection of a new rear extension, infill the space under the carport and loft conversion with a rear dormer
-
PLN/2026/1741 Awaiting decision
5 Spring Mews, Sherington, MK16 9FT
Certificate of lawfulness for the existing detached rear outbuilding for use as a garden studio
-
PLN/2026/1170 Granted
61 WINDSOR STREET, BLETCHLEY, MILTON KEYNES, MK2 2LN
Certificate of lawfulness for proposed loft conversion with rear and side dormer extension and rooflights to front roof slope