Skip to content
PlanIndex Get alerts
Menu

Planning application

Site 2 Elmswell Gate Towergate Milton Keynes

Refused Milton Keynes 19/02134/FUL Full planning permission

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Erection of drive-through restaurant (Class A3/A5) and 87-bed hotel (Class C1), with associated parking and landscaping

As published by the council, reference 19/02134/FUL

Application record

Reference
19/02134/FUL
Type
Full planning permission
Status
Decision Made
Decision
Application Refused
Received
23 Aug 2019
Validated
23 Aug 2019
Decided
13 Dec 2019
Ward
Danesborough & Walton (Historic 2026)
Parish
Walton (Historic 2026)
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 23 Aug 2019

    Received by Milton Keynes

  2. 13 Dec 2019

    Decision issued: Application Refused

  3. 4 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

49 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Site 2 Elmswell Gate Towergate Milton Keynes

    22/03094/NMA Submitted 14 Dec 2022 6m away

    Non-material amendment to permission ref. 20/03029/FUL seeking the relocation of the proposed boundary fence to retain existing foliage relating to the Erection of a drive-through restaurant (Class A3/A5), with associated parking and landscaping (re-submission of 20/01983/FUL)

    Refused Amendments 5 docs
    Small domestic
  • Land At Towergate A Groveway Milton Keynes MK17 8LU

    22/02777/DISCON Submitted 7 Nov 2022 97m away

    Approval of details required by condition 3 (Lighting Plan) of permission ref. 21/02502/FUL

    Decided Conditions 11 docs
  • Site South East of Elmswell Gate Towergate Milton Keynes

    19/02178/NMA Submitted 21 Aug 2019 99m away

    Non material amendment to application 18/03056/REM

    Refused Amendments 6 docs
  • Site South East of Elmswell Gate Towergate Milton Keynes

    20/01138/NMA Submitted 11 May 2020 99m away

    Non material amendment to application 18/03056/REM (for reserved matters application for the appearance of 49 plots with associated amendments to prior approved parking; landscaping and boundary treatment plans following grant of planning permission 15/02768/OUT) relating to the external appearance and housing types of 49 plots at Elmswell Gate

    Granted Amendments 20 docs
  • Site South East of Elmswell Gate Towergate Milton Keynes

    19/03251/NMA Submitted 5 Dec 2019 99m away

    Non material amendment to application 18/02461/REM

    Granted Amendments 9 docs
  • 24 ELMSWELL ROAD, GLEBE FARM, MILTON KEYNES, MK17 8GZ

    PLN/2025/2297 Submitted 29 Oct 2025 183m away

    The erection of a rear conservatory

    Granted Householder Extension 9 docs
    Small domestic

In Milton Keynes

  • PLN/2025/2661 Refused

    117 QUEENSWAY, BLETCHLEY, MILTON KEYNES, MK2 2DH

    Change of use to include Sui Generis laundromat, installation of laundry equipment and external alterations

    15 Dec 2025 Full applications
  • PLN/2026/1401 Granted

    BRITISH TELECOM, SILVER STREET, NEWPORT PAGNELL, MK16 0EJ

    Installation of ventilation louvres within existing ground floor windows to the north elevation

    2 Jul 2026 Full applications
  • PLN/2026/1150 Withdrawn

    Calverton Cottage, Calverton, Milton Keynes, MK19 6ED

    New building with hardstanding in adjacent field to include two stables, workshop and tractor storage including new gated ramped pathway, new hardstanding for vehicles with access, proposed landscaping/biodiversity enhancements, increase in land levels, alterations to the gate and walls of the existing vehicle access

    1 Jun 2026 Full applications
  • PLN/2026/0575 Refused

    George House, Crosslands, Stantonbury, Milton Keynes, MK14 6DB

    Use of land to extend existing site for temporary housing of homeless persons including replacement office building (Use Class E(g)(i)) and erection of ancillary shed

    17 Mar 2026 Full applications
  • PLN/2026/0959 Granted

    11-16 Juniper Gardens, Walnut Tree, Milton Keynes MK7 7LZ

    Replacement windows to all elevations and floors

    11 May 2026 Full applications