Planning application
Upper Clapperton Villa 15 Lower Bonnybank Road Gorebridge EH23 4DA
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Alterations to dwellinghouse to increase roof height including formation of chimneys
As published by the council, reference 22/00480/DPP
Application record
- Reference
- 22/00480/DPP
- Type
- Detailed Planning Permission
- Status
- Decided
- Decision
- Grant with conditions
- Received
- 28 Jun 2022
- Validated
- 28 Jun 2022
- Decided
- 13 Apr 2023
- Ward
- Midlothian South
- Parish
- Gorebridge & District Community Council
- Decision by
- Delegated Decision
- Postcode
- EH23 4DA
Timeline
Dates from the published record
-
28 Jun 2022
Received by Midlothian
-
13 Apr 2023
Decision issued: Grant with conditions
-
16 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
6 applications on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
31 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
5 Braeside Road South Gorebridge EH23 4DN
Alterations to garden levels, erection of retaining wall and formation of driveway (retrospective)
Granted Full applications 29 docs -
-
24 Hunterfield Road Gorebridge EH23 4TR
Installation of replacement windows and front door
Granted Full applications Windows or glazing 20 docs -
2 Private Road Gorebridge EH23 4HG
94% historically approved · decision due ~27 Nov
Erection of extensions and porch; extension to existing garages and associated alterations
Awaiting decision Full applications Extension 14 docsSmall domestic -
35 Vogrie Road Gorebridge EH23 4HH
Extension to dwellinghouse
Granted Full applications Extension 17 docsDomestic -
13 Hunterfield Road Gorebridge EH23 4TP
100% historically approved · decision due ~1 Jan
Internal and external alterations including installation of replacement roof
Awaiting decision Heritage and listed buildings Roofing 2 docs
Other full applications applications
In Midlothian
-
26/00471/DPP Awaiting decision
Dalhousie Mains Dalkeith EH22 3LZ
Installation of solar arrays
-
26/00331/DPP Granted
4 Dundas Grove Dalkeith EH22 3EP
Erection of garden room
-
26/00457/DPP Awaiting decision
35 Whitehouse Way Gorebridge EH23 4FP
Erection of outbuilding (Retrospective)
-
26/00453/DPP Awaiting decision
44 Edgehead Road Edgehead Pathhead EH37 5RJ
Installation of replacement doors and windows
-
26/00444/DPP Awaiting decision
28 Sherwood Loan Bonnyrigg EH19 3NF
Erection of extension and porch