Planning application
57 Main Street Pathhead EH37 5PZ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of air source heat pump; and refurbishment and repainting of external doors
As published by the council, reference 21/00809/DPP
Application record
- Reference
- 21/00809/DPP
- Type
- Detailed Planning Permission
- Status
- Decided
- Decision
- Granted As published: Grant with conditions
- Received
- 1 Oct 2021
- Validated
- 18 Oct 2021
- Decided
- 13 Dec 2021
- Ward
- Midlothian East
- Parish
- Tynewater Community Council
- Decision by
- Delegated Decision
- Postcode
- EH37 5PZ
Site history
Applications at this address on the Midlothian register
This site has had 6 applications since 2021: 6 approved, 0 refused.
-
24/00115/LBC Granted
57 Main Street Pathhead EH37 5PZ
Repointing of stonework and installation of vent pipe
-
23/00127/LBC Granted
57 Main Street Pathhead EH37 5PZ
Installation of boiler, boiler flue and associated works
-
21/00808/LBC Granted
57 Main Street Pathhead EH37 5PZ
Internal alterations
-
21/00753/LBC Granted
57 Main Street Pathhead EH37 5PZ
Refurbishment and repainting of external doors
-
21/00400/LBC Granted
57 Main Street Pathhead EH37 5PZ
Refurbishment of windows and installation of replacement glazing
Timeline
Dates from the published record
-
1 Oct 2021
Received by Midlothian
-
18 Oct 2021
Validated
Checked as complete and ready for consideration.
-
13 Dec 2021
Decision issued: Grant with conditions
-
16 Nov 2026
Added to PlanIndex
Documents
30 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Midlothian granted permission on 13 December 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
-
57 Main Street Pathhead EH37 5PZ
Refurbishment of windows and installation of replacement glazing
Granted Heritage and listed buildings Windows or glazing 13 docs -
57 Main Street Pathhead EH37 5PZ
Installation of boiler, boiler flue and associated works
Granted Heritage and listed buildings 14 docs -
57 Main Street Pathhead EH37 5PZ
Refurbishment and repainting of external doors
Granted Heritage and listed buildings 13 docs -
57 Main Street Pathhead EH37 5PZ
Repointing of stonework and installation of vent pipe
Granted Heritage and listed buildings 17 docs -
Small domestic
Other full applications
In Midlothian
-
26/00502/DPP Granted
65 Gardiner Place Newtongrange EH22 4RT
Formation of dormer windows
-
26/00365/DPP Granted
9 Polton Street Bonnyrigg EH19 3HB
Subdivision and change of use of commercial unit to form four units comprising hot food takeaway (sui generis), two food and drink units (Class 3) and retail (Class 1A); extension to building and external alterations including formation of window openings, installation of flues and formation of ramp and engineering operations
-
26/00508/DPP Granted
167 Main Street Pathhead EH37 5SQ
Installation of replacement windows and door
-
26/00488/DPP Granted
Kenmore 18 Broomieknowe Lasswade EH18 1LN
Installation of rooflights
-
26/00623/DPP Awaiting decision
34 Abernethy Drive Roslin EH25 9AU
Extension to dwellinghouse