Skip to content
PlanIndex Get alerts
Menu

Planning application

6, Old Stokesley Road, Middlesbrough, TS7 0NN

Awaiting decision Middlesbrough 26/0331/LBC Listed Building Consent

Works: Loft or dormer Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of 4no. velux windows to roof of rear ground floor single storey room

As published by the council, reference 26/0331/LBC

Application record

Reference
26/0331/LBC
Type
Listed Building Consent
Status
Pending Consideration
Received
24 Jul 2026
Validated
27 Jul 2026
Ward
Nunthorpe
Parish
Nunthorpe Parish Council, Parish buffer = Nunthorpe CP
Decision by
Delegated Decision
Postcode
TS7 0NN

Timeline

Dates from the published record

  1. 24 Jul 2026

    Received by Middlesbrough

  2. 27 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 6 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 21 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Middlesbrough took a median of 58 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Middlesbrough for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

In Middlesbrough

  • 26/0283/LBC Withdrawn

    Westside House, Stokesley Road, Middlesbrough, TS7 8BG

    Erection of ancillary garden building to rear

    25 Jun 2026 Heritage and listed buildings
  • 23/5006/LBC Refused

    36, Linthorpe Road, Middlesbrough, TS1 1RD

    Listed building consent to accommodate commercial /student accommodation development, to include demolition of rear external offshoot at no.38 Linthorpe Road and erection of new glazed service tower to rear, dormer extension to rear, roof top terrace to rear, external reparation and alterations to stonework/windows/doors and associated internal alterations.

    1 Jun 2023 Heritage and listed buildings
  • 24/0497/LBC Awaiting decision

    59, High Street, Middlesbrough, TS7 9PB

    Retrospective replacement of timber windows and doors to UPVC

    25 Nov 2024 Heritage and listed buildings
  • 23/0022/LBC Granted

    8 West Side, Middlesbrough, TS7 0NN

    Replacement of 3 no. timber spring balanced single glazed windows

    9 Jan 2023 Heritage and listed buildings
  • 21/0487/LBC Granted

    Middlesbrough Railway Station Zetland Road Middlesbrough TS1 1EG

    Various works including removal of the existing floor, wall and ceiling finishes within the passenger toilets, removal of existing sanitaryware and removal of dividing partition with proposed installation of new floor, wall and ceiling finishes.

    1 Jul 2021 Heritage and listed buildings