Planning application
50, The Grove, Middlesbrough, TS7 8AJ
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey extension to side (Demoltion of existing side extension)
As published by the council, reference 24/0364/FUL
Application record
- Reference
- 24/0364/FUL
- Type
- Full Planning
- Status
- Decision Issued
- Decision
- Approve with Conditions
- Received
- 4 Sep 2024
- Validated
- 8 Oct 2024
- Decided
- 29 Nov 2024
- Ward
- Marton East
- Decision by
- Delegated Decision
- Postcode
- TS7 8AJ
Timeline
Dates from the published record
-
4 Sep 2024
Received by Middlesbrough
-
8 Oct 2024
Validated
Checked as complete and ready for consideration.
-
29 Nov 2024
Decision issued: Approve with Conditions
-
13 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
70, The Grove, Middlesbrough, TS7 8AJ
Two storey extension to side and rear and single storey extension to rear
Refused Full applications Extension 17 docsSmall domestic -
72 The Grove Marton Middlesbrough TS7 8AJ
Second floor dormer extension to side and installation of four roof lights
Granted Full applications Extension Loft or dormer 8 docs -
78, 1, INWOOD LODGE, The Grove, MIDDLESBROUGH, TS7 8AP
74% historically approved · decision due ~5 Oct
Single storey extension with concealed flat roof to rear, including installation of roof light and associated alterations with glazed doors
Awaiting decision Full applications Extension Loft or dormer +1 11 docsSmall domestic -
15 The Grove Marton Middlesbrough TS7 8AB
Removal of 1 no. conifer and 1 no. purple-leafed plum and crown reduction of 1 no. conifer
Granted Trees
Other full applications applications
In Middlesbrough
-
26/0315/FUL Granted
5 Topcroft Close, Middlesbrough, TS3 0BG
Single storey extension to rear
-
26/0266/FUL Granted
6, Virginia Gardens, Middlesbrough, TS5 8BT
Erection of single storey extension and infill extension to rear (Demolition of existing garage)
-
26/0379/FUL Awaiting decision
Blue Bell Hotel, Acklam Road, Middlesbrough, TS5 7HL
Installation of 2no. gates to rear yard
-
26/0215/COU Granted
185 Park Road South, Middlesbrough, TS4 2RA
Change of use to residential curtilage (including erection of fence and vehicular gate)
-
26/0084/FUL Granted
623, Marton Road, Middlesbrough, TS4 3SE
Part single storey, part two storey extension to rear and single storey extension to side attached garage extension (Demolition of single storey extension, attached outbuilding and existing detached timber garage)