Skip to content
PlanIndex Get alerts
Menu

Planning application

78 , Birchwood Road, Middlesbrough, Middlesbrough, TS7 8DQ

Refused Middlesbrough 24/0339/FUL Full Planning

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Proposed two storey extension to side / rear, single storey extension to rear and single storey extension to front.

As published by the council, reference 24/0339/FUL

Application record

Reference
24/0339/FUL
Type
Full Planning
Status
Decision Issued
Decision
Refused
Received
21 Aug 2024
Validated
22 Aug 2024
Decided
15 Nov 2024
Ward
Marton East
Decision by
Delegated Decision
Postcode
TS7 8DQ

Timeline

Dates from the published record

  1. 21 Aug 2024

    Received by Middlesbrough

  2. 22 Aug 2024

    Validated

    Checked as complete and ready for consideration.

  3. 15 Nov 2024

    Decision issued: Refused

  4. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 36 Hazel Grove Middlesbrough TS7 8DJ

    21/0296/COU Submitted 15 Apr 2021 144m away

    Change of use of open space to residential curtilage and erection of boundary fence

    Granted Full applications 17 docs
    Small domestic
  • 23, Birchwood Road, Middlesbrough, TS7 8DD

    24/0517/COU Submitted 3 Dec 2024 184m away

    74% historically approved · decision due ~30 May

    Retrospective change of use of land from open space to residential use, and installation of 1.8m high enclosure fence

    Awaiting decision Full applications 9 docs
    Small domestic
  • 9, Cedar Road, Middlesbrough, TS7 8DA

    23/0041/FUL Submitted 20 Jan 2023 241m away

    Demolition of existing garage and single/two storey extension to side

    Granted Full applications Extension Demolition 8 docs
  • 102 Gypsy Lane Marton Middlesbrough TS7 8PD

    M/FP/1215/03/P Submitted 23 Jul 2003 252m away

    FIRST FLOOR BEDROOM EXTENSION AT SIDE

    Granted Full applications Extension
  • 42, Low Gill View, Middlesbrough TS7 8BF

    23/0056/FUL Submitted 19 Jan 2023 305m away

    Hip to gable loft conversion and installation of 4 rooflights

    Granted Full applications Loft or dormer 12 docs
  • 36 Barnack Avenue Middlesbrough TS7 8QB

    21/0585/FUL Submitted 6 Aug 2021 312m away

    Pitched roof/canopy extension to front (to include moving one window)

    Granted Full applications Extension Windows or glazing 5 docs

In Middlesbrough

  • 26/0315/FUL Granted

    5 Topcroft Close, Middlesbrough, TS3 0BG

    Single storey extension to rear

    20 Jul 2026 Full applications
  • 26/0266/FUL Granted

    6, Virginia Gardens, Middlesbrough, TS5 8BT

    Erection of single storey extension and infill extension to rear (Demolition of existing garage)

    19 Jun 2026 Full applications
  • 26/0379/FUL Awaiting decision

    Blue Bell Hotel, Acklam Road, Middlesbrough, TS5 7HL

    Installation of 2no. gates to rear yard

    24 Aug 2026 Full applications
  • 26/0215/COU Granted

    185 Park Road South, Middlesbrough, TS4 2RA

    Change of use to residential curtilage (including erection of fence and vehicular gate)

    15 May 2026 Full applications
  • 26/0084/FUL Granted

    623, Marton Road, Middlesbrough, TS4 3SE

    Part single storey, part two storey extension to rear and single storey extension to side attached garage extension (Demolition of single storey extension, attached outbuilding and existing detached timber garage)

    18 Feb 2026 Full applications