Skip to content
PlanIndex Get alerts
Menu

Planning application

48, Gunnergate Lane, Middlesbrough, TS7 8JB

Granted Middlesbrough 23/0153/FUL Full Planning

Works: Extension Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey extension to side, new pitched roof on existing side protrusion, alterations to one first floor window and retrospective construction of a boundary wall

As published by the council, reference 23/0153/FUL

Application record

Reference
23/0153/FUL
Type
Full Planning
Status
Decision Issued
Decision
Approve with Conditions
Received
9 Mar 2023
Validated
6 Apr 2023
Decided
17 Apr 2023
Ward
Marton West
Decision by
Delegated Decision
Postcode
TS7 8JB

Timeline

Dates from the published record

  1. 9 Mar 2023

    Received by Middlesbrough

  2. 6 Apr 2023

    Validated

    Checked as complete and ready for consideration.

  3. 17 Apr 2023

    Decision issued: Approve with Conditions

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 54 Gunnergate Lane Middlesbrough TS7 8JB

    25/0614/FUL Submitted 21 Nov 2025 33m away

    74% historically approved · decision due ~19 Jan

    Single storey extension to rear, double storey extensions to side and rear, roof alterations including extension and dormer

    Awaiting decision Full applications Extension Loft or dormer +1 10 docs
    Small domestic
  • 20 Canberra Road Middlesbrough TS7 8EX

    21/0371/FUL Submitted 14 May 2021 143m away

    Two storey side extension & single storey extensions to front & rear with formation of two additional car parking spaces.

    Refused Full applications Extension 7 docs
    Small domestic
  • 15, Canberra Road, Middlesbrough, TS7 8EU

    23/0073/FUL Submitted 6 Feb 2023 163m away

    Alterations and extension to garage to form a home office and playroom. Formation of two additional car parking spaces.

    Granted Full applications Extension 7 docs
  • 9, Glenn Crescent, Middlesbrough, TS7 8ED

    26/0314/FUL Submitted 17 Jul 2026 228m away

    74% historically approved · decision due ~14 Sep

    Retrospective erection of porch and installation render to front

    Awaiting decision Full applications Extension 8 docs
    Small domestic
  • 3 Perth Crescent Middlesbrough TS7 8ET

    21/0510/FUL Submitted 9 Jul 2021 229m away

    Two storey extension to side and single storey extension to rear

    Granted Full applications Extension 13 docs
    Small domestic
  • 39, Stokesley Road, Middlesbrough, TS7 8DT

    24/0335/FUL Submitted 16 Aug 2024 270m away

    Part retrospective erection of outbuilding to rear

    Granted Full applications 8 docs

In Middlesbrough

  • 26/0315/FUL Granted

    5 Topcroft Close, Middlesbrough, TS3 0BG

    Single storey extension to rear

    20 Jul 2026 Full applications
  • 26/0266/FUL Granted

    6, Virginia Gardens, Middlesbrough, TS5 8BT

    Erection of single storey extension and infill extension to rear (Demolition of existing garage)

    19 Jun 2026 Full applications
  • 26/0379/FUL Awaiting decision

    Blue Bell Hotel, Acklam Road, Middlesbrough, TS5 7HL

    Installation of 2no. gates to rear yard

    24 Aug 2026 Full applications
  • 26/0215/COU Granted

    185 Park Road South, Middlesbrough, TS4 2RA

    Change of use to residential curtilage (including erection of fence and vehicular gate)

    15 May 2026 Full applications
  • 26/0084/FUL Granted

    623, Marton Road, Middlesbrough, TS4 3SE

    Part single storey, part two storey extension to rear and single storey extension to side attached garage extension (Demolition of single storey extension, attached outbuilding and existing detached timber garage)

    18 Feb 2026 Full applications