Planning application
James Cook University Hospital Marton Road Middlesbrough TS4 3BW
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of entrance lobby and link corridor to Paediatric ED Unit.
As published by the council, reference 21/0516/FUL
Application record
- Reference
- 21/0516/FUL
- Type
- Full Planning
- Status
- All Consultations complete
- Decision
- Approve with Conditions
- Received
- 7 Jul 2021
- Validated
- 9 Aug 2021
- Decided
- 6 Sep 2021
- Ward
- Longlands/Beechwood
- Decision by
- Delegated Decision
- Postcode
- TS4 3BW
Timeline
Dates from the published record
-
7 Jul 2021
Received by Middlesbrough
-
9 Aug 2021
Validated
Checked as complete and ready for consideration.
-
6 Sep 2021
Decision issued: Approve with Conditions
-
29 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Middlesbrough
54 applications on PlanIndex · across 25 councils · 94% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Rear of Durham House, James Cook University Hospital, Marton Road, Middlesbrough, TS4 3BW
Removal of 1no. Sycamore
Granted Trees 4 docs -
Marton Road Middlesbrough TS4 3BS
Installation of a replacement 20m streetpole supporting 6no antennas and remote radio units with the installation of a replacment cabinet and ancilliary development
Granted Telecoms 16 docs -
Marton Road, Middlesbrough, TS4 3BS
Upgrade our existing telecommunications installation
Granted Telecoms 1 doc -
Land At Beechwood Middlesbrough TS4 3EE
Discharge of condition no 5 (Highway Works) on planning application 20/0153/FUL
Decided Conditions 3 docs -
1 Hurworth Road, Middlesbrough, TS4 3DW
Retrospective Certificate of Lawful Development for roof alterations and enlargement undertaken as part of a loft conversion to the existing dwellinghouse, including hip-to-gable roof alteration, rear dormer and front rooflights, together with a single-storey rear extension
Refused Lawful development Extension Loft or dormer +1 13 docsSmall domestic -
Land At Beechwood Middlesbrough
Discharge of condition 12 (Scheme of Renewables) on planning application 20/0153/FUL
Decided Conditions 3 docs
Other full applications applications
In Middlesbrough
-
26/0315/FUL Granted
5 Topcroft Close, Middlesbrough, TS3 0BG
Single storey extension to rear
-
26/0266/FUL Granted
6, Virginia Gardens, Middlesbrough, TS5 8BT
Erection of single storey extension and infill extension to rear (Demolition of existing garage)
-
26/0379/FUL Awaiting decision
Blue Bell Hotel, Acklam Road, Middlesbrough, TS5 7HL
Installation of 2no. gates to rear yard
-
26/0215/COU Granted
185 Park Road South, Middlesbrough, TS4 2RA
Change of use to residential curtilage (including erection of fence and vehicular gate)
-
26/0084/FUL Granted
623, Marton Road, Middlesbrough, TS4 3SE
Part single storey, part two storey extension to rear and single storey extension to side attached garage extension (Demolition of single storey extension, attached outbuilding and existing detached timber garage)