Planning application
Site between 65 and 67 Killygullib Road Maghera
Works: Extension Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Planning application for infill site between 65 and 67 Killgullib Road for dwelling house and garage
As published by the council, reference LA09/2026/0035/F
Application record
- Reference
- LA09/2026/0035/F
- Type
- Full
- Status
- Permission Granted
- Decision
- Granted As published: Permission Granted
- Received
- 16 Jan 2026
- Validated
- 16 Jan 2026
- Decided
- 13 Apr 2026
- Ward
- Swatragh
- Parish
- Carntogher
- Decision by
- Committee Decision
Timeline
Dates from the published record
-
16 Jan 2026
Received by Mid Ulster
-
13 Apr 2026
Decision issued: Permission Granted
-
29 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Gerard McPeake Architectural Ltd Agent, an architecture practice registered in Belfast
Active · incorporated 2011 · Belfast
12 applications on PlanIndex · across 3 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
- FULL - PERMISSION GRANTED
- STAMPED APPROVED PLANS
- COMMITTEE REPORT 01/04/2026
- DFI ROADS MAGHERAFELT TEAM 2
- STANDARD NN LETTER (BULK)
- STANDARD CONSULTATION LETTER
- P1 FORM REGARDING ACCESS
- SITE LOCATION MAP 01
- PROPOSED SITE PLAN 02
- PROPOSED FRONT AND REAR ELEVATIONS 04
- PROPOSED FLOOR PLAN 03
- PROPOSED GARAGE FLOOR PLANS AND ELEVATIONS 06
- PROPOSED SIDE ELEVATIONS 05
- APPLICATION FORM P1
- ACKNOWLEDGE APP AND FEE RECEIPT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Mid Ulster granted permission on 13 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Between 65 & 67 (Adjacent And N.E. Of 67) Killygullib Road, Swatragh
Proposed site for dwelling and garage
Granted Outline 11 docsDomestic -
63 Killygullib Road Maghera
100% historically approved · decision due ~9 Apr
Construction of shed for machinery storage (Amended description)
Awaiting decision Full applications 14 docsSmall domestic
Other full applications
In Mid Ulster
-
LA09/2026/0805/F Decided
Reid Engineering Ltd Kilcronagh Industrial Estate Cookstown BT80 9HG
Proposed relocation of existing entrance at Kilcronagh Industrial Estate, Cookstown, BT80 9H
-
LA09/2026/1126/F Awaiting decision
49 Church Street Cookstown BT80 8HT
Retention of single storey rear replacement extension with internal alterations to dwelling
-
LA09/2025/0520/F Decided
2 Lisnamuck Road Tobermore BT45 5QF
Production facility shed for the manufacture of decorative paving and walling products
-
LA09/2026/0726/F Decided
Dwelling Known As 80 Aghafad Road (by Applicant) 77 Aghafad Road (postal Address On Maps) Pomeroy BT70 2TR
Extension and alterations to dwelling
-
LA09/2025/0955/F Decided
Lands approximately 80M South of 39 Castle Road Cookstown Tyrone BT80 8TN
3 No. Glamping Pods, Parking, Landscaping and Associated Site Works