Planning application
LA09/2025/1312/LDE
Lands to The rear of Knockmoy Park, Gortevein Terrace and Fronting Gortgonis Terrace, Coalisland
Proposal
Erection of 22 dwellings and ancillary development, amendment to development previously approved by M/2015/0060/F
As published by the council, reference LA09/2025/1312/LDE
Timeline
Dates from the published record
-
18 Dec 2025
Received by Mid Ulster
-
19 Dec 2025
Validated
Checked as complete and ready for consideration.
-
11 Jun 2026
Decision issued: Permission Granted
-
29 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About lawful development applications
How this application type works
A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.
Nearby applications
Within 500 metres
-
LA09/2025/0870/F Awaiting decision
Lands Accessing South of Gortview Park and East of The Pine Bank Gardens, Coalisland
Erection of 10 dwellings and 18 apartments at lands to Gortgonis Road, Coalisland
-
LA09/2026/0552/F Awaiting decision
Site On Gortgonis Road Coalisland adjacent to Sports Field and Occupied By existing Community Center
Application ref LA09/2018/1384/F . We wish to vary condition 4 to allow the development to commence before completion of the new accesses. The school is to open in Sept 2027. To allow sufficient time to construct the new buildings to meet this date work will need to commence on the new structures in the first week of July 2026, however it has become apparent that the works to from the new access will not be complete at this time . This is due to factors outside the control of the applicant and the appointed contractor. NIE are required to relocate existing cabling in the roadway and their programme for this will delay the developers works in forming the new access. If the school is to open in the new academic year works to form the access and new buildings will need to initial run in parallel. It is our understanding that the condition is to partly to mitigate against the risk developers completing development and then failing to provide the access. We feel that there is no risk in this instance as the developer is a Statutory Body (EA) and contracts for all works are in place. The contractor will neccessarily be providing traffiic control around the works areas to facilitate the operations on site and formation of the new roadways . The intensification of use to the site will not occcur until completion. We therefore do not belive that varying the condition will present a greater road safety risk. A programme showing the critical dates which demonstrates the need for the works to both the newaccess and school to be carried out simultaniously is attached. The attached drawing shows the oriiginal phasing plan . By varying the condition we would hope to carry out phases 2+3 and possibly the initial stages of phase 4 in parallel time with phase 1. The exact timings being dependant on the progress of the works by NIE . The intent is to have phase 1 completed as expeditiously and as early in the contract as possible.
-
LA09/2025/1011/O Granted
Land immediately North East of 18 Loughview Road Coalisland
Dwelling
Other lawful development applications
In Mid Ulster
-
LA09/2026/0747/LDP Awaiting decision
2-4 James Street Cookstown
Change of use of a building to a mixed use for any purpose within Class A2 (Financial, Professional and Other Services) of the Schedule to the Use Classes Order and as a single flat, as permitted by Part 4 Class E (b) of the General Permitted Development Order
-
LA09/2026/0454/LDE Granted
39A Macknagh Road, Upperlands, Maghera, BT46 5SG
Retention of change of use of domestic garage to dwelling house to include alterations and extensions
-
LA09/2026/0725/LDP Awaiting decision
11 Killeenan Road Cookstown BT80 9JA
Certificate of Lawfulness for a Proposed Use or Developement (CLPUD) in accordance with Section 170 of the Planning Act (Northern Ireland) 2011 to establish the lawful commencement of planning permission I/2014/0393/F (3 No Semi Detached dwellings and 2 No detached dwellings and associated works)
-
LA09/2025/1115/LDP Granted
Site to rear of 30 Jockey Lane Moy BT71 7SR
2 No detached 1.5 storey houses and domestic garages
-
LA09/2026/0418/LDP Granted
Tobermore Sand and Gravel Pit, Ballybriest, Lough Fea, Cookstown
Proposal for the erection of an aggregate processing plant to process the minerals worked on site. The proposed development will be erected within the existing sand and gravel pit and enclosed from external views by a combination of site topography and mature vegetation.