Proposal
Single storey extension to the rear of the existing dwelling.
As published by the council, reference LA09/2025/1268/F
Timeline
Dates from the published record
-
9 Dec 2025
Received by Mid Ulster
-
10 Dec 2025
Validated
Checked as complete and ready for consideration.
-
19 Mar 2026
Decision issued: Permission Granted
-
29 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
LA09/2025/0837/F Withdrawn
12 Canal Quay Coalisland BT71 4LR
Retention of existing Dog Grooming Parlour
-
LA09/2025/1069/F Granted
12 Canal Quay Coalisland BT71 4LR
Retention of existing dog grooming parlour including extension of curtilage of site
-
LA09/2026/0720/F Awaiting decision
Site adjacent to 2 Millbrook Close Washingbay Road Coalisland
Eerection of 3 no. dwellings within existing 'Millbrook' housing development comprising of 1 no. pair of semi-detached and 1 no. detached dwelling.
-
LA09/2026/0641/F Awaiting decision
17 Columbas Villas Coalisland Tyrone BT71 4PX
Single storey extension to rear of dwelling to provide bedroom,bathroom and utility room
-
LA09/2026/0552/F Awaiting decision
Site On Gortgonis Road Coalisland adjacent to Sports Field and Occupied By existing Community Center
Application ref LA09/2018/1384/F . We wish to vary condition 4 to allow the development to commence before completion of the new accesses. The school is to open in Sept 2027. To allow sufficient time to construct the new buildings to meet this date work will need to commence on the new structures in the first week of July 2026, however it has become apparent that the works to from the new access will not be complete at this time . This is due to factors outside the control of the applicant and the appointed contractor. NIE are required to relocate existing cabling in the roadway and their programme for this will delay the developers works in forming the new access. If the school is to open in the new academic year works to form the access and new buildings will need to initial run in parallel. It is our understanding that the condition is to partly to mitigate against the risk developers completing development and then failing to provide the access. We feel that there is no risk in this instance as the developer is a Statutory Body (EA) and contracts for all works are in place. The contractor will neccessarily be providing traffiic control around the works areas to facilitate the operations on site and formation of the new roadways . The intensification of use to the site will not occcur until completion. We therefore do not belive that varying the condition will present a greater road safety risk. A programme showing the critical dates which demonstrates the need for the works to both the newaccess and school to be carried out simultaniously is attached. The attached drawing shows the oriiginal phasing plan . By varying the condition we would hope to carry out phases 2+3 and possibly the initial stages of phase 4 in parallel time with phase 1. The exact timings being dependant on the progress of the works by NIE . The intent is to have phase 1 completed as expeditiously and as early in the contract as possible.
-
LA09/2026/0522/PAN Awaiting decision
4 Washingbay Road Coalisland BT71 4ND
Demolition of existing buildings, erection of discount foodstore, access, parking, landscaping and associated site works.
Other full applications applications
In Mid Ulster
-
LA09/2026/0757/F Awaiting decision
95 Annaghmakeown Road Dungannon BT70 3DD
Front & rear single storey extensions including associated alterations and raised patio area to front
-
LA09/2026/0755/F Awaiting decision
Between Nos 60 and 62 Carricknakielt Road Maghera
Infill dwelling and garage
-
LA09/2026/0753/F Awaiting decision
Land adjacent and North of 76 Aughrim Road Magherafelt
Expansion of existing rural business to provide 3no. light industrial units with associated parking
-
LA09/2026/0754/F Awaiting decision
18 Hillside Crescent Moy BT71 7SS
Extension to dwelling
-
LA09/2026/0625/F Granted
103A Dunnamore Road Cookstown
Amended access from previously approved under LA09/2023/0003/F, to use existing access and lane