Skip to content
PlanIndex Get alerts
Menu

Planning application

20 Broad Street Magherafelt

Granted Mid Ulster LA09/2025/1110/LBC Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Stonework repairs, roof repairs and some gentle cleaning to all elevations

As published by the council, reference LA09/2025/1110/LBC

Application record

Reference
LA09/2025/1110/LBC
Type
Listed Building Consent
Status
Decided
Decision
Granted As published: Consent Granted
Received
23 Oct 2025
Validated
23 Oct 2025
Decided
26 Jan 2026
Ward
Glebe
Parish
Magherafelt
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 23 Oct 2025

    Received by Mid Ulster

  2. 26 Jan 2026

    Decision issued: Consent Granted

  3. 29 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Ulsterbank Limited Applicant

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

  • STAMPED APPROVED PLANS Drawings accompanying a Decision · 26 Jan 2026
  • LB CONSENT Decision · 26 Jan 2026
  • DELEGATED REPORT (DEL) Report · 26 Jan 2026
  • CONSULTATION LETTER REMINDER Consultation Request · 09 Jan 2026
  • HED RESPONSE Consultee Comment · 09 Jan 2026
  • STANDARD CONSULTATION LETTER Consultation Request · 28 Oct 2025
  • HRA HRA Checklist · 28 Oct 2025
  • SITE LOCATION PLAN AND SITE LAYOUT 01 Site Location Plan · 23 Oct 2025
  • EXISTING ELEVATIONS 03 Existing Elevations · 23 Oct 2025
  • PROPOSED ELEVATIONS 02 Proposed Elevations · 23 Oct 2025
  • APPLICATION FOR PLANNING PERMISSION Application Form · 23 Oct 2025
  • ACKNOWLEDGE APP AND FEE RECEIPT Acknowledgement · 23 Oct 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Mid Ulster granted permission on 26 January 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Mid Ulster

  • Adjacent to Nos. 46 and 48 St. Patrick Street Draperstown BT45 7AL

    Repair, restoration and reuse of existing vacant/decommissioned Grade B2 listed telephone kiosk to house a public access automated external defibrillator (AED), including associated internal fittings, repair and replacement of damaged fabric and glazing, repainting and new signage.

    28 Aug 2026 Heritage and listed buildings
  • LA09/2026/0849/LBC Awaiting decision

    20A High Street Draperstown BT45 7AA

    Roof mounted PV panel installation and internal alterations to include installation of secondary glazing to existing windows.

    Received 14 Aug, published by the council 21 Aug 2026 Heritage and listed buildings
  • Approx 50M North West of 21 Knockmany Road Augher

    Strengthen the existing bridge by repointing and replacing stones which have fallen out using lime crete/mortar out and then pressure spraying with insitu reinforced concrete which will increase the strength of the bridge.

    Received 20 Apr, published by the council 29 Jul 2026 Heritage and listed buildings
  • LA09/2026/0618/LBC Awaiting decision

    2-2A Stonard Street Moneymore BT45 7PN

    Ramped disabled access at front access and rear extension to create store (33sq metres floor area)

    Received 11 Jun, published by the council 29 Jul 2026 Heritage and listed buildings
  • 43-49 Rainey Street Magherafelt

    Refurbishment of the existing unoccupied Market Yard building to the east of the site (Block A as referenced in H/2010/0231/F approval) to provide a facility for dedicated Irish language supported community activity within the town centre.

    Received 17 Mar, published by the council 29 Jul 2026 Heritage and listed buildings