Skip to content
PlanIndex Get alerts
Menu

Planning application

LA09/2025/1011/O

Land immediately North East of 18 Loughview Road Coalisland

Granted Mid Ulster Outline

Proposal

Dwelling

As published by the council, reference LA09/2025/1011/O

Timeline

Dates from the published record

  1. 26 Sep 2025

    Received by Mid Ulster

  2. 29 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 29 Apr 2026

    Decision issued: Permission Granted

  4. 29 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • LA09/2025/0870/F Awaiting decision

    Lands Accessing South of Gortview Park and East of The Pine Bank Gardens, Coalisland

    Erection of 10 dwellings and 18 apartments at lands to Gortgonis Road, Coalisland

    18 Aug 2025 276m away Full applications
  • Lands to The rear of Knockmoy Park, Gortevein Terrace and Fronting Gortgonis Terrace, Coalisland

    Erection of 22 dwellings and ancillary development, amendment to development previously approved by M/2015/0060/F

    18 Dec 2025 372m away Lawful development
  • LA09/2025/0837/F Withdrawn

    12 Canal Quay Coalisland BT71 4LR

    Retention of existing Dog Grooming Parlour

    8 Aug 2025 489m away Full applications
  • 12 Canal Quay Coalisland BT71 4LR

    Retention of existing dog grooming parlour including extension of curtilage of site

    13 Oct 2025 492m away Full applications
  • LA09/2026/0552/F Awaiting decision

    Site On Gortgonis Road Coalisland adjacent to Sports Field and Occupied By existing Community Center

    Application ref LA09/2018/1384/F . We wish to vary condition 4 to allow the development to commence before completion of the new accesses. The school is to open in Sept 2027. To allow sufficient time to construct the new buildings to meet this date work will need to commence on the new structures in the first week of July 2026, however it has become apparent that the works to from the new access will not be complete at this time . This is due to factors outside the control of the applicant and the appointed contractor. NIE are required to relocate existing cabling in the roadway and their programme for this will delay the developers works in forming the new access. If the school is to open in the new academic year works to form the access and new buildings will need to initial run in parallel. It is our understanding that the condition is to partly to mitigate against the risk developers completing development and then failing to provide the access. We feel that there is no risk in this instance as the developer is a Statutory Body (EA) and contracts for all works are in place. The contractor will neccessarily be providing traffiic control around the works areas to facilitate the operations on site and formation of the new roadways . The intensification of use to the site will not occcur until completion. We therefore do not belive that varying the condition will present a greater road safety risk. A programme showing the critical dates which demonstrates the need for the works to both the newaccess and school to be carried out simultaniously is attached. The attached drawing shows the oriiginal phasing plan . By varying the condition we would hope to carry out phases 2+3 and possibly the initial stages of phase 4 in parallel time with phase 1. The exact timings being dependant on the progress of the works by NIE . The intent is to have phase 1 completed as expeditiously and as early in the contract as possible.

    27 May 2026 498m away Full applications

In Mid Ulster

  • LA09/2026/0760/O Awaiting decision

    Approx. 100M NW of 27 Tycanny Road Tycanny Ballygawley

    Application for Outline Planning permission for a dwelling on a farm

    27 Jul 2026 Outline
  • LA09/2026/0752/O Awaiting decision

    Approximately 75M East of 49 Aughrim Rd Magherafelt

    Replacement dwelling under PPS 21 CTY 3

    24 Jul 2026 Outline
  • LA09/2026/0751/O Awaiting decision

    50M North East of 49 Kilrea Road Portglenone

    Renewal of planning application LA09/2023/0482/O

    24 Jul 2026 Outline
  • LA09/2026/0742/O Awaiting decision

    Land approximately 80M North West of 226 Hillhead Road Knockloughrim Magherafelt

    Off site replacement dwelling under PPS 21 CTY 3 with retention of existing building as an outbuilding

    23 Jul 2026 Outline
  • LA09/2026/0738/O Awaiting decision

    Lands immediately North East of 36 Ballymaguigan Road Magherafelt

    Replacement dwelling and garage

    22 Jul 2026 Outline