Skip to content
PlanIndex Get alerts
Menu

Planning application

19B Ballagh Road Clogher BT76 0TQ

Granted Mid Ulster LA09/2025/0872/LDE LD Certificate Existing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Engineering workshop in addition to engineering workshop approved under LA09/2015/1102/F

As published by the council, reference LA09/2025/0872/LDE

Application record

Reference
LA09/2025/0872/LDE
Type
LD Certificate Existing
Status
Permission Granted
Decision
Granted As published: Permission Granted
Received
18 Aug 2025
Validated
21 Aug 2025
Decided
18 Nov 2025
Ward
Fivemiletown
Parish
Clogher Valley
Decision by
Delegated Decision
Postcode
BT76 0TQ

Timeline

Dates from the published record

  1. 18 Aug 2025

    Received by Mid Ulster

  2. 21 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 18 Nov 2025

    Decision issued: Permission Granted

  4. 29 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Neil Irvine Design Limited Agent, a design practice registered in Main Street

Active · incorporated 2009 · Main Street

65 applications on PlanIndex · across 5 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

OHM Engineering Limited Applicant, an engineering consultancy registered in Clogher

Active · incorporated 2012 · Clogher

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

  • STAMPED APPROVED PLANS Drawings accompanying a Decision · 19 Nov 2025
  • STAMPED APPROVED PLANS Drawings accompanying a Decision · 19 Nov 2025
  • APPROVAL - CLUD EXISTING Decision- CLUD Existing · 19 Nov 2025
  • OTHER - PAD, PAN, CLUD, NMC, DETEIA Report · 19 Nov 2025
  • APPLICATION FORM Application Form · 18 Aug 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Mid Ulster granted permission on 18 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About lawful development applications

A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Lands immediately West of 21 Fintona Road Clogher

    LA09/2025/1283/F Submitted 12 Dec 2025 450 yards away

    Residential development comprising of 21 No. dwellings and associated ancillary works.

    Granted Full applications New dwelling 65 docs
    Major scheme

In Mid Ulster

  • LA09/2026/1087/LDP Awaiting decision

    12 Orchard Bank Portglenone BT44 8DU

    Single storey rear extension to dwelling

    Received 26 Oct, published by the council 2 Nov 2026 Lawful development
  • LA09/2026/1055/LDE Awaiting decision

    Lands opposite 19 Ballynagilly Lane, Dunmore, Cookstown, County Tyrone, Bt80 9Su. The Application Relates to The Small Freestanding Shed immediately West of The existing Stone Farm Building.

    Erection of the existing small freestanding agricultural shed used in connection with the working farm for the storage of animal feed, buckets, lambing equipment and other farming implements, with an internal water supply for farm activities. The shed is situated immediately west of the existing stone farm building on lands opposite 19 Ballynagilly Lane, Dunmore, Cookstown, County Tyrone, BT80 9SU, and is identified at Point B on drawing CLUD-A-001. It was erected and substantially completed in August 2021. This application seeks a Certificate of Lawfulness for the erection of the existing shed. Its agricultural use is described to explain the building's function.

    Received 13 Oct, published by the council 14 Oct 2026 Lawful development
  • 8 Rectory Road Tobermore Magherafelt BT455QW

    The installation and commissioning of a 6.05 kWp roof-mounted solar PV. The works include mounting 10 No. solar panels onto an existing agricultural shed roof, installing a 3.68kW hybrid inverter, and an Eddi power diverter (allows excess PV to be used for hot water heating), complete with all associated electrical connections as per the current IET Wiring Regulations, metering, and scaffolding

    Received 1 Jun, published by the council 29 Jul 2026 Lawful development
  • LA09/2026/1000/LDP Awaiting decision

    48 Drumenny Road Ballinderry Cookstown BT80 0BY

    Machinery storage shed

    Received 29 Sep, published by the council 1 Oct 2026 Lawful development
  • LA09/2026/0972/LDP Awaiting decision

    95 Killymeal Road Dungannon BT71 6LG

    Lawful commencement of full planning permission LA09/2021/1551/F (by way of the laying of block work atop foundation in the course of the erection of the dwelling) to allow future completion at a subsequent date.

    Received 18 Sep, published by the council 21 Sep 2026 Lawful development