Planning application
15 The Square Moy Dungannon
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use from a ground floor retail unit (shop) to a ground floor cafe/coffee shop. The change of use consolidates the two ground floor units into one single coffee shop.
As published by the council, reference LA09/2025/0768/LBC
Application record
- Reference
- LA09/2025/0768/LBC
- Category
- Heritage and listed buildings
- Status
- Decided
- Decision
- Granted As published: Consent Granted
- Received
- 22 Jul 2025
- Validated
- 24 Jul 2025
- Decided
- 27 Aug 2026
- Ward
- Moy
- Parish
- Dungannon
- Decision by
- Delegated Decision
Site history
Applications at this address on the Mid Ulster register
This site has had 2 applications since 2025: 2 approved, 0 refused.
-
LA09/2025/0753/F Granted
15 The Square Moy Dungannon
Retention application for the change of use from class A retail to suis generis cafe as part of the works to integrate the ground floor units of 15 and 16 into one consolidated cafe.
Timeline
Dates from the published record
-
22 Jul 2025
Received by Mid Ulster
-
24 Jul 2025
Validated
Checked as complete and ready for consideration.
-
7 Aug 2026
Added to PlanIndex
-
27 Aug 2026
Decision issued: Consent Granted
Documents
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
- LB CONSENT
- DELEGATED REPORT (DEL)
- STAMPED APPROVED PLANS
- HED - HB - CONSULTATION COMMENT
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- HED CONSULTATION RESPONSE
- STANDARD CONSULTATION LETTER
- DESIGN & ACCESS STATEMENT
- STANDARD CONSULTATION LETTER
- MS HISTORIC ENVIRONMENT DIVISION ADMIN PLANNING TEAM
- SITE LOCATION PLAN 01
- EXISTING & PROPOSED PLANS 02
- APPLICATION FORM
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Mid Ulster granted permission on 27 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Other heritage and listed building applications
In Mid Ulster
-
LA09/2026/0896/LBC Decided
Adjacent to Nos. 46 and 48 St. Patrick Street Draperstown BT45 7AL
Repair, restoration and reuse of existing vacant/decommissioned Grade B2 listed telephone kiosk to house a public access automated external defibrillator (AED), including associated internal fittings, repair and replacement of damaged fabric and glazing, repainting and new signage.
-
LA09/2026/0849/LBC Awaiting decision
20A High Street Draperstown BT45 7AA
Roof mounted PV panel installation and internal alterations to include installation of secondary glazing to existing windows.
-
LA09/2026/0406/LBC Granted
Approx 50M North West of 21 Knockmany Road Augher
Strengthen the existing bridge by repointing and replacing stones which have fallen out using lime crete/mortar out and then pressure spraying with insitu reinforced concrete which will increase the strength of the bridge.
-
LA09/2026/0618/LBC Awaiting decision
2-2A Stonard Street Moneymore BT45 7PN
Ramped disabled access at front access and rear extension to create store (33sq metres floor area)
-
LA09/2026/0276/LBC Granted
43-49 Rainey Street Magherafelt
Refurbishment of the existing unoccupied Market Yard building to the east of the site (Block A as referenced in H/2010/0231/F approval) to provide a facility for dedicated Irish language supported community activity within the town centre.