Planning application

St Patricks College 41 Killymeal Road Dungannon

Granted Mid Ulster LA09/2024/1285/F Full

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed extension and alterations to existing secondary school to remove some showers, provide additional pupil toilets, in addition to providing a new external double modular classroom and associated site works.

As published by the council, reference LA09/2024/1285/F

Application record

Reference
LA09/2024/1285/F
Type
Full
Status
Permission Granted
Decision
Granted As published: Permission Granted
Received
30 Oct 2024
Validated
4 Nov 2024
Decided
11 Dec 2024
Ward
Killymeal
Parish
Dungannon
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 30 Oct 2024

    Received by Mid Ulster

  2. 4 Nov 2024

    Validated

    Checked as complete and ready for consideration.

  3. 11 Dec 2024

    Decision issued: Permission Granted

  4. 3 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

bryson architects Agent, an architecture practice registered in Belfast

Active · incorporated 2005 · Belfast

12 applications on PlanIndex · across 7 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

The Trustees of St. Patrick's College Applicant

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

25 documents on file for this application

  • STAMPED APPROVED PLANS Drawings accompanying a Decision · 13 Dec 2024
  • FULL - PERMISSION GRANTED Decision · 13 Dec 2024
  • DELEGATED REPORT (DEL) Report · 13 Dec 2024
  • NORTHERN IRELAND WATER DEVELOPER SERVICES Consultee Comment · 18 Nov 2024
  • TRANSPORT ASSESSMENT FORM Technical Specification · 12 Nov 2024
  • BIODIVERSITY CHECKLIST Additional Appendices · 12 Nov 2024
  • STANDARD CONSULTATION LETTER Consultation Request · 06 Nov 2024
  • ACKNOWLEDGE APP AND FEE RECEIPT Acknowledgement · 04 Nov 2024
  • SITE LOCATION PLAN 01 Site Location Plan · 30 Oct 2024
  • SITE PLAN 02 Site Layout or Block Plan · 30 Oct 2024
  • PROPOSED ELEVATIONS 07 Proposed Elevations · 30 Oct 2024
  • GROUND FLOOR PLAN 05 Proposed Floor Plans · 30 Oct 2024
  • BIODIVERSITY CHECKLIST Technical Specification · 30 Oct 2024
  • TRANSPORT ASSESSMENT FORM Technical Specification · 30 Oct 2024
  • EXISTING SITE PLAN 09 Existing Plans · 30 Oct 2024
  • EXISTING GROUND FLOOR 12 Existing Floor Plans · 30 Oct 2024
  • EXISTING GROUND FLOOR PLAN 13 Existing Floor Plans · 30 Oct 2024
  • EXISTING FIRST FLOOR PLANS 10 Existing Floor Plans · 30 Oct 2024
  • EXISTING FIRST FLOOR PLANS 11 Existing Floor Plans · 30 Oct 2024
  • EXISTING MODULAR PLAN 14 Existing Plans · 30 Oct 2024
  • GROUND FLOOR PLAN OVERALL PLAN 06 Proposed Floor Plans · 30 Oct 2024
  • FIRST FLOOR PLANS 03 Proposed Floor Plans · 30 Oct 2024
  • FIRST FLOOR PLAN OVERALL PLAN 04 Proposed Floor Plans · 30 Oct 2024
  • PROPOSED MODULAR CLASSROOM 08 Proposed Plans · 30 Oct 2024
  • APPLICATION FORM Application Form · 30 Oct 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Mid Ulster granted permission on 11 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Mid Ulster

  • 134 Ballyronan Road Magherafelt BT45 6HR

    Retention of Agricultural Storage / Livestock Building over an Existing Farm Tank

    Received 16 May, published by the council 3 Sep 2026 Full applications
  • 5 Annagher Road Coalisland BT71 4NE

    Demolition of existing dwelling and replace with two semi detached dwellings

    Received 23 Jul, published by the council 21 Oct 2026 Full applications
  • 108 Shore Road Ballyronan Magherafelt Londonderry BT45 6JG

    Replacement dwelling with detached carport/home gym/office

    Received 22 Sep, published by the council 29 Jul 2026 Full applications
  • 38-40 Fairhill Road Cookstown BT80 8AG

    Previous Planning Reference Number: LA09/2025/0562/F Nature/Type of Development Previously Approved: Refurbishment and extension of the existing listed office building, comprising a lobby and lift extension, hard and soft landscaping works, alterations to the existing car park layout, and improvements to the exterior of the building. Condition to be Varied: Condition 2 currently states: "No development shall commence on site until a satisfactory means of public foul sewerage disposal has been agreed with NI Water and Mid Ulster District Council Planning Department." It is proposed that Condition 2 be varied to read: "No development shall commence on site until a satisfactory means of foul sewage disposal, incorporating a site-specific management plan for the safe removal of foul sewage, has been agreed in writing with Mid Ulster District Council Planning Department." Reason for the Variation: The variation is sought in order to achieve an acceptable method of foul sewage disposal.

    Received 23 Jul, published by the council 29 Jul 2026 Full applications
  • LA09/2026/1064/F Awaiting decision

    39 Clabby Road Fivemiletown BT75 0QU

    Extension/alterations to dwelling, domestic garge with loft and relocation of vehicular access

    15 Oct 2026 Full applications