Skip to content
PlanIndex Get alerts
Menu

Planning application

DM/25/0446

Burgess Hill Northern Arc, Land N And NW Of Burgess Hill, Between Bedelands Nature Reserve In The East And, Goddard's Green Waste Water Treatment Works In The West

Decided Mid Sussex Reserved Matters Application

Proposal

The construction of a single carriageway link road from the tie-in with the proposed Western Bridge and Link Road (WBLR), through to the proposed tie-in with Eastern Bridge and Link Road (EBLR) including tie-ins to the existing B2036 Cuckfield Road. The primary east-west route will typically comprise of a new 6.5m carriageway with one 3m shared footway/cycleway and one 2m wide footway and two 2.75m verges. While the 6.5m wide carriageway will be consistent throughout, some sections of the primary east-west route will diverge from this typical arrangement to complement area specific requirements. The northern link to the B2036 Cuckfield Road from the proposed east-west road will consist of a new 6.5m wide carriageway and single 2m footway. The southern link to the B2036 Cuckfield Road from the proposed east-west road will consist of a new 6.5m wide carriageway and a short extension of the Green Super Highway extending to the driveway entrance servicing the existing Oak Barn Bar & Restaurant carpark. The western end of the east-west road corridor and the southern link to the B2036 Cuckfield Road will both facilitate connections to the Green Superhighway. All will be constructed to an adoptable standard, together with associated crossing points, earthworks and vegetation removal, surface water and foul drainage infrastructure, utilities corridors and diversions, road lighting, soft landscaping, including tree-planting and temporary fencing, on-street parking and provision of in-line bus stops for bus services. (Amended plans recieved 15/02/2026).

As published by the council, reference DM/25/0446

Timeline

Dates from the published record

  1. 19 Feb 2025

    Received by Mid Sussex

  2. 28 Feb 2025

    Validated

    Checked as complete and ready for consideration.

  3. 24 Jun 2026

    Decision issued: Permission

  4. 31 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About reserved matters applications

How this application type works

A reserved matters application fills in the detail held back from an earlier outline permission, typically appearance, landscaping, layout, scale or access. The council judges it against the outline permission already granted, not the principle of development, which is settled. It must normally be submitted within three years of the outline decision.

More on reserved matters applications in our guide

Nearby applications

Within 500 metres

  • DM/26/0515 Awaiting decision

    Burgess Hill Northern Arc, Land N And NW Of Burgess Hill, Between Bedelands Nature Reserve In The East And, Goddard's Green Waste Water Treatment Works In The West

    Discharge of planning obligation relating to planning reference DM/21/3279 (original reference DM/18/5114) in relation to Retained Open Space Specification, Retained Open Space Management Company, Retained Open Space Management Plan.

    26 Feb 2026 213m away Conditions
  • DM/26/1565 Awaiting decision

    Burgess Hill Northern Arc, Land N And NW Of Burgess Hill, Between Bedelands Nature Reserve In The East And, Goddard's Green Waste Water Treatment Works In The West

    Discharge of planning obligation for retained open space site visit.

    24 Jun 2026 213m away Conditions

In Mid Sussex

  • DM/26/1771 Awaiting decision

    Land Off Scamps Hill Scaynes Hill Road Lindfield West Sussex

    A reserved matters application (access within site, appearance, layout, scale and landscaping) for 87 dwellings and associated infrastructure.

    20 Jul 2026 Reserved matters
  • DM/26/1186 Awaiting decision

    Land West Of Selsfield Road Ardingly West Sussex

    Reserved Matters application for consideration of consider all outstanding matters (layout, scale, landscaping and appearance) in respect of outline planning permission DM/22/1575 (and the subsequent variation of conditions 2 and 11 through permission DM/23/3250). (Amended plans received 14/07/2026)

    12 May 2026 Reserved matters
  • DM/26/0682 Awaiting decision

    Land At Hurst Farm Hurstwood Lane Haywards Heath West Sussex

    Reserved Matters Application Pursuant to Outline Planning Permission Mid Sussex District Council (MSDC) Reference: DM/25/1630, Lewes District Council (LDC) Reference: LW/2510707 at Hurst Farm, for appearance, layout, scale and landscaping only. (additional ecology information received 28/05/2026).

    17 Mar 2026 Reserved matters
  • DM/26/0131 Awaiting decision

    Land South And West Of Upper Imberhorne School Imberhorne Lane East Grinstead West Sussex

    Approval of Reserved Matters following Outline Planning Permission (Ref. DM/23/2699) relating to appearance, landscaping, layout and scale for 550no. new residential units. (Drainage addendum received 02/04/2026). (Amended plans and information received 20th to 27th May showing revisions to the proposed design, landscaping, highways, housing and sustainability measures) (Surface water calculations received 24/06/2026).

    20 Jan 2026 Reserved matters
  • DM/25/1128 Awaiting decision

    Burgess Hill Northern Arc, Land N And NW Of Burgess Hill, Between Bedelands Nature Reserve In The East And, Goddard's Green Waste Water Treatment Works In The West

    Second phase of the Western Bridge and Link Road, comprising the construction of a two-lane single carriageway road, with 3m shared surface (cyclist/pedestrian) on the west side of the highway, and a segregated 5m cycleway/footway on the east side. Connecting to the first phase of WBLR at the roundabout junction on the A2300. Provision of Western Bridge, spanning 71m, carrying the highway and cycleway/footway over the River Adur and floodplain, connecting with future phases at the eastern extent. Includes provision of access to future residential areas, signalised crossing points, earthworks, surface water and foul drainage infrastructure, utilities corridors, lighting and landscaping. (Amended plans received 22.06.2026).

    29 Apr 2025 Reserved matters