Planning application

Land To The North And South Of Poplar Lane Sproughton Suffolk

Split decision Mid Suffolk DC/22/02093 Discharge of Condition(s)

Part of this application was approved and part refused. The decision notice on the council portal sets out which is which.

Proposal

Discharge of Conditions Application for B/15/00993- Condition 5 (Archaeological Investigation) (Part-Discharge for phase 1B) , Condition 43 (Building for Life 12) and Condition 45 (Energy Statement) (Part-Discharge relating to the Northern Element of phase 1B).

As published by the council, reference DC/22/02093

Application record

Reference
DC/22/02093
Type
Discharge of Condition(s)
Status
Decided
Decision
Part approved, part refused As published: Part Granted/Part Refused
Received
20 Apr 2022
Validated
21 Apr 2022
Decided
9 Nov 2022
Ward
Sproughton & Pinewood
Parish
Sproughton
Decision by
Delegated Decision

Site history

Applications at this address on the Mid Suffolk register

This site has had 4 applications since 2022: 2 approved, 1 refused.

  • DC/26/01067 Granted

    Land To The North And South Of Poplar Lane Sproughton Suffolk

    Application for a Non-Material Amendment relating to DC/20/01058 - This application is to amend the Affordable Housing Plans in order to change the location of the Discount Open Market Dwellings from Phase 1C to 1B.

    Decided 15 Apr 2026 Amendments
  • DC/25/05066 Refused

    Land To The North And South Of Poplar Lane Sproughton Suffolk

    Application for Non-Material Amendment relating to DC/20/01058 - Change the dormer detail on seven 2.5-storey dwellings, from the approved traditional GRP dormer to the Modulite System dormer

    Decided 11 Dec 2025 Amendments
  • DC/25/04917 Granted

    Land To The North And South Of Poplar Lane Sproughton Suffolk

    Application for a Non-Material Amendment relating to DC/20/01058 - amend the length of the southern acoustic fence along the development boundary, due to its positioning on an easement.

    Decided 9 Dec 2025 Amendments

Timeline

Dates from the published record

  1. 20 Apr 2022

    Received by Mid Suffolk

  2. 21 Apr 2022

    Validated

    Checked as complete and ready for consideration.

  3. 9 Nov 2022

    Decision issued: Part Granted/Part Refused

  4. 27 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

Mid Suffolk has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Mid Suffolk

  • DC/26/03850 Awaiting decision

    The National Grid (Bramford To Twinstead Reinforcement) Order 2024

    Submission of details reserved by Requirement 4(1)(d) Landscape and Ecological Management Plan for Stage 6 of the authorised development pursuant to The National Grid (Bramford to Twinstead Reinforcement) Order 2024

    4 Sep 2026 Conditions
  • DC/26/03834 Awaiting decision

    Land East And West Of Aubrey Drive Sudbury Part In The Parish Of Chilton

    Discharge of Conditions Application for DC/21/06676 - 3 (Surface Water Managemet Strategy), 4 (Surface Water Management Strategy - Implementation and maintenance), 6 (Construction Surface Water Management Plan), 8 (Biodiversity Enhancement Strategy), 10 (Archaeological Works), 13 (Construction Management - Environmental protection), 14 (Construction Management - Highway Safety) and 15 (Landscaping Scheme)

    3 Sep 2026 Conditions
  • DC/26/03842 Awaiting decision

    The National Grid (Bramford To Twinstead Reinforcement) Order 2024

    Submission of Details reserved by Requirement 4(a) - Construction Environmental Management Plan for Stages 6-8 of the authorised development pursuant to the The National Grid (Bramford to Twinstead Reinforcement) Order 2024

    3 Sep 2026 Conditions
  • DC/26/03798 Awaiting decision

    Land To The East Of Ely Road Barham Suffolk

    Discharge of Conditions Application for DC/22/06117 - Discharge of Conditions 5 (Advance Planting), 6 (Landscape Management), 7 (Hard and Soft Landscaping), 9 (Open Space and Play Space), 19 (Fire Hydrants), 28 (Ecology Mitigation and Enhancement Measures), 30 (Landscape and Ecological Management Plan), 31 (Lighting Design Scheme for Biodiversity) and 32 (SPA and Ramsar Site)

    2 Sep 2026 Conditions
  • DC/26/03802 Awaiting decision

    The National Grid (Bramford To Twinstead Reinforcement) Order 2024

    Submission of Details reserved by Requirement 6 - Detailed Written Scheme of Investigation (DWSI) for Stage 3 - pursuant to The National Grid (Bramford To Twinstead Reinforcement) Order 2024 to approve area(s) - where no further archaeological investigation is required at land in the vicinity of Trenches 359-366 - as marked on the attached plans.

    2 Sep 2026 Conditions