Skip to content
PlanIndex Get alerts
Menu

Planning application

Thames View Avery Way Allhallows Rochester Medway ME3 9QN

Awaiting decision Medway MC/26/1763

Works: Loft or dormer Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Roof height increase including a gable end design, and installation of rear dormer windows and Juliette balconies.

As published by the council, reference MC/26/1763

Application record

Reference
MC/26/1763
Status
Registered
Received
11 Sep 2026
Validated
11 Sep 2026
Postcode
ME3 9QN

Timeline

Dates from the published record

  1. 11 Sep 2026

    Received by Medway

  2. 14 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 6 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Medway took a median of 55 days over the applications it decided in the last year.

What happens while it is decided

This application is with Medway for determination, against a statutory target of eight weeks. Over the last year Medway's median decision took 55 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Medway's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Avery House Avery Way Allhallows Rochester Medway ME3 9QN

    MC/25/2526 Submitted 24 Dec 2025 0m away

    Application for a Non-Material Amendment on planning application MC/25/1393 to change door and windows position

    Decided Windows or glazing
  • Avery House Avery Way Allhallows Rochester Medway ME3 9QN

    MC/25/2261 Submitted 18 Nov 2025 0m away

    Application for a Non-Material Amendment on planning application MC/25/1393 to change door and windows position and rotation of the annex by 10.9 degrees.

    Refused Windows or glazing
  • Haven Kent Coast Holiday Park Allhallows Rochester Medway ME3 9QD

    MC/26/1570 Submitted 18 Aug 2026 99m away

    72% historically approved · decision due ~13 Oct

    Variation of condition 10 on MC/19/2202 to amend occupancy date to allow the occupation of the holiday accommodation from the 1 February to 31 October each year (inclusive)

    Awaiting decision 2 docs
  • Allhallows Holiday Park Allhallows Rochester Medway ME3 9QD

    MC/25/1605 Submitted 6 Aug 2025 99m away

    72% historically approved · decision due ~1 Oct

    The installation of an enclosure to cover the external swimming pool, including links to the building and associated HVAC equipment, with other associated works

    Decided
  • Allhallows Holiday Park Allhallows Rochester Medway ME3 9QD

    MC/25/2019 Submitted 8 Oct 2025 99m away

    Details pursuant to condition 6 (Drainage) on planning permission MC/25/1605 for the installation of an enclosure to cover the external swimming pool, including links to the building and associated HVAC equipment, with other associated works

    Decided
  • Allhallows Holiday Park Allhallows Rochester Medway ME3 9QD

    MC/25/2469 Submitted 17 Dec 2025 99m away

    Details pursuant to condition 5 (CSWMP) on planning permission MC/25/1605 for the installation of an enclosure to cover the external swimming pool, including links to the building and associated HVAC equipment, with other associated works

    Decided