Planning application
Land At East Hill - Phase 5 Chatham Kent
Works: Trees Major scheme
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Reserved matters application to consider matters of (appearance, layout, landscaping, scale and access) pursuant to outline permission APP/A2280/W/21/3280915 (MC/19/0765 as amended) - Outline planning application with some matters reserved (appearance, layout, scale and landscaping) for construction of up to 800 dwellings, primary school, supporting retail space of up to 150sqm and GP surgery with associated road link between North Dane Way and Pear Tree Lane and other road infrastructure, open space and landscaping
As published by the council, reference MC/26/1440
Application record
- Reference
- MC/26/1440
- Status
- Registered
- Received
- 29 Jul 2026
- Validated
- 29 Jul 2026
- Ward
- Lordswood & Walderslade
Timeline
Dates from the published record
-
29 Jul 2026
Received by Medway
-
4 Aug 2026
Added to PlanIndex
-
7 Aug 2026
Status changed to Registered
-
Decision
Awaiting decision
Decision expected by 23 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Medway took a median of 53 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
67 documents on file for this application
- STATUTORY - NATURAL ENGLAND
- STATUTORY - NATURAL ENGLAND
- STATUTORY - SOUTHERN WATER
- STATUTORY - SOUTHERN WATER
- STATUTORY - NATIONAL HIGHWAYS
- STATUTORY - ACTIVE TRAVEL
- STATUTORY - SGN
- STATUTORY - SGN
- STATUTORY - SPORTS ENGLAND
- STATUTORY - SGN - PART 1
- STATUTORY - SGN - PART 2
- STATUTORY - UKPN - PART 1
- STATUTORY - UKPN - PART 2
- REDACTED
- DAYLIGHT AND SUNLIGHT REPORT
- DAYLIGHT AND SUNLIGHT REPORT_COMPRESSED-316-621
- DESIGN STATEMENT
- PROPOSED DRAINAGE STRATEGY
- SW CATCHMENT PLAN
- DRAINAGE TECHNICAL NOTE PART 1
- DRAINAGE TECHNICAL NOTE PART 2
- DRAINAGE TECHNICAL NOTE PART 3
- TECHNICAL NOTE.PHASE 5.ISSUE2
- HIGHWAYS TECHNICAL NOTE
- SWEPT PATH ANALYSIS
- PLANTING PROPOSAL
- PLANTING PROPOSAL
- PLANTING PROPOSAL
- PLANTING PROPOSAL
- PLANTING PROPOSAL
- TREE PIT OPEN SPACE DETAILS
- TREE PIT BETWEEN PARKING BAYS
- TREE PIT IN SLOPING GROUND
- TYPICAL DETAIL INTERFACE BETWEEN FRONT GARDEN AND PUBLIC LAND
- SECTION THROUGH MEADOW, SCRUB PLANTING AND EXISTING VEGATATION
- SECTION THROUGH FOOTPATH, MEADOW AND ATTENUATION BASIN
- SECTION THROUGH FOOTPATH
- TYPICAL EARTH MOUND
- PLANTING PROPOSAL
- PLANTING PROPOSAL
- PLANTING PROPOSAL
- PLANTING PROPOSAL
- PLANTING PROPOSAL
- PLANTING PROPOSAL
- PLANTING PROPOSAL
- PLANTING PROPOSAL
- PLANTING PROPOSAL
- PLANTING PROPOSAL
- PLANTING PROPOSAL
- PLANTING PROPOSAL
- PLANTING PROPOSAL
- PROPOSED LEVELS STRATEGY
- PLANNING STATEMENT
- PHASE 5 SITE LOCATION PLAN
- PHASE 5 SUSTAINABILITY PLAN
- PHASE 5 MATERIALS PLAN
- PHASE 5 PARKING STRATEGY
- PHASE 5 BUILDING HEIGHTS PLAN
- PHASE 5 TENURE PLAN
- PHASE 5 REFUSE STRATEGY PLAN
- PHASE 5 SITE LAYOUT
- HOUSE TYPE PACK
- STREET SCENES
- ARBORICULTURAL METHOD REPORT
- TREE-TREE PROTECTION PLAN
- VISIBILITY AND ADOPTION
- COVERING LETTER
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Medway for determination, against a statutory target of eight weeks. Over the last year Medway's median decision took 53 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Medway's portal will say. Our guide explains the common types.