Planning application
New Testament Church Of God Vicarage Road Strood Rochester Medway ME2 4DG
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of a single-storey porta cabin at the rear of the church, located externally within the church grounds.
As published by the council, reference MC/26/1397
Application record
- Reference
- MC/26/1397
- Status
- Registered
- Received
- 23 Jul 2026
- Validated
- 10 Aug 2026
- Ward
- Strood North & Frindsbury
- Postcode
- ME2 4DG
Timeline
Dates from the published record
-
23 Jul 2026
Received by Medway
-
10 Aug 2026
Validated
Checked as complete and ready for consideration.
-
11 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Medway took a median of 53 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Medway for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Medway is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
9 St Marys Road Strood Rochester Medway ME2 4DF
89% historically approved · decision due ~27 Mar
Application for a Lawful Development Certificate (existing) for change of use from dwellinghouse (Class C3) to a 6 bedroom house in multiple occupation (Class C4)
DecidedDomestic -
Land Between 17 And 21 Grove Road Rochester ME2 4BX
Construction of 1no. 5-bedroomed property for use as a HMO
Refused Full applications 7 docs -
58-64 Grove Road Strood Rochester Medway ME2 4BY
Change of use of ground floor level from general industrial into offices together with a first floor extension (use class E (g).
Withdrawn Full applications Extension 6 docs -
42 North Street Strood Rochester Medway ME2 4SN
Conversion of existing building and a part two part first floor extension to rear/side to accommodate 7no. self contained flats incorporating 2 dormers and balconies together with associated external works.
Granted Full applications New dwelling Extension +1 15 docs -
98 Grove Road Strood Rochester Medway ME2 4BY
89% historically approved · decision due ~16 Mar
Change of use from dwelling house (Class C3) to 6 bed house in multiple occupation (Class C4). Construction of single storey extension to rear along with an L-shaped dormer to rear and roof lights to front to facilitate living accommodation in the roof space.
Awaiting decision Extension Loft or dormerSmall domestic -
98 Grove Road Strood Rochester Medway ME2 4BY
89% historically approved · decision due ~22 May
Change of use of existing dwellinghouse (Class C3) to a 4-bedroom, 5-person house in multiple occupation (Class C4) together with construction of an L-shaped dormer window to rear and installation of roof lights to front to provide additional living accommodation within roof space and construction of single storey rear extensions
Decided Extension Loft or dormer +1Small domestic