Skip to content
PlanIndex Get alerts
Menu

Planning application

22 Cooling Road High Halstow Rochester Medway ME3 8SA

Awaiting decision Medway MC/26/1318

Works: Extension Loft or dormer Several homes

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Conversion of existing dwelling to form two dwellings together with construction of a single storey front and rear extension, first floor side extension, alterations to roof including installation of roof lights to side to provide additional living accommodation within roof space, conversion of garage into habitable room, installation of solar panels front and side and hardstanding area to front with associated external alterations and hard and soft landscaping

As published by the council, reference MC/26/1318

Application record

Reference
MC/26/1318
Status
Registered
Received
10 Jul 2026
Validated
10 Jul 2026
Ward
Hoo St Werburgh & High Halstow
Parish
High Halstow
Postcode
ME3 8SA

Timeline

Dates from the published record

  1. 10 Jul 2026

    Received by Medway

  2. 27 Jul 2026

    Added to PlanIndex

  3. 7 Aug 2026

    Status changed to Registered

  4. Decision

    Awaiting decision

    Decision expected by 4 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Medway took a median of 55 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

  • NEUTRAL - S TURNER Letter of Representation · 03 Aug 2026
  • APPLICATION FORM REDACTED Application Form · 10 Jul 2026
  • 01 A EXISTING SITE PLAN Drawings · 10 Jul 2026
  • 02 A EXISTING FLOOR PLANS Drawings · 10 Jul 2026
  • 03 A EXISTING ROOF PLAN Drawings · 10 Jul 2026
  • 04 A EXISTING ELEVATIONS Drawings · 10 Jul 2026
  • 05 A EXISTING ELEVATIONS Drawings · 10 Jul 2026
  • 06 D PROPOSED SITE PLAN Drawings · 10 Jul 2026
  • 07 D PROPOSED FLOOR PLANS Drawings · 10 Jul 2026
  • 08 C PROPOSED SECOND FLOOR AND ROOF PLANS Drawings · 10 Jul 2026
  • 09 D PROPOSED FRONT ELEVATION Drawings · 10 Jul 2026
  • 10 D PROPOSED REAR ELEVATION Drawings · 10 Jul 2026
  • 11 D PROPOSED SIDE ELEVATION Drawings · 10 Jul 2026
  • 12 D PROPOSED SIDE ELEVATION Drawings · 10 Jul 2026
  • 13 B EXISTING STREET SCENE Drawings · 10 Jul 2026
  • 14 B PROPOSED STREET SCENE Drawings · 10 Jul 2026
  • 15_PROPOSED FRONT VISUAL Drawings · 10 Jul 2026
  • BR2438 DAS ISSUE 1 Supporting Documents · 10 Jul 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Medway for determination, against a statutory target of eight weeks. Over the last year Medway's median decision took 55 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Medway's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • 25 Cooling Road High Halstow Rochester Medway ME3 8SA

    MC/26/1476 Submitted 4 Aug 2026 0m away

    72% historically approved · decision due ~29 Sep

    Demolition of existing conservatory and rear extensions and the construction of a replacement single-storey rear extension, front dormer roof extension with triple-pitched roof, associated roof alterations and internal remodelling.

    Awaiting decision Extension Loft or dormer +2 6 docs
    Small domestic
  • Plot 1 Land Adjoining 35 Cooling Road High Halstow Rochester Medway ME3 8SA

    MC/26/0053 Submitted 15 Jan 2026 0m away

    Construction of a new dwelling house

    Decided New dwelling
    Domestic
  • 10 Cooling Road High Halstow Rochester Medway ME3 8SA

    MC/26/0164 Submitted 2 Feb 2026 0m away

    Construction of a single storey rear extension and a dormer window to rear to provide additional living accommodation within roof space with associated external alterations - demolition of existing conservatory

    Decided Extension Loft or dormer +2
    Small domestic
  • 27 Cooling Road High Halstow Rochester Medway ME3 8SA

    MC/25/2508 Submitted 19 Dec 2025 0m away

    Construction of a single storey extension to rear -Demolition of existing rear extension

    Decided Extension Demolition
    Small domestic
  • Plot 4, Land Adj. 35 Cooling Rd High Halstow Kent Rochester ME3 8SA

    MC/25/1999 Submitted 6 Oct 2025 0m away

    Application for a Non-Material amendment on planning permission MC/25/0796 to change the roof and ridge height along with replacing the single balcony door with a 2m wide sliding French balcony door, removal of front porch feature and replacement with a modern aluminium canopy and alterations to some window sizes at ground floor level.

    Decided Extension Roofing +1
    Small domestic
  • Notre Songe Cooling Road High Halstow Rochester Medway ME3 8SA

    MC/26/0258 Submitted 12 Feb 2026 0m away

    Construction of a single storey side extension and demolition of the conservatory.

    Decided Extension Demolition
    Small domestic