Planning application
Land South Of Innovation Centre Medway Maidstone Road Chatham Medway ME5 9FD
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction of an 80-bed care home and 11 adult social care units (Class C2) together with associated access, parking and hard and soft landscaping
As published by the council, reference MC/26/1255
Application record
- Reference
- MC/26/1255
- Status
- Registered
- Received
- 1 Jul 2026
- Validated
- 1 Jul 2026
- Ward
- Fort Horsted
- Postcode
- ME5 9FD
Timeline
Dates from the published record
-
1 Jul 2026
Received by Medway
-
27 Jul 2026
Added to PlanIndex
-
7 Aug 2026
Status changed to Registered
-
Decision
Awaiting decision
Decision expected by 26 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Medway took a median of 55 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
74 documents on file for this application
- STATUTORY - SOUTHERN WATER
- STATUTORY - SOUTHERN WATER
- STATUTORY - NATURAL ENGLAND
- OBJECTION - S HAGGERTY
- OBJECTION - M YAQUB
- STATUTORY - SGN
- NEUTRAL - P COLE
- STATUTORY - SGN - PART 1
- STATUTORY - SGN - PART 2
- STATUTORY - SGN - PART 3
- STATUTORY - SOUTHERN WATER PLANNING
- STATUTORY - ENVIROMENT AGENCY
- STATUTORY - KENT POLICE
- REDACTED
- SITE LOCATION PLAN
- PROPOSED ELEVATIONS SHEET 3
- PROPOSED PLAN - RF
- PROPOSED ELEVATIONS BLOCK A
- PROPOSED ELEVATIONS - BLOCK B1 AND B2
- PROPOSED ELEVATIONS BLOCK E
- PROPOSED ELEVATIONS SHEET 1
- PRPOSED ELEVATIONS - BLOCK C
- PROPOSED PLAN - L2
- PROPOSED FLOOR PLAN AND BLOCK PLAN - BLOCK E
- PROPOSED FLOOR PLAN AND BLOCK PLAN - BLOCK A
- PROPOSED FLOOR PLAN AND ROOF PLAN - BLOCK C
- PROPOSED FLOOR PLAN AND ROOF PLAN - BLOCK B1 AND B2
- TREE PROTECTION PLAN
- PROPOSED PLAN - L1
- PROPOSED PLAN - LG
- PROPOSED SITE SECTIONS
- PROPOSED ELEVATIONS SHEET 2
- PROPOSED FLOOR PLAN AND BLOCK PLAN - BLOCK D
- EXISTING SITE PLAN
- PROPOSED ELEVATIONS BLOCK D
- EMISSIONS MITIGATION ASSESSMENT
- ARBORICULTURAL IMPACT ASSESSMENT
- ARBORICULTURAL SURVEY
- ARCHAEOLOGICAL DESK-BASED ASSESSMENT
- DRAINAGE STRATEGY
- ENERGY STATEMENT
- NOISE ASSESSMENT
- MEDWAY CARE HOME GIR MEMO
- GEO ENVIROMENTAL AND GEOTECHNICAL GROUND INVESTIGATION REPORT
- PROPOSED SITE PLAN
- EXPLORATORY BOREHOLE LOCATION PLAN
- PROPOSED SITE PLAN
- PHOTOGRAPHS
- SITE INVESITGATION MEDTHOD DETAILS
- TRIAL PIT
- METHOD REPORT
- ANALYTICAL REPORT
- ILLUSTRATIVE LANDSCAPE SECTIONS
- ILLUSTRATIVE MASTERPLAN
- LANDSCAPE DESIGN STRATEGY
- EXISTING SITE SECTIONS 1 & 2
- UTILITY STATEMENT
- PROPOSED BLOCK PLAN
- DESIGN AND ACCESS STATEMENT PART 1
- DESIGN AND ACCESS STATEMENT PART 2
- DESIGN AND ACCESS STATEMENT PART 3
- DESIGN AND ACCESS STATEMENT PART 4
- DESIGN AND ACCESS STATEMENT PART 5
- DESIGN AND ACCESS STATEMENT PART 6
- ARBORICULTURAL METHOD STATEMENT
- BIODIVERSITY NET GAIN ASSESSMENT
- V5 - THE STATUTORY METRIC MACRO DISABLED
- THE STATUTORY METRIC MACRO DISABLED 1.0.4 HEADLINE RESULTS
- PLANNING STATEMENT
- PRELIMINARY ECOLOGICAL APPRAISAL AND ROOST ASSESSMENT
- FRAMEWORK TRAVEL PLAN
- PARKING MANAGEMENT PLAN
- TRANSPORT STATEMENT
- COVERING LETTER
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Medway for determination, against a statutory target of eight weeks. Over the last year Medway's median decision took 55 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Medway's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Northern Site Innovation Centre Medway Maidstone Road Chatham Medway ME5 9FD
98% historically approved · decision due ~20 Oct
Discharge of conditions; CO1: Confirmation of compliance CO2: Expiry CO3: Deliveries. H1: Highways, H2: Vehicular Visibility Splays, H5: Servicing, H6: Vehicle Turning and Circulation. D1: Drainage, D2: SuDs, D3: Foul Water. C1: Crime Prevention, C2: CEMP. L1: Landscaping, L2: Tree re-planting. G1: UXO Risk Assessment, G2: Land Contamination, G5: Contamination E2: Air Quality, E3: External Lighting, E5: External lighting Scheme A1: Written Scheme of Investigation / Method Statement for Archaeological Evaluation, A2: Submission of Written Archaeological Report, A3: Preservation in Situ and Further Investigation, A4: Publication and Archiving, A5: Archaeology (Code of Conduct) Compliance of application of MC/21/1587 - LDO Confirmation of Compliance (self-certfication) application (Innovation Park Medway MC/19/1556) for the northern part of the site for highways works, parking, drainage, utilities and landscaping to enable future development of plots
Status unknown Conditions Trees 50 docs -
315A Maidstone Road Chatham Medway ME5 9SE
94% historically approved · decision due ~18 Dec
Construction of a single storey extension to front to create an enlarged porch and home office area.
Status unknown Householder Extension 7 docsSmall domestic -
315A Maidstone Road Chatham Medway ME5 9SE
Construction of a single storey extension to rear - demolition of existing conservatory
Decided Extension DemolitionSmall domestic -
Briar Mead 343 Maidstone Road Chatham Medway ME5 9SE
72% historically approved · decision due ~6 Nov
Application for non-material amendment to planning permission MC/15/0846 to move the dwelling 3 metres to the West - enabling easier disabled driver access
Awaiting decisionDomestic -
335 Maidstone Road Chatham Medway ME5 9SE
72% historically approved · decision due ~1 Oct
Construction of two dummy pitched dormers to the side elevation.
Decided Loft or dormer -
387 Maidstone Road Chatham Medway ME5 9SE
72% historically approved · decision due ~30 Sep
Advertisement consent for the installation of various externally non-illuminated signage: (listed Items 01 - 36)
Awaiting decision 5 docs