Skip to content
PlanIndex Get alerts
Menu

Planning application

MC/23/0855

Land To The East Of High Halstow Kent

Granted Medway Outline Application

Proposal

Hybrid Planning Application for (i) Full Planning Application (Phase 1) for the erection of 270 no. residential units (including affordable housing) and the local centre (up to 1,000 sqm Use Classes E and F) with open space, associated vehicle, cycle and pedestrian access off Christmas Lane, upgrade of existing Public Right of Way, associated services and infrastructure, public realm, landscaping and SuDS. (with associated highway works and (ii) Outline Planning Application (all matters except for access, to be reserved for future determination) for the erection of up to 490no. residential units (including affordable housing), and a primary school (Use Class F1(a)) with new vehicular access points, car and cycle facilities and provision of public open space, sustainable drainage and landscaping works.

As published by the council, reference MC/23/0855

Timeline

Dates from the published record

  1. 6 Apr 2023

    Received by Medway

  2. 19 Apr 2023

    Validated

    Checked as complete and ready for consideration.

  3. 22 Jul 2026

    Decision issued: Approval with Conditions

  4. 27 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • MC/26/1334 Status unknown

    Land To The West Of Sharnal Street High Halstow Rochester Medway ME3 8QW

    Construction of 9x residential custom-build dwellings, with access, landscaping and associated works

    13 Jul 2026 429m away Full applications

In Medway

  • MC/26/1058 Granted

    33 Beaufort Road Strood Rochester Medway ME2 3SW

    Application for a Lawful Development Certificate (Proposed) for the construction of a single storey rear extension

    4 Jun 2026 Outline
  • MC/26/1416 Status unknown

    Protea 7 Kit Hill Avenue Walderslade Chatham Medway ME5 9EU

    Application for a Lawful Development Certificate (proposed) for the construction of a single storey rear extension, with roof skylights.

    27 Jul 2026 Outline
  • MC/26/1103 Refused

    Former Reservior To Rear Of Meadow Close And Barn Meadow Upper Halling Rochester Medway ME2 1JY

    Application for a Permission in Principle for the construction of a minimum of 6, maximum of 6 semi- detached dwellinghouses.

    9 Jun 2026 Outline
  • MC/26/1368 Status unknown

    25 Chestfield Close Rainham Gillingham Medway ME8 7DR

    Application for a Lawful Development Certificate (Proposed) for construction of rear dormer and installation of 2 roof windows to facilitate loft conversion

    17 Jul 2026 Outline
  • MC/26/0991 Refused

    93 Cliffe Road Strood Rochester Medway ME2 3DR

    Application for a Lawful Development Certificate (proposed) for internal reconfiguration to form 7th bedroom within existing house of multiple occupation

    22 May 2026 Outline