Skip to content
PlanIndex Get alerts
Menu

Planning application

Warren Wood Community Primary School Arethusa Road Rochester Medway ME1 2UR

Granted Medway MC/21/1613 Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of new pedestrian access, exit and holding area including the addition of two new pedestrian gates fronting Arethusa Road and footpaths within the school site.

As published by the council, reference MC/21/1613

Application record

Reference
MC/21/1613
Type
Full Application
Status
Conditions
Decision
Approval with Conditions
Received
2 Jun 2021
Validated
2 Jun 2021
Decided
16 Aug 2021
Ward
Rochester South & Horsted Ward
Decision by
Delegated Decision
Postcode
ME1 2UR

Timeline

Dates from the published record

  1. 2 Jun 2021

    Received by Medway

  2. 16 Aug 2021

    Decision issued: Approval with Conditions

  3. 20 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Canterbury

67 applications on PlanIndex · across 8 councils · 90% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 32 Arethusa Road Rochester Medway ME1 2TZ

    MC/21/1960 Submitted 1 Jul 2021 68m away

    Construction of a first floor extension over existing garage together with a single storey extension to rear

    Granted Householder Extension 12 docs
    Small domestic
  • 35 Arethusa Road Rochester Medway ME1 2TZ

    MC/23/0276 Submitted 6 Feb 2023 72m away

    Retrospective application for construction of boundary walls/railings to front and side incorporating sliding gates to side.

    Granted Householder 7 docs
    Domestic
  • 6 Warren Wood Road Rochester Medway ME1 2UB

    MC/26/0918 Submitted 14 May 2026 88m away

    89% historically approved · decision due ~9 Jul

    Neighbourhood consultation application for the construction of a single storey extension to rear. The details submitted are as follows: The extension will extend beyond the rear wall of the original dwelling by 4.50 m The maximum height of the proposed extension from the natural ground level is 3.39 m The height at eaves level of the proposed extension measured from the natural ground level is 3 m

    Awaiting decision Extension
    Small domestic
  • 33 Arethusa Road Rochester Medway ME1 2TZ

    MC/26/1054 Submitted 3 Jun 2026 138m away

    89% historically approved · decision due ~29 Jul

    Construction of a two storey side extension and demolition of the utility room.

    Decided Extension Demolition
  • 3 Grizedale Close Rochester Medway ME1 2UX

    MC/26/0353 Submitted 23 Feb 2026 160m away

    89% historically approved · decision due ~20 Apr

    Construction of a two storey rear extension, first floor front extension and garage conversion.

    Decided Extension
  • 33 Warren Wood Road Rochester Medway ME1 2UD

    MC/26/0811 Submitted 29 Apr 2026 181m away

    89% historically approved · decision due ~24 Jun

    Neighbourhood consultation application for the construction of a single storey extension to rear. The details submitted are as follows: The extension will extend beyond the rear wall of the original dwelling by 4.05 m The maximum height of the proposed extension from the natural ground level is 3m The height at eaves level of the proposed extension measured from the natural ground level is 2.6 m

    Awaiting decision Extension
    Small domestic

In Medway

  • MC/26/0198 Granted

    10 Railway Street Chatham Medway ME4 4JL

    Change of use of offices at first and second floor levels to a five-bedroom Class C4 house in multiple occupation with associated external alterations

    5 Feb 2026 Full applications
  • MC/26/0902 Granted

    Chatham Maritime Marina Leviathan Way Chatham Maritime Chatham Medway ME4 4LP

    Installation of a roodberg SPC30 fixed arm boat lift crane.

    12 May 2026 Full applications
  • MC/26/0846 Granted

    141 - 145 High Street Gillingham Medway ME7 1AQ

    Installation of a freestanding telephone apparatus with affixed defibrillator and advert display

    6 May 2026 Full applications
  • MC/26/0850 Granted

    Pavement Fronting 86 High Street Gillingham Medway ME7 1AX

    Installation of a freestanding telephone apparatus with affixed defibrillator

    6 May 2026 Full applications
  • MC/26/0525 Granted

    Airport Works, BAE Systems Marconi Way Rochester Medway ME1 2XX

    Retrospective application for the installation of a two storey portakabin office building

    16 Mar 2026 Full applications