Planning application
159-161 High Street Gillingham Medway ME7 1AQ
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement of existing shopfront
As published by the council, reference MC/19/2846
Application record
- Reference
- MC/19/2846
- Type
- Full Application
- Status
- Conditions
- Decision
- Approval with Conditions
- Received
- 28 Oct 2019
- Validated
- 30 Oct 2019
- Decided
- 19 Dec 2019
- Ward
- Gillingham South Ward
- Decision by
- Delegated Decision
- Postcode
- ME7 1AQ
Timeline
Dates from the published record
-
28 Oct 2019
Received by Medway
-
30 Oct 2019
Validated
Checked as complete and ready for consideration.
-
19 Dec 2019
Decision issued: Approval with Conditions
-
20 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Newcastle Upon Tyne
14 applications on PlanIndex · across 10 councils · 55% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
141 - 145 High Street Gillingham Medway ME7 1AQ
Installation of a freestanding telephone apparatus with affixed defibrillator and advert display
Granted Full applications 13 docs -
141 - 145 High Street Gillingham Medway ME7 1AQ
Advertisement consent for single illuminated six sheet display with automatic change of images at ten second intervals
Granted Advertising 13 docs -
171 - 173 High Street Gillingham Medway ME7 1AQ
Construction of a first and second floor rear extension together with roof terrace at first floor level and balcony at second floor level to facilitate conversion into three flats at first and second floor levels
Withdrawn Full applications New dwelling Extension 10 docsSeveral homes -
144 High Street Gillingham Medway ME7 1AJ
89% historically approved · decision due ~24 Nov
Alterations to main roof to a mansard roof together with construction of dormer windows and installation of roof windows to front and both sides to facilitate one additional flat and extension to existing flats into the roof space to create one additional bedroom in each
Decided New dwelling Extension +2 -
152 - 154 High Street Gillingham Medway ME7 1AJ
89% historically approved · decision due ~13 Oct
Details pursuant to conditions 3 (Cemp transport), 4 (Transport noise) and 5 (Materials) on planning application MC/19/2260 for Redevelopment of the first and second floors to provided 4 two bedroom flats with the inclusion of balconies and terraces to the front and rear. Associated minor internal layout changes at ground floor level to facilitate separate access and means of escape.
Awaiting decision New dwelling 4 docs -
158 - 160 High Street The Britannia Gillingham Medway ME7 1AJ
89% historically approved · decision due ~14 Oct
Advertisement consent for the installation of various externally non-illuminated signage and associated lighting (items A-G.)
Awaiting decision 10 docs
Other full applications applications
In Medway
-
MC/26/0198 Granted
10 Railway Street Chatham Medway ME4 4JL
Change of use of offices at first and second floor levels to a five-bedroom Class C4 house in multiple occupation with associated external alterations
-
MC/26/0902 Granted
Chatham Maritime Marina Leviathan Way Chatham Maritime Chatham Medway ME4 4LP
Installation of a roodberg SPC30 fixed arm boat lift crane.
-
MC/26/0846 Granted
141 - 145 High Street Gillingham Medway ME7 1AQ
Installation of a freestanding telephone apparatus with affixed defibrillator and advert display
-
MC/26/0850 Granted
Pavement Fronting 86 High Street Gillingham Medway ME7 1AX
Installation of a freestanding telephone apparatus with affixed defibrillator
-
MC/26/0525 Granted
Airport Works, BAE Systems Marconi Way Rochester Medway ME1 2XX
Retrospective application for the installation of a two storey portakabin office building