Skip to content
PlanIndex Get alerts
Menu

Planning application

Phases 2, 3 And 4 Land At Penniment Farm Abbott Road Mansfield

Granted Mansfield 2025/0369/CON Discharge of Condition(s)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

DISCHARGE OF CONDITION 6 (DRAWINGS/TECHNICAL SPECIFICATIONS/PHASING PROGRAMME) ON APPLICATION 2018/0552/OUT (OUTLINE PLANNING APPLICATION (INCLUDING THE RESERVED MATTER OF ACCESS) FOR THE DEVELOPMENT OF 16.05 HECTARES OF LAND FOR UP TO 400 DWELLINGS - ALL OTHER MATTERS RESERVED)

As published by the council, reference 2025/0369/CON

Application record

Reference
2025/0369/CON
Type
Discharge of Condition(s)
Status
Awaiting decision
Decision
Grant Discharge of Condition
Received
12 Jun 2025
Validated
16 Jun 2025
Decided
4 Aug 2026
Ward
Pleasley
Decision by
Delegated Decisions

Site history

Applications at this address on the Mansfield register

This site has had 6 applications since 2025: 6 approved, 0 refused.

  • 2025/0494/CON Granted

    Phases 2, 3 And 4 Land At Penniment Farm Abbott Road Mansfield

    DISCHARGE OF CONDITIONS 8 (CONSTRUCTION METHOD STATEMENT), 9 (SITE WIDE DRAINAGE STRATEGY), 10 (SUDS SCHEME), 16 (WASTE STRATEGY) AND CONDITION 19 (DILAPIDATION SURVEY) ON APPLICATION REFERENCE 2025/0341/VCON (VARIATION OF CONDITION 8 (CONSTRUCTION METHOD STATEMENT) ON APPLICATION 2018/0552/OUT (OUTLINE PLANNING APPLICATION (INCLUDING THE RESERVED MATTER OF ACCESS) FOR THE DEVELOPMENT OF 16.05 HECTARES OF LAND FOR UP TO 400 DWELLINGS - ALL OTHER MATTERS RESERVED) - TO ALLOW CONSTRUCTION TRAFFIC TO USE THE WATER LANE ACCESS AT THE START OF THE CONSTRUCTION PERIOD)

    Decided 31 Mar 2026 Conditions
  • 2025/0495/CON Granted

    Phases 2, 3 And 4 Land At Penniment Farm Abbott Road Mansfield

    DISCHARGE OF CONDITIONS 5 (HIGHWAY WORKS) AND 6 (PHASING PROGRAMME) ON PLANNING REFERERENCE 2025/0341/VCON (VARIATION OF CONDITION 8 (CONSTRUCTION METHOD STATEMENT) ON APPLICATION 2018/0552/OUT (OUTLINE PLANNING APPLICATION (INCLUDING THE RESERVED MATTER OF ACCESS) FOR THE DEVELOPMENT OF 16.05 HECTARES OF LAND FOR UP TO 400 DWELLINGS - ALL OTHER MATTERS RESERVED) - TO ALLOW CONSTRUCTION TRAFFIC TO USE THE WATER LANE ACCESS AT THE START OF THE CONSTRUCTION PERIOD)

    Decided 5 Aug 2026 Conditions
  • 2025/0382/CON Granted

    Phases 2, 3 And 4 Land At Penniment Farm Abbott Road Mansfield

    DISCHARGE OF CONDITION 7 (TRAVEL PLAN) ON APPLICATION 2018/0552/OUT (OUTLINE PLANNING APPLICATION (INCLUDING THE RESERVED MATTER OF ACCESS) FOR THE DEVELOPMENT OF 16.05 HECTARES OF LAND FOR UP TO 400 DWELLINGS - ALL OTHER MATTERS RESERVED)

    Decided 19 May 2026 Conditions
  • 2025/0350/CON Granted

    Phases 2, 3 And 4 Land At Penniment Farm Abbott Road Mansfield

    DISCHARGE OF CONDITION 5 (PARKING ARRANGEMENTS, TURNING FACILITES, ROAD WIDTHS, GRADIENTS, SURFACING, STREET LIGHTING, STRUCTURES, VISIBILITY SPLAYS AND DRAINAGE) ON APPLICATION 2018/0552/OUT (OUTLINE PLANNING APPLICATION (INCLUDING THE RESERVED MATTER OF ACCESS) FOR THE DEVELOPMENT OF 16.05 HECTARES OF LAND FOR UP TO 400 DWELLINGS - ALL OTHER MATTERS RESERVED)

    Decided 21 Jul 2026 Conditions
  • 2025/0342/CON Granted

    Phases 2, 3 And 4 Land At Penniment Farm Abbott Road Mansfield

    DISCHARGE OF CONDITION 8 (CONSTRUCTION METHOD STATEMENT) ON APPLICATION 2018/0552/OUT (OUTLINE PLANNING APPLICATION (INCLUDING THE RESERVED MATTER OF ACCESS) FOR THE DEVELOPMENT OF 16.05 HECTARES OF LAND FOR UP TO 400 DWELLINGS - ALL OTHER MATTERS RESERVED)

    Decided 30 Oct 2025 Conditions

Timeline

Dates from the published record

  1. 12 Jun 2025

    Received by Mansfield

  2. 16 Jun 2025

    Validated

    Checked as complete and ready for consideration.

  3. 22 Jul 2026

    Added to PlanIndex

  4. 4 Aug 2026

    Decision issued: Grant Discharge of Condition

  5. 8 Aug 2026

    Status changed to Awaiting decision

    Previously Registered.

Cases linked to this one on the register

  • Application: 2018/0552/OUT (Decided)

Documents

Plans, drawings, consultee responses and the officer's report

43 documents on file for this application

  • Site appraisal sheet APPRAISAL · 04 Aug 2026
  • Decision notice DECISION NOTICE · 04 Aug 2026
  • Ncc highways comments CONSULTEE COMMENT · 31 Jul 2026
  • Highways response CONSULTEE COMMENT · 31 Jul 2026
  • S278 kings mill road east proposed levels DRAWING · 01 Jul 2026
  • S278 kings mill road east construction details DRAWING · 01 Jul 2026
  • S278 kings mill road east road markings and traffic signs DRAWING · 01 Jul 2026
  • S278 kings mill road east site clearance DRAWING · 01 Jul 2026
  • S278 kings mill road east surface finishes and kerbing DRAWING · 01 Jul 2026
  • S278 kings mill road east general arrangement DRAWING · 01 Jul 2026
  • S278 bus stop detail DRAWING · 01 Jul 2026
  • S278 gully catchment plan DRAWING · 01 Jul 2026
  • S278 construction details DRAWING · 01 Jul 2026
  • S278 vehicle tracking DRAWING · 01 Jul 2026
  • S278 dedication plan DRAWING · 01 Jul 2026
  • S278 legal agreement plan DRAWING · 01 Jul 2026
  • Amended s278 setting out plan sheet 1 of 1 AMENDED DRAWING · 01 Jul 2026
  • Amended s278 drainage layout sheet 2 of 2 AMENDED DRAWING · 01 Jul 2026
  • Amended s278 setting out plan sheet 2 of 2 AMENDED DRAWING · 01 Jul 2026
  • Amended s278 drainage layout sheet 1 of 2 AMENDED DRAWING · 01 Jul 2026
  • Amended s278 setting out plan sheet 1 of 2 AMENDED DRAWING · 01 Jul 2026
  • Amended s278 road markings and traffic signs sheet 2 of 2 AMENDED DRAWING · 01 Jul 2026
  • Amended s278 surface finishes and kerbing sheet 2 of 2 AMENDED DRAWING · 01 Jul 2026
  • Amended s278 site clearance sheet 2 of 2 AMENDED DRAWING · 01 Jul 2026
  • Amended s278 general arrangement sheet 2 of 2 AMENDED DRAWING · 01 Jul 2026
  • Amended s278 construction details AMENDED DRAWING · 01 Jul 2026
  • Amended s278 road markings and traffic signs sheet 1 of 2 AMENDED DRAWING · 01 Jul 2026
  • Amended s278 surface finishes and kerbing sheet 1 of 2 AMENDED DRAWING · 01 Jul 2026
  • Amended s278 site clearance sheet 1 of 2 AMENDED DRAWING · 01 Jul 2026
  • Amended s278 general arrangement sheet 1 of 2 AMENDED DRAWING · 01 Jul 2026
  • Amended existing signal equipment site clearance AMENDED DRAWING · 01 Jul 2026
  • Amended chesterfield road/abbott road water lane devt revised mitigation AMENDED DRAWING · 01 Jul 2026
  • Amended chesterfield road/abbott road water lane devt revised mitigation AMENDED DRAWING · 01 Jul 2026
  • Feeder loops design DRAWING · 01 Jul 2026
  • Detailed design drawing DRAWING · 01 Jul 2026
  • Programme of works condition 6 of 2018/0552/out SUPPORTING INFORMATION · 01 Jul 2026
  • Application form - without personal data APPLICATION FORM · 12 Jun 2025
  • Accesses, footways, markings/signals, cycleways, finishes and drainage details DRAWING · 12 Jun 2025
  • Construction details, layouts, site location plan DRAWING · 12 Jun 2025
  • Section 278 skegby road/mansfield road east junction general arrangement DRAWING · 12 Jun 2025
  • Chesterfield road/abbott road water lane devt revised mitigation and existing si DRAWING · 12 Jun 2025
  • Water lane/abbott road signalised junction general arrangement/site location pla DRAWING · 12 Jun 2025
  • Program of works - condition 6 of 2018/0552/out SUPPORTING INFORMATION · 12 Jun 2025

Trade members open them from here.

Open the documents

What this grant of permission means

Mansfield granted permission on 4 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Phase 2 Land At Penniment Farm Abbott Road Mansfield

    2026/0120/CON Submitted 27 Feb 2026 0m away

    DISCHARGE OF CONDITION 15 (PRIVATE DRIVEWAYS) ON APPLICATION 2024/0590/RES (RESERVED MATTERS APPLICATION RELATING TO THE APPEARANCE, LANDSCAPING, LAYOUT AND SCALE FOR 372 DWELLINGS WITH ASSOCIATED INFRASTRUCTURE INCLUDING INTERNAL ACCESS ROADS, DRAINAGE AND AREAS OF PUBLIC OPEN SPACE (FOLLOWING OUTLINE PLANNING)

    Granted Conditions 6 docs
    Major scheme
  • Phases 2, 3 And 4 Land At Penniment Farm Abbott Road Mansfield

    2025/0494/CON Submitted 15 Aug 2025 0m away

    DISCHARGE OF CONDITIONS 8 (CONSTRUCTION METHOD STATEMENT), 9 (SITE WIDE DRAINAGE STRATEGY), 10 (SUDS SCHEME), 16 (WASTE STRATEGY) AND CONDITION 19 (DILAPIDATION SURVEY) ON APPLICATION REFERENCE 2025/0341/VCON (VARIATION OF CONDITION 8 (CONSTRUCTION METHOD STATEMENT) ON APPLICATION 2018/0552/OUT (OUTLINE PLANNING APPLICATION (INCLUDING THE RESERVED MATTER OF ACCESS) FOR THE DEVELOPMENT OF 16.05 HECTARES OF LAND FOR UP TO 400 DWELLINGS - ALL OTHER MATTERS RESERVED) - TO ALLOW CONSTRUCTION TRAFFIC TO USE THE WATER LANE ACCESS AT THE START OF THE CONSTRUCTION PERIOD)

    Granted Conditions 39 docs
    Major scheme
  • Phase 2 Land At Penniment Farm Abbott Road Mansfield

    2025/0460/CON Submitted 24 Jul 2025 0m away

    DISCHARGE OF CONDITIONS 5 (MATERIALS), 6 (BOUNDARY TREATMENTS), 7 (LEAP DETAILS) AND 14 (CYCLE PARKING) ON APPLICATION 2024/0590/RES (RESERVED MATTERS APPLICATION RELATING TO THE APPEARANCE, LANDSCAPING, LAYOUT AND SCALE FOR 372 DWELLINGS WITH ASSOCIATED INFRASTRUCTURE INCLUDING INTERNAL ACCESS ROADS, DRAINAGE AND AREAS OF PUBLIC OPEN SPACE (FOLLOWING OUTLINE PLANNING PERMISSION 2018/0552/OUT))

    Granted Conditions 19 docs
    Major scheme
  • Phases 2, 3 And 4 Land At Penniment Farm Abbott Road Mansfield

    2025/0342/CON Submitted 30 May 2025 0m away

    DISCHARGE OF CONDITION 8 (CONSTRUCTION METHOD STATEMENT) ON APPLICATION 2018/0552/OUT (OUTLINE PLANNING APPLICATION (INCLUDING THE RESERVED MATTER OF ACCESS) FOR THE DEVELOPMENT OF 16.05 HECTARES OF LAND FOR UP TO 400 DWELLINGS - ALL OTHER MATTERS RESERVED)

    Granted Conditions 13 docs
    Major scheme
  • Phases 2, 3 And 4 Land At Penniment Farm Abbott Road Mansfield

    2025/0495/CON Submitted 15 Aug 2025 0m away

    DISCHARGE OF CONDITIONS 5 (HIGHWAY WORKS) AND 6 (PHASING PROGRAMME) ON PLANNING REFERERENCE 2025/0341/VCON (VARIATION OF CONDITION 8 (CONSTRUCTION METHOD STATEMENT) ON APPLICATION 2018/0552/OUT (OUTLINE PLANNING APPLICATION (INCLUDING THE RESERVED MATTER OF ACCESS) FOR THE DEVELOPMENT OF 16.05 HECTARES OF LAND FOR UP TO 400 DWELLINGS - ALL OTHER MATTERS RESERVED) - TO ALLOW CONSTRUCTION TRAFFIC TO USE THE WATER LANE ACCESS AT THE START OF THE CONSTRUCTION PERIOD)

    Granted Conditions 135 docs
    Major scheme
  • Phases 2, 3 And 4 Land At Penniment Farm Abbott Road Mansfield

    2025/0350/CON Submitted 2 Jun 2025 0m away

    DISCHARGE OF CONDITION 5 (PARKING ARRANGEMENTS, TURNING FACILITES, ROAD WIDTHS, GRADIENTS, SURFACING, STREET LIGHTING, STRUCTURES, VISIBILITY SPLAYS AND DRAINAGE) ON APPLICATION 2018/0552/OUT (OUTLINE PLANNING APPLICATION (INCLUDING THE RESERVED MATTER OF ACCESS) FOR THE DEVELOPMENT OF 16.05 HECTARES OF LAND FOR UP TO 400 DWELLINGS - ALL OTHER MATTERS RESERVED)

    Granted Conditions 59 docs
    Major scheme

In Mansfield

  • 2025/0507/CON Granted

    Land At Pleasley Hill Farm Water Lane Pleasley Nottinghamshire

    DISCHARGE OF CONDITION 23 (ARBORICULTURAL METHOD STATEMENT) AND 35 (CONSTRUCTION METHOD STATEMENT) ON APPLICATION 2020/0169/OUT (OUTLINE APPLICATION FOR MIXED USE DEVELOPMENT WITH ALL MATTERS RESERVED EXCEPT FOR ACCESS FOR UP TO 850 DWELLINGS, CLASS E/B8 BUSINESS USE, HOTEL, PETROL FILLING STATION, CARE HOME AND NEIGHBOURHOOD RETAIL) PURSUANT TO PHASE 0 ONLY

    22 Aug 2025 Conditions
  • 2026/0225/CON Granted

    Retail Unit 3 Plot 4 Local Centre Land Adjacent To The A617 Mansfield Ashfield Regeneration Route (Marr) Between Nottingham Road And Southwell Road West Mansfield Nottinghamshire

    DISCHARGE OF CONDITION 39 (HOURS OF OPERATION AND DELIVERIES) ON APPLICATION 2010/0089/ST (OUTLINE PLANNING APPLICATION (INCLUDING THE RESERVED MATTER OF ACCESS) FOR THE DEVELOPMENT OF 169.3 HECTARES OF LAND FOR EMPLOYMENT, COMMERCIAL, RESIDENTIAL, RETAIL, HEALTHCARE, COMMUNITY, EDUCATIONAL AND LEISURE USES INCLUDING THE PROVISION OF A NEW PRIMARY SCHOOL, LOCAL CENTRE, COMMUNITY PARK, LANDSCAPING, HABITAT CREATION AND INFRASTRUCTURE INCLUDING ROADS, DRAINAGE AND SERVICES.)

    22 Apr 2026 Conditions
  • 2026/0148/CON Granted

    Plot 4 - Local Centre Lindhurst Berry Hill Land Between Nottingham Road And Southwell Road West Mansfield NG18 4TE

    DISCHARGE OF CONDITIONS 4 (FOOTWAY WIDENING), 5 (ZEBRA AND CYCLE CROSSING), 6 (RADII), 8 (ACCESS WIDENING), 10 (PEDESTRIAN CROSSINGS), 11 (SURFACE WATER), 13 (SIGNAGE), 16 (EXTERNAL LIGHTING) AND 18 (LITTER AND WASTE MANAGEMENT) ON APPLICATION 2023/0209/RES (RESERVED MATTERS APPLICATION FOR A NEW LOCAL CENTRE - (FOLLOWING OUTLINE PLANNING APPLICATION REFERENCE 2010/0089/ST (INCLUDING THE RESERVED MATTER OF ACCESS) FOR THE DEVELOPMENT OF 169.3 HECTARES OF LAND FOR EMPLOYMENT, COMMERCIAL, RESIDENTIAL, RETAIL, HEALTHCARE, COMMUNITY, EDUCATIONAL AND LEISURE USES INCLUDING THE PROVISION OF A NEW PRIMARY SCHOOL, LOCAL CENTRE, COMMUNITY PARK, LANDSCAPING, HABITAT CREATION AND INFRASTRUCTURE INCLUDING ROADS, DRAINAGE AND SERVICES.))

    11 Mar 2026 Conditions
  • 2026/0222/CON Granted

    Retail Unit 3, Plot 4 - Local Centre Lindhurst Berry Hill Land Between Nottingham Road And Southwell Road West Mansfield NG18 4TE

    DISCHARGE OF CONDITION 22 (PLANT EQUIPMENT) ON APPLICATION 2010/0089/ST (OUTLINE PLANNING APPLICATION (INCLUDING THE RESERVED MATTER OF ACCESS) FOR THE DEVELOPMENT OF 169.3 HECTARES OF LAND FOR EMPLOYMENT, COMMERCIAL, RESIDENTIAL, RETAIL, HEALTHCARE, COMMUNITY, EDUCATIONAL AND LEISURE USES INCLUDING THE PROVISION OF A NEW PRIMARY SCHOOL, LOCAL CENTRE, COMMUNITY PARK, LANDSCAPING, HABITAT CREATION AND INFRASTRUCTURE INCLUDING ROADS, DRAINAGE AND SERVICES.) - RELATING TO UNIT 3 (TESCO EXPRESS) ONLY

    22 Apr 2026 Conditions
  • 2026/0196/CON Granted

    Land To The West Of Balmoral Drive Mansfield Nottinghamshire

    DISCHARGE OF CONDITIONS 7 (SURFACE WATER DRAINAGE) AND 8 (CONSTRUCTION METHOD STATEMENT) ON APPLICATION 2025/0289/FUL (ERECTION OF 34 NO. AFFORDABLE DWELLINGS, LANDSCAPING, HIGHWAY IMPROVEMENTS AND ASSOCIATED WORKS.)

    2 Apr 2026 Conditions