Planning application
12 Billing Avenue Manchester M12 6EZ
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change of use of the existing 5-bedroom dwellinghouse (Use Class C3) to a 4-bedroom House in Multiple Occupation (HMO) (Use Class C4).
As published by the council, reference PLA-2026-001402
Application record
- Reference
- PLA-2026-001402
- Type
- Full planning permission
- Status
- Under Consultation
- Received
- 20 Aug 2026
- Validated
- 20 Aug 2026
- Ward
- Ardwick
- Decision by
- Delegated Decision
- Postcode
- M12 6EZ
Comment by 23 September 2026
The council is taking comments on this application until then. Comments go to Manchester through their own planning portal.
Timeline
Dates from the published record
-
20 Aug 2026
Received by Manchester
-
6 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 15 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Manchester took a median of 55 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Manchester for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
79 Brydon Avenue Manchester M12 6JA
Prior notification of proposed larger home extension for single storey rear extension with a rearward projection of 5 Metres, maximum eaves height of 2.7 Metres and total roof height of 3.8 Metres
Decided Prior approval Extension 5 docsSmall domestic -
Land Bounded By Ardwick Green North, Cotter Street & Niven Street Manchester M12 6EY
Discharge of Conditions 12a (External Plant) and 16 (Drainage Management and Maintenance) attached to Planning Permission 135857/FO/2022.
Granted Conditions 12 docs -
6 Billing Avenue Manchester M12 6EZ
Erection of single storey front and single storey rear extensions.
Granted Householder Extension 7 docsSmall domestic -
Land East of Cotter Street and Fronting Mancunian Way Manchester M12 6HQ
Installation of digital advertisement display screen to replace existing internally illuminated advertisement display and changes to supporting structure.
Granted Advertising 12 docs -
Land Bounded By Ardwick Green North, Cotter Street & Niven Street Manchester M12 6EY
Discharge of Conditions 7 (EV Charging), 8a(Travel Plan), 10b (Contaminated Land), 11 (Acoustic Insulation) and 30 (Archaeology) attached to planning permission 135857/FO/2022
Split decision Conditions 11 docs -
Land Bounded By Ardwick Green North Cotter Street Niven Street M12 6EY
Discharge of Conditions 10b (contaminated land), 11b (acoustic insulation), 12b (external plant), 14 (crime impact) and 16 (drainage maintenance) attached to Planning Permission 135857/FO/2022.
Split decision Conditions 25 docs
Other full applications applications
In Manchester
-
PLA-2026-001359 Awaiting decision
Ground floor of 62-64 Reddish Lane Manchester M18 7JL
Change of Use of the ground floor of 62-64 Reddish Lane from Class E (estate agents) to a tuition and education centre Class F1(a) including bin store and cycle store.
-
PLA-2026-001326 Awaiting decision
10 Fairfield Road Manchester M11 1EW
Change of Use from vacant place of worship/hall (F1/F2 use), to a restaurant lounge and bar (Class E/Sui Generis), together with external alterations and installation of external plant equipment.
-
PLA-2026-000525 Refused
80 Mauldeth Road West Manchester M20 1AB
Change of Use from shop to residential ground floor flat and associated works.
-
PLA-2026-000808 Granted
46 Withenfield Road Manchester M23 9BS
Erection of single-storey detached dwellinghouse with associated car parking landscaping and boundary treatments.
-
144470/FO/2025 Awaiting decision
20 Mayfield Road Manchester M16 8FT
Erection of a single-storey rear extension to form additional accommodation, and elevational alterations to side extension.