Skip to content
PlanIndex Get alerts
Menu

Planning application

Land from Adjacent and Opposite 10 Lordship Close to Kidwall Walk Winston Road Manchester

Awaiting decision Manchester PLA-2026-001369 Removal/variation of conditions

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Variation of Conditions 2 (specified plans), 5 (no further windows), 8 (waste), 9 (car parking spaces) 14 (EV chargers), 15 (Boundary Treatment), 16 (Landscaping), 22 (Bat and Bird Brick), 23 (Cycle Parking) and 29 (Environmental Standards Statement) attached to Planning Permission 141682/FO/2024 to allow for amendments to the design and layout of the previously approved scheme.

As published by the council, reference PLA-2026-001369

Application record

Reference
PLA-2026-001369
Type
Removal/variation of conditions
Status
Under Consultation
Received
1 Sep 2026
Validated
1 Sep 2026
Ward
Moston
Decision by
Delegated Decision

Comment by 24 September 2026

The council is taking comments on this application until then. Comments go to Manchester through their own planning portal.

Timeline

Dates from the published record

  1. 1 Sep 2026

    Received by Manchester

  2. 6 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 27 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Manchester took a median of 55 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

28 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Manchester for determination, against a statutory target of eight weeks. Over the last year Manchester decided amendment applications in a median of 40 days. More in our guide to how long planning decisions take.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

In Manchester

  • 144011/JO/2025 Granted

    271 Oldham Road Manchester M40 7PS

    Variation of planning application 127971/FO/2020 to vary conditions 2 (Specified Plans), 18 (Landscaping), 20 (Noise), and 29 (off site highways) to make elevational alterations, reduce car parking spaces and amend triggers in the conditions

    18 Sep 2025 Amendments
  • OTH-2026-001083 Granted

    Walkers Of Manchester Crabtree Lane Manchester M11 4GU

    Non Material Change to planning permission reference 143419/JO/2025 to allow increase in external floor levels of +100mm, area increase by 3%, roof plan updates following detailed design of PV and Rooflights arrangement, External Wall Louvres added and alterations to boundary treatments and hard landscaping finishes.

    20 Jul 2026 Amendments
  • PLA-2026-001061 Granted

    18 Kempton Road Manchester M19 2GJ

    Variation of Condition 2 (specified plans) attached to Planning Permission 145495/FH/2026 to allow changes to roof form.

    17 Jul 2026 Amendments
  • PLA-2026-000985 Granted

    Sunlight House Seventh & Eighth Floor Quay Street Manchester M3 3JZ

    Variation of condition 2 (Approved Plans) and 5 (Finishes) attached to Listed Building Consent 145027/LO/2026 to reflect internal layout changes and finishes.

    9 Jul 2026 Amendments
  • OTH-2026-001247 Granted

    Birtles House Unit 1 Market Place Civic Centre Manchester M22 5RE

    Non material amendment to planning permission referenced 144669/FO/2025 to allow alterations to the wording of conditions 5 (Metrolink CMP), 7 (electromagnetic compatibility plan), 9 (local labour), 13 (surface water drainage) and 31 (Bird Hazard Management Plan) in order to alter the timescales to facilitate demolition and site clearance works

    5 Aug 2026 Amendments