Planning application
Land Bounded By Metrolink Line To The North, Alan Turing Way To The East, Gibbon Street To The South, And Loverose Street To The West Manchester
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Non-material amendment to planning permission 145358/FO/2026 to amend trigger points of conditions 7b and 7c (Ground Conditions), 15a (Public Realm and Landscaping), 17 (Surface Water Drainage), 26a (Plant Noise), 38 (Gibbon Street Detection Loops) and 39a (Highway Works), and attachment of new condition to allow for a phased development.
As published by the council, reference OTH-2026-001192
Application record
- Reference
- OTH-2026-001192
- Type
- Non-Material Amendment
- Status
- Final
- Decision
- Approve
- Received
- 30 Jul 2026
- Validated
- 30 Jul 2026
- Decided
- 18 Aug 2026
- Ward
- Ancoats & Beswick
- Decision by
- Delegated Decision
Site history
Applications at this address on the Manchester register
This site has had 3 applications since 2026: 2 approved, 0 refused.
-
OTH-2026-001391 Awaiting decision
Land Bounded By Metrolink Line To The North, Alan Turing Way To The East, Gibbon Street To The South, And Loverose Street To The West Manchester
Discharge of Conditions 4 (CMP), 6a (Local Labour - End Use), 7a (Ground Conditions), 8a (Archaeology), 9 (Metrolink CMP), 11a (Contaminated Land), 13 (Street Trees) and 17 (Surface Water Drainage) attached to Planning Permission 145358/FO/2026.
-
145358/FO/2026 Granted
Land Bounded By Metrolink Line To The North, Alan Turing Way To The East, Gibbon Street To The South, And Loverose Street To The West Manchester
Erection of a three-storey entertainment venue (Sui Generis), with associated infrastructure, access, servicing, management, and public realm improvement.
Timeline
Dates from the published record
-
30 Jul 2026
Received by Manchester
-
13 Aug 2026
Added to PlanIndex
-
18 Aug 2026
Decision issued: Approve
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Manchester granted permission on 18 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Other amendment applications
In Manchester
-
144011/JO/2025 Granted
271 Oldham Road Manchester M40 7PS
Variation of planning application 127971/FO/2020 to vary conditions 2 (Specified Plans), 18 (Landscaping), 20 (Noise), and 29 (off site highways) to make elevational alterations, reduce car parking spaces and amend triggers in the conditions
-
OTH-2026-001083 Granted
Walkers Of Manchester Crabtree Lane Manchester M11 4GU
Non Material Change to planning permission reference 143419/JO/2025 to allow increase in external floor levels of +100mm, area increase by 3%, roof plan updates following detailed design of PV and Rooflights arrangement, External Wall Louvres added and alterations to boundary treatments and hard landscaping finishes.
-
PLA-2026-001061 Granted
18 Kempton Road Manchester M19 2GJ
Variation of Condition 2 (specified plans) attached to Planning Permission 145495/FH/2026 to allow changes to roof form.
-
PLA-2026-000985 Granted
Sunlight House Seventh & Eighth Floor Quay Street Manchester M3 3JZ
Variation of condition 2 (Approved Plans) and 5 (Finishes) attached to Listed Building Consent 145027/LO/2026 to reflect internal layout changes and finishes.
-
OTH-2026-001247 Granted
Birtles House Unit 1 Market Place Civic Centre Manchester M22 5RE
Non material amendment to planning permission referenced 144669/FO/2025 to allow alterations to the wording of conditions 5 (Metrolink CMP), 7 (electromagnetic compatibility plan), 9 (local labour), 13 (surface water drainage) and 31 (Bird Hazard Management Plan) in order to alter the timescales to facilitate demolition and site clearance works