Skip to content
PlanIndex Get alerts
Menu

Planning application

CHR/0031

Block 3 & 4 Potato Wharf Manchester M3 4LA

Granted Manchester Construction Hours Extension

Proposal

Request for temporary extension to permitted construction hours relating to planning permission 109335/FO/2015/C1

As published by the council, reference CHR/0031

Timeline

Dates from the published record

  1. 22 Sep 2020

    Received by Manchester

  2. 20 Oct 2020

    Decision issued: Approved

  3. 21 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Manchester is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • 129176/FO/2021 Granted

    Land Beneath The Railway Viaduct, Between The Bridgewater Canal And Adjacent Bridgewater Canal Basin Potato Wharf Manchester M3 4LA

    Installation of 13 mooring service pillars and hoops and erection of an amenity building (shower room, toilet and elsan) together with associated landscaping

    5 Aug 2021 74m away Full applications
  • OTH-2026-000065 Granted

    Trinity Islands, Manchester, M3 4JW

    Discharge of conditions 11 (Piling Phase C1), 14 (CMP Phase C1),17a (Local Labour Phase 1C),61 (CMP Phase C2) ,64a (Local Labour Phase C2)and 148 (Verification ground contamination Phase D2) attached to planning permission 141017/JO/2024

    27 Apr 2026 105m away Conditions
  • 145024/JO/2026 Granted

    Castlefield Viaduct Between Beaufort Street And Egerton Street Manchester M3 4PU

    Variation of Conditions 3 (Drawings), 18(a-d) (BNG HMMP) and 32 (Repairs) attached to Planning Permission 140875/FO/2024 to provide BNG details and repairs including the use of concrete.

    23 Jan 2026 109m away Amendments
  • 145016/JO/2026 Granted

    Castlefield Viaduct Between Beaufort Street And Egerton Street Manchester M3 4PU

    Variation of Condition 2 (Plans) attached to Listed Building Consent 140876/LO/2024 for full details of repairs including the use of concrete in remedial works.

    22 Jan 2026 115m away Amendments
  • 143596/FO/2025 Granted

    Unit 3 Manchester Industrial Centre New Elm Road Manchester M3 4JH

    Creation of temporary storage unit (Use Class B8) for a period of 3 years.

    11 Aug 2025 149m away Full applications
  • 126698/FO/2020 Granted

    Porcelanosa Water Street Manchester M3 4JU

    Proposed re-cladding of elevations over existing cladding and the addition of horizontal LED lighting strips to the elevations

    13 Jul 2020 154m away Full applications