Planning application
Trinity Island Manchester M3 4JW
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of Planning Conditions 11 (Piling Method Statement (Phase C1)), 12a (Surface Water Drainage (Phase C1)), 14 (Construction Management Plan (Phase C1)), 61 (Construction Management Plan (Phase C2)), 17a (Local Benefit Proposal (Phase C1)), 64a (Local Benefit Proposal (Phase C2)) attached to Planning Permission 141017/JO/2024.
As published by the council, reference CDN/25/1224
Application record
- Reference
- CDN/25/1224
- Type
- Approval of details reserved by a condition
- Status
- Final
- Decision
- Granted As published: Approve
- Received
- 22 Dec 2025
- Validated
- 22 Dec 2025
- Decided
- 13 May 2026
- Ward
- Deansgate
- Decision by
- Delegated Decision
- Postcode
- M3 4JW
Site history
Applications at this address on the Manchester register
This site has had 4 applications since 2025: 3 approved, 0 refused.
-
OTH-2026-001120 Granted
Trinity Island Manchester M3 4JW
Discharge of Condition 139 (Signage strategy) for phase D1 attached to Planning Permission 141017/JO/2024.
-
CDN/25/0939 Split decision
Trinity Island Manchester M3 4JW
Discharge of conditions 146 (Flood Verification Report), 148 (Remediation Strategy), 162 (a)and (b) (External Plant Acoustic Report) and 166 (Fume Extraction Report) attached to planning permission 141017/JO/2024 (all for Phase D2).
-
CDN/25/0896 Granted
Trinity Island Manchester M3 4JW
Discharge of conditions 135 (Highways Phase D1), 144 (Vehicle Movement Phase D1), 151 (Drainage Phase D2), 155b (Local Labour Phase D2), 160 (Drainage Phase D2), 161 (ES Phase D2), 163a and B (Noise Commercial Phase D2), 164b (Noise residential Phase D2), 178 (Highways Phase D2), 179 (TV Phase D2) and 188 (Vehicle Movement Phase D2) attached to planning permission 141017/JO/2024.
Timeline
Dates from the published record
-
22 Dec 2025
Received by Manchester
-
13 May 2026
Decision issued: Approve
-
20 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
29 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Manchester granted permission on 13 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land To The East Of Castlefield Bridge Spanning The River Irwell, Extending To Salford In The North And Manchester In The South Manchester
Development of a new utilities bridge and cycleway spanning the River Irwell, situated adjacent to Castlefield Bridge on land in Salford to the North and Manchester to the South. Amendment to approved planning application 103409/FO/2013/C1.
Granted Full applications 7 docs -
Trinity Island Manchester M3 4JW
Discharge of conditions 146 (Flood Verification Report), 148 (Remediation Strategy), 162 (a)and (b) (External Plant Acoustic Report) and 166 (Fume Extraction Report) attached to planning permission 141017/JO/2024 (all for Phase D2).
Split decision Conditions 7 docs -
Land Bounded By The River Irwell To The North & West, Water Street To The East And The A6402 & A57 To The South Manchester
Construction of a mixed use development comprising two podiums of three storeys and five residential (Class C3) towers of 26, 26, 37, 41 and 67 storeys (including podium heights) connected by a new pedestrian bridge. Retail, commercial, leisure (gym and boat club) and community uses (community gallery and events space)(Use Classes A1, A2, A3, A4 or D2), workspace facilities (Class B1) and an educational facility (Class D1) within the lower floors and podium level together with new riverside walkway, public realm and landscaping (including podium level parks). Two levels of parking for 581 cars and 2,532 bicycles and 200 cycle spaces within the public realm areas.
Withdrawn Full applications 105 docs -
Land Adjacent To Water Street Castlefield Manchester M3 4JW
The installation of a 17.5m telecommunications monopole antenna and associated equipment including 3 cabinets.
Refused Full applications 19 docs -
1 New Elm Road Manchester M3 4JH
Application to discharge condition 4 (signage details) of planning permission 119200/JO/2018.
Granted Conditions 9 docs -
Big Yellow Self Storage 1 New Elm Road Manchester M3 4JH
Discharge of Condition 6 (Secured by Design) of planning permission 119200/JO/2018
Granted Conditions 3 docs
Other condition discharge and variation applications
In Manchester
-
OTH-2026-001533 Granted
35 King Street Manchester M2 7AT
Discharge of Condition 5 (Exposed Bulkhead Concealment) attached to Listed Building Consent PLA-2026-000699.
-
OTH-2026-001106 Refused
Land At Hinchley Road Manchester M9 7FG
Discharge of Conditions 10a and 10b (Contaminated land) attached to Planning Permission referenced 143085/FO/2025.
-
OTH-2026-000151 Granted
50 Murrays Mills Bengal Street Manchester M4 6LR
Discharge of conditions 3 (Scaffold), 4 (Making good methodology) and 5 (Materials) pursuant to Listed Building Consent 144574/LO/2025
-
OTH-2026-001028 Granted
Former Apollo Pub Varley Street Manchester M40 7NH
Discharge of conditions 3 (construction management plan), 10b (contaminated land), 12 (coal activity risks), 20 (surface water drainage) and 34 (local labour agreement) attached to planning permission 143295/FO/2025
-
OTH-2026-001502 Granted
Riverpark Trading Estate Riverpark Road Manchester M40 2XR
Discharge of Condition 41 (Solar Panels) attached to Planning Permission 142464/FO/2025.