Planning application
Chorlton High School South Mauldeth Road West Manchester M21 7SX
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application to discharge condition 12 (Highway Works) from planning approval reference 124685/FO/2019
As published by the council, reference CDN/20/0551
Application record
- Reference
- CDN/20/0551
- Type
- Approval of condition application
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 26 Aug 2020
- Validated
- 26 Aug 2020
- Decided
- 7 Oct 2020
- Ward
- Chorlton Park Ward
- Decision by
- Delegated Decision
- Postcode
- M21 7SX
Site history
Applications at this address on the Manchester register
This site has had 5 applications since 2020: 5 approved, 0 refused.
-
CDN/20/0271 Granted
Chorlton High School South Mauldeth Road West Manchester M21 7SX
Discharge of condition numbers: 3 (materials) and 17 (sports facilities) from planning approval reference 124685/FO/2019
-
CDN/20/0133 Granted
Chorlton High School South Mauldeth Road West Manchester M21 7SX
Discharge of condition 6 (Surface Water Drainage) attached to planning permission 124685/FO/2019
-
CDN/20/0079 Granted
Chorlton High School South Mauldeth Road West Manchester M21 7SX
Discharge of condition 32 (Metrolink stability) from planning approval reference 124685/FO/2019
-
CDN/20/0036 Granted
Chorlton High School South Mauldeth Road West Manchester M21 7SX
Discharge of conditions 20 (construction management), 28 (foxes and landscaping), 31 (badger), 33 (electric vehicle charging points) and 36 (hedgehogs) attached to planning permission 124685/FO/2019
Timeline
Dates from the published record
-
26 Aug 2020
Received by Manchester
-
7 Oct 2020
Decision issued: Approved
-
21 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
25 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Manchester granted permission on 7 October 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land At The Hough End Centre And South Of Mauldeth Road West Manchester M21 7SX
Construction of a part three storey, part two storey, part single storey building to provide a new secondary school with associated sports facilities and floodlighting, external landscaping, car park, cycle store and access as well as replacement outdoor provision for a police dog training area and police horse paddocks
Granted Full applications 51 docsSmall domestic -
Land At The Hough End Centre And South Of Mauldeth Road West Manchester M21 7SX
Request for temporary revised construction activity working hours in relation to planning permission 124685/FO/2019 comprising allowing works to continue until 21:00 Monday to Friday.
Granted 4 docs -
Chorlton High School South Mauldeth Road West Manchester M21 7SX
Discharge of condition 32 (Metrolink stability) from planning approval reference 124685/FO/2019
Granted Conditions 4 docs -
Chorlton High School South 550 Mauldeth Road Manchester M21 7AA
Variation of condition numbers: 22 (Sports Facilities Use Times) to allow the use of the facilities Monday to Fridays 08.30 to 21.00hrs Saturdays 09.00 to 21.00hrs, Sunday and Bank Holidays 09:00 to 17:00hrs; Condition 23 (Delivery Times) to allow Deliveries, servicing and collections, including waste collections from 06.30 to 20.00hrs, Monday to Saturday, no deliveries/waste collections on Sundays/Bank Holidays; and, condition 21 (school opening times) from 06.30 to 22.00hrs Mondays to Friday; 08.00 to 21.00hrs on Saturdays; and 08.00 to 17.00hrs on Sundays and Bank Holidays - from planning approval reference 124685/FO/2019
Granted Amendments 8 docs -
Land At The Hough End Centre And South Of Mauldeth Road West Manchester M21 7SX
Non-material change application to application 124685/FO/2019 to allow amendments to previously approved soft landscaping and planting plans and to car park layout.
Granted Amendments 9 docs -
Chorlton High School South Mauldeth Road West Manchester M21 7SX
Discharge of condition 6 (Surface Water Drainage) attached to planning permission 124685/FO/2019
Granted Conditions 7 docs
Other condition discharge and variation applications
In Manchester
-
OTH-2026-000974 Granted
Marriott Residence Inn 40 Laystall St Manchester M1 2JP
Discharge of Condition 4 (Opening Hours) attached to Planning Permission 125369/JO/2019.
-
OTH-2026-000913 Split decision
5 Cotton Hill Manchester M20 4XR
Discharge of Conditions 3 (materials), 4 (waste storage), 6 (electric vehicle charging points), 7 (partial discharge - Secured by Design accreditation), 10 (detailed landscaping scheme) and 12 (construction method statement) attached to Planning Permission 133107/FO/2022.
-
OTH-2026-001266 Split decision
685 Moston Lane Manchester M40 5QD
Discharge of Conditions 8 (Cycle Storage), 9 (EV), 10 (Acoustic Insulation) & 11 (Security) attached to Planning Permission 142547/JO/2025.
-
OTH-2026-001305 Granted
440 Hollinwood Avenue Manchester M40 0AE
Discharge of Condition 15 (Invasive Species) attached to Planning Permission 142670/FO/2025.
-
OTH-2026-001642 Granted
66 Jersey Street Manchester M4 6JW
Discharge of Condition 10b (Ground Conditions) attached to Planning Permission 139289/JO/2024.