Planning application
Gorton Mount Primary Academy Mount Road Manchester M18 7GR
Works: Trees
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of Condition 26 (Tree protection measures) attached to planning permission ref: 123800/JO/2019)
As published by the council, reference CDN/20/0089
Application record
- Reference
- CDN/20/0089
- Type
- Approval of condition application
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 7 Feb 2020
- Validated
- 7 Feb 2020
- Decided
- 25 Mar 2020
- Ward
- Longsight Ward
- Decision by
- Delegated Decision
- Postcode
- M18 7GR
Site history
Applications at this address on the Manchester register
This site has had 4 applications since 2018: 4 approved, 0 refused.
-
123800/JO/2019 Granted
Gorton Mount Primary Academy Mount Road Manchester M18 7GR
Application to vary condition nos. 2 (specified plans), 21 (external lighting) and 32 (boundary treatment) attached to planning permission 120378/FO/2018 to revise the route of the footpath from the car park, with associated changes to lighting and fencing; reduction in parking provision by 1 space, and relocation of the cycle storage facility; elevational alterations; amendments to the roof lights and fascia shapes at roof level; together with revision of the flue design
-
CDN/18/0834 Granted
Gorton Mount Primary Academy Mount Road Manchester M18 7GR
Discharge of conditions 3 (construction management plan), 14 (air quality), 15 (contaminated land), 21 (lighting), 23 (ecology), 26 (biodiversity), 27 (bat and bird boxes), 31 (route widths, levels and gradients) and 32 (boundary treatment) of planning permission 120378/FO/2018
-
120378/FO/2018 Granted
Gorton Mount Primary Academy Mount Road Manchester M18 7GR
Proposed erection of a two-storey primary school with associated playgrounds, all-weather pitch, landscaping, car parking and new vehicular access onto Mount Road following the demolition of the existing building, with retention of existing temporary classroom during construction works
Timeline
Dates from the published record
-
7 Feb 2020
Received by Manchester
-
25 Mar 2020
Decision issued: Approved
-
6 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Cassidy + Ashton Group Ltd. Agent
108 applications on PlanIndex · across 18 councils · 96% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Manchester granted permission on 25 March 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Gorton Mount Academy Mount Road Manchester M18 7GR
Installation of 3 no. non illuminated aluminium signs and 1 no. non illuminated individual letterings aluminium sign affixed to school building
Granted Advertising 5 docs -
Gorton Mount Academy Mount Road Manchester M18 7GR
Application to discharge condition no.10 ( Sustainability) attached to planning permission 123800/JO/2019
Granted Conditions 4 docs -
Gorton Mount Academy Mount Road Manchester M18 7GR
Discharge of condition 4 (landscaping) attached to planning permission ref: 123800/JO/2019
Granted Conditions 8 docs -
Gorton Mount Academy Mount Road Manchester M18 7GR
Discharge of conditions 7 (Travel Plan), 8 (off site highway works) and 28 (Car Parking and Management Plan) attached to planning permission referenced 123800/JO/2019
Granted Conditions 10 docs -
Gorton Mount Academy Mount Road Manchester M18 7GR
Erection of 2.4m high weldmesh fence and gate
Granted Full applications 5 docsSmall domestic -
Gorton Mount Academy Mount Road Manchester M18 7GR
Discharge of condition no.4 (Materials) attached to plannig permission ref: 120378/FO/20184
Granted Conditions 6 docs
Other condition discharge and variation applications
In Manchester
-
OTH-2026-001533 Granted
35 King Street Manchester M2 7AT
Discharge of Condition 5 (Exposed Bulkhead Concealment) attached to Listed Building Consent PLA-2026-000699.
-
OTH-2026-001106 Refused
Land At Hinchley Road Manchester M9 7FG
Discharge of Conditions 10a and 10b (Contaminated land) attached to Planning Permission referenced 143085/FO/2025.
-
OTH-2026-000151 Granted
50 Murrays Mills Bengal Street Manchester M4 6LR
Discharge of conditions 3 (Scaffold), 4 (Making good methodology) and 5 (Materials) pursuant to Listed Building Consent 144574/LO/2025
-
OTH-2026-001028 Granted
Former Apollo Pub Varley Street Manchester M40 7NH
Discharge of conditions 3 (construction management plan), 10b (contaminated land), 12 (coal activity risks), 20 (surface water drainage) and 34 (local labour agreement) attached to planning permission 143295/FO/2025
-
OTH-2026-001502 Granted
Riverpark Trading Estate Riverpark Road Manchester M40 2XR
Discharge of Condition 41 (Solar Panels) attached to Planning Permission 142464/FO/2025.